Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RS-07-014, Request for Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation Scram Discharge Volume Level Instrumentation Surveillance Requirements | 26 January 2007 | Request for Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation Scram Discharge Volume Level Instrumentation Surveillance Requirements | Mission time Probabilistic Risk Assessment Scram Discharge Volume Large early release frequency Fuel cladding Failure to Scram |
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program | 29 November 2004 | Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program | Safe Shutdown Unanalyzed Condition |
ML032721606 | 25 September 2003 | Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.5-1 Through 2.5-9 | Environmental Justice |
ML032721615 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Attachment A-5, Geovision Suspension Logging Report | |
ML032721613 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Table of Contents, Appendix a, Attachment A-4, Stratigraphics Cone Penetrometer Test Report | |
ML032721611 | 25 September 2003 | Site Redress Plan for the Exelon Generation Company, LLC Early Site Permit | Time of Discovery Ultimate heat sink |
ML032721610 | 25 September 2003 | Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Chapter 9, Through Table B-1 | License Renewal Environmental Justice |
ML032721609 | 25 September 2003 | Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figure 5.1-3 Through Chapter 8 | Safe Shutdown Ultimate heat sink Grab sample Hydrostatic Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report License Renewal Deep Dose Equivalent Fuel cladding |
ML032721607 | 25 September 2003 | Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.7-1 Through 2.7-18 | |
ML032721608 | 25 September 2003 | Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Chapter 3 Through Figure 5.1-2 | Safe Shutdown Time of Discovery High winds Ultimate heat sink Anticipated operational occurrence Coatings Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Stress corrosion cracking License Renewal Fuel cladding Environmental Justice Uranium Hexafluoride Siren Power Uprate |
ML032721619 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Attachment A-7, Results of Resonant Column/Cyclic Torsional Shear Testing | Earthquake |
ML032721605 | 25 September 2003 | Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.3-16 Through 2.4-3 | |
ML032721604 | 25 September 2003 | Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.3-7 Through 2.3-15 | Ultimate heat sink |
ML032721603 | 25 September 2003 | Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.1-4 Through 2.3-6 | |
ML032721602 | 25 September 2003 | Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Table of Contents Through Figure 2.1-3 | Safe Shutdown High winds Ultimate heat sink Safe Shutdown Earthquake Annual Radioactive Effluent Release Report Environmental Justice Power Uprate |
ML032721601 | 25 September 2003 | Emergency Plan for the Exelon Generation Company, LLC Early Site Permit, Chapter 10 Through Appendiix C, References | Safe Shutdown Health Physics Network High Radiation Area Earthquake Deep Dose Equivalent Fire Protection Program Power change Siren Potassium iodide |
ML032721600 | 25 September 2003 | Emergency Plan for the Exelon Generation Company, LLC Early Site Permit, Table of Contents Through Chapter 9, Section 9.2.3 | Safe Shutdown Fitness for Duty Health Physics Network Nuclear Accident Reporting System Incorporated by reference Severe Accident Management Guideline Earthquake Minimum staff Siren Potassium iodide |
ML032721599 | 25 September 2003 | Administrative Information for the Exelon Generation Company, LLC Early Site Permit | Health Physics Network Ultimate heat sink Offsite Dose Calculation Manual Safe Shutdown Earthquake Nuclear Accident Reporting System Severe Accident Management Guideline Deep Dose Equivalent Potassium iodide |
ML032721617 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Attachment A-6, TSC, Laboratory Test Results | |
ML032721620 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Geotechnical Report, Table of Contents Through Figure 5-24 | Ultimate heat sink Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML032721621 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Chapter 6, Response of Soil and Rock to Dynamic and Static Loading | Safe Shutdown Earthquake Design basis earthquake Earthquake |
ML032730608 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Attachment 1, Table of Contents Through Figure B-1-6 | Coatings Earthquake |
ML032730609 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Attachment 1, Figures B-1-6 Through B-1-11 | |
ML032730610 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Attachment 1, Figures B-1-12 Through Figure B-2-2 | Earthquake |
ML032730612 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Table of Contents Through Figure 2.1-19 | Safe Shutdown Earthquake Earthquake Fatality |
ML032730613 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Figures 2.1-20 Through Plate 1 | Safe Shutdown Earthquake Probabilistic Risk Assessment Earthquake |
ML032730614 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Table of Contents Through Figure 2.1-2 | Safe Shutdown High winds Ultimate heat sink Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake Annual Radioactive Effluent Release Report Earthquake Fatality Power Uprate |
ML032730615 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.1-3 Through 2.4-1 | |
ML032730616 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-2 Through 2.4-11 | |
ML032730617 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-12 Through 2.4-19 | Ultimate heat sink |
ML032730618 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-20 Through 2.5-5 | |
ML032730619 | 25 September 2003 | Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.5-6 Through Chapter 3, Table 3.3-33 | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Earthquake Deep Dose Equivalent Fuel cladding |
ML032721594 | 25 September 2003 | Submittal of Exelon Generation Company (EGC) Application for an Early Site Permit (ESP) for Property co-located with Existing Clinton Power Station (CPS) Facility in Illinois |