Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-22-0165, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 249 June 2022Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24
RA-21-0312, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)22 November 2021Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)Post Accident Monitoring
IR 05000261/202100525 August 2021Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005)Fitness for Duty
Cyber Security
Exemption Request
COVID-19
RA-21-0198, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2521 June 2021Inservice Inspection Program Owner'S Activity Report for Refueling Outage 25
RA-20-0353, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1)24 February 2021Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1)Fitness for Duty
Ultimate heat sink
Non-Destructive Examination
Safe Shutdown Earthquake
Coatings
Operating Basis Earthquake
Finite Element Analysis
Foreign Material Exclusion
Exemption Request
Affidavit
RA-19-0479, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies31 December 2019Supplement to Request for License Amendment Regarding Application of Advanced Framatome MethodologiesAnticipated operational occurrence
Affidavit
RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.4630 May 2019Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46
ML18230A75618 August 2018Fault Investigation, Responses to Mr. W. R. Butler'S Letter of May 16, 1975Hydrostatic
Earthquake
ML18230A75918 August 2018Fault Investigation, Progress Report, Volume 1 of 2Coatings
Earthquake
HNP-18-023, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2 May 2018Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment ChangesFuel cladding
Overspeed trip
BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D11 April 2018Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4DWeld Overlay
Dissimilar Metal Weld
RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2 April 2018Report of Changes Pursuant to 10 CFR 50.59(d)(2)Unanalyzed Condition
Open Phase Condition
Fire Watch
Overspeed trip
HNP-17-006, Submittal of Cycle 20 Activity Report30 January 2017Submittal of Cycle 20 Activity ReportThrough Wall Leak
ML17024A03631 December 2016Operating Data Report for 2016Temporary Modification
Biofouling
Power change
Coast down
HNP-16-083, Mitigating Strategies Assessment Report for Flooding Hazard Information21 December 2016Mitigating Strategies Assessment Report for Flooding Hazard InformationUltimate heat sink
Safe Shutdown Earthquake
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
ML16281A51015 December 2016Staff Assessment of the Reactor Vessel Internals Aging Management Program PlansAging Management
Stress corrosion cracking
License Renewal
RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors31 October 2016Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation MonitorsPost Accident Monitoring
ML16176A33928 October 2016Decommissioning Lessons Learned Report and Transmittal MemorandumSafe Shutdown
Fitness for Duty
Anticipated operational occurrence
Cyber Security
Aging Management
Fukushima Dai-Ichi
Containment Hardened Vent
Exemption Request
Fire Protection Program
RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors5 October 2016Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation MonitorsPost Accident Monitoring
RA-16-0024, Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-P3 October 2016Supplemental Information for License Amendment Request Regarding Methodology Report DPC-NE-3008-PSafe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Anticipated operational occurrence
Post Accident Monitoring
Nondestructive Examination
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
Coast down
Affidavit
Manual Operator Action
ML16223A72517 August 2016Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Events) CAC Nos. MF4467 and MF4468)FLEX
Fukushima Dai-Ichi
Earthquake
Hardened vent
3F0616-02, Nrg Commitment Change Report - June 201614 June 2016Nrg Commitment Change Report - June 2016Safe Shutdown
Boric Acid
Offsite Dose Calculation Manual
Time to boil
B.5.b
Pressure Boundary Leakage
Backfit
Operability Assessment
RNP-RA/16-0038, Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-17425 May 2016Transition Report, Revision 1, Transition to National Fire Protection Association Standard 805, with Attachments a, I, J, L, M, and V. Pages 22-174Hot Short
Safe Shutdown
High winds
Mission time
Fire Barrier
Time to boil
Enforcement Discretion
Probabilistic Risk Assessment
Fire impairment
Operator Manual Action
Multiple Spurious Operation
Significance Determination Process
Thermoset
Large early release frequency
Exemption Request
Fire Protection Program
Fire Watch
Very Early Warning Fire Detection
ML15253A41011 March 2016Enclosure 2 Screening Analysis ReportUltimate heat sink
Tornado Missile
Fukushima Dai-Ichi
Earthquake
Generic Issues Program
ML16041A4351 March 2016Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task ForceSafe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
HNP-16-017, Transmittal of Summary of a 10 CFR 50.54(q) Evaluation29 February 2016Transmittal of Summary of a 10 CFR 50.54(q) Evaluation
RA-15-0047, Annual Report of Changes Pursuant to 10 CFR 50.4617 November 2015Annual Report of Changes Pursuant to 10 CFR 50.46
ML15301A5572 November 2015Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request Flood Causing Mechanisms ReevaluationsTornado Missile
Fukushima Dai-Ichi
ML15280A19919 October 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force ReviewSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
RNP-RA/15-0053, Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)19 August 2015Compliance Letter and Final Integrated Plan in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-04)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Mission time
Fire Barrier
Tornado Missile
Time to boil
FLEX
B.5.b
Fukushima Dai-Ichi
Severe Accident Management Guideline
Time Critical Operator Action
Earthquake
Scaffolding
Weak link
GOTHIC
Unidentified leakage
RA-15-0022, Annual Report of Changes Pursuant to 10 CFR 50.4614 May 2015Annual Report of Changes Pursuant to 10 CFR 50.46
ML15126A08930 April 2015EAL BasesSafe Shutdown
Boric Acid
Time of Discovery
High winds
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Safeguards Contingency Plan
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
Unidentified leakage
HNP-15-027, Flood Hazard Reevaluation Report, Revision 11 April 2015Flood Hazard Reevaluation Report, Revision 1Safe Shutdown
Ultimate heat sink
Hydrostatic
RNP-RA/15-0018, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux Channel26 February 2015Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Power Range Neutron Flux ChannelPost Accident Monitoring
BSEP 15-0004, Enclosure 3 - Areva Operability Assessment. (CR 2014-7395)13 January 2015Enclosure 3 - Areva Operability Assessment. (CR #2014-7395)Safety Limit Minimum Critical Power Ratio
Operability Assessment
BSEP 14-0131, Expedited Seismic Evaluation Process Report in Response to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident18 December 2014Expedited Seismic Evaluation Process Report in Response to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi AccidentHigh Radiation Area
Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Earthquake
Power-Operated Valves
Power Operated Valves
ML14297A26624 October 2014Record of Review, Brunswick Steam Electric Plant, Units 1 and 2, LAR Attachment U- Table U-1 Internal Events PRA Peer Review- Facts and Observations (F&Os), 10/24/14GOTHIC
BSEP 14-0101, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors4 September 2014Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors
BSEP 14-0093, Report of 10 CFR 50.59 Evaluations and Commitment Changes14 August 2014Report of 10 CFR 50.59 Evaluations and Commitment ChangesAging Management
License Renewal
Commercial Grade
Control of Heavy Loads
Through-Wall Leak
RNP-RA/14-0037, Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System8 April 2014Response to NRC Request for Additional Information Regarding License Amendment Request to Modify Technical Specification 3.4.12, Low Temperature Overpressure Protection System
HNP-14-035, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.327 March 2014Seismic Hazard and Screening Report (CEUS Sites), Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
RNP-RA/14-0012, Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3....12 March 2014Flood Hazard Reevaluation Report, Response to NRC 10 CFR 50.54(f) Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3....
ML13277A04119 September 2013Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 EditionSafe Shutdown
High winds
Ultimate heat sink
Non-Destructive Examination
Mission time
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Enforcement Discretion
Probabilistic Risk Assessment
Fire impairment
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Scram Discharge Volume
Large early release frequency
Exemption Request
Fire Protection Program
Fire Watch
Very Early Warning Fire Detection
RNP-RA/13-0079, Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure Transmitter21 August 2013Technical Specifications (TS) Section 5.8.6, Post Accident Monitoring (PAM) Instrumentation Report, 14-Day Report for the Inoperability of the Wide Range Containment Pressure TransmitterPost Accident Monitoring
HNP-13-083, Submittal of Summaries of 10 CFR 50.54(q) Evaluations1 August 2013Submittal of Summaries of 10 CFR 50.54(q) Evaluations
RNP-RA/13-0066, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve Indication24 June 2013Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for the Pressurizer Safety Valve IndicationPost Accident Monitoring
HNP-13-046, Report of Changes Pursuant to 10 CFR 50.5929 April 2013Report of Changes Pursuant to 10 CFR 50.59Safe Shutdown
Ultimate heat sink
Tornado Missile
Coatings
Tornado-Generated Missile
Tornado Generated Missile
RNP-RA/13-0037, Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 201225 April 2013Independent Spent Fuel Storage Installation, Annual Individual Exposure Monitoring Report for 2012
BSEP 13-0030, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events28 February 2013Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsSafe Shutdown
High winds
Ultimate heat sink
Safe Shutdown Earthquake
Operating Basis Earthquake
Operator Manual Action
FLEX
Design basis earthquake
Spent Fuel Pool Instrumentation
Coast down
3F0113-08, Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Re31 January 2013Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI ResShutdown Margin
Anticipated operational occurrence
Fuel cladding
Power Uprate
Manual Operator Action