Text

Environmental Report for the EGC Early Site Permit Figure 2.7-1 Number of Tornadoes per County (1916-1969) 54 Year Period Legend 9 denotes the number of tornadoes reported in Iroquois County during the period 1916-1969 Data Source:

CPS, 2002 N

Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-2 Topographical Map of the Site Area Meteorological Tower Location Legend MICROWAVE Site Boundary: Fenceline TOWER Proposed Areas for EGC ESP Facility Structures EXISTING STRUCTURE PROPOSED SITE METEOROLOGICAL TOWER Data Sources:

USGS, 1984 and 1989 Boone Jo DaviessStephenson McHenryLake Winnebago Carroll Ogle DeKalbKane Whiteside Lee DuPageCook Rock Island Kendall Bureau Will Henry La Salle Mercer Grundy Putnam Kankakee Stark Marshall Knox HendersonWarren PeoriaWoodford Livingston Iroquois McDonough Ford Hancock Fulton Tazewell McLean Mason Schuyler LoganDeWittChampaignVermilion AdamsBrown Cass Menard Piatt Macon MorganSangamon Douglas Pike Edgar Scott Christian MoultrieColes Greene Shelby Calhoun Macoupin Clark Jersey Montgomery Effingham Cumberland Fayette JasperCrawford MadisonBond ClayRichlandLawrence Clinton Marion St. Clair Wayne Wabash Monroe WashingtonJefferson HamiltonWhite Edwards Miles RandolphPerry Franklin 0 0.125 0.25 0.5 Jackson SalineGallatin Williamson Johnson Hardin Union Pope AlexanderPulaskiMassac

Environmental Report for the EGC Early Site Permit Figure 2.7-3 Wind Rose, 10-Meter Level, Clinton Power Station Site, Period of Record:

4/14/72-4/30/77 Legend Data Source:

CPS, 2002 Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-4 Wind Rose, 10-Meter Level, Clinton Power Station Site, Composite January Period of Record: 4/14/72-4/30/77 Legend Data Source:

CPS, 2002 Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-5 Wind Rose, 10-Meter Level, Clinton Power Station Site, Composite February Period of Record: 4/14/72-4/30/77 Legend Data Source:

CPS, 2002 Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-6 Wind Rose, 10-Meter Level, Clinton Power Station Site, Composite March Period of Record: 4/14/72-4/30/77 Legend Data Source:

CPS, 2002 Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-7 Wind Rose, 10-Meter Level, Clinton Power Station Site, Composite April Period of Record: 4/14/72-4/30/77 Legend Data Source:

CPS, 2002 Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-8 Wind Rose, 10-Meter Level, Clinton Power Station Site, Composite May Period of Record: 4/14/72-4/30/77 Legend Data Source:

CPS, 2002 Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-9 Wind Rose, 10-Meter Level, Clinton Power Station Site, Composite June Period of Record: 4/14/72-4/30/77 Legend Data Source:

CPS, 2002 Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-10 Wind Rose, 10-Meter Level, Clinton Power Station Site, Composite July Period of Record: 4/14/72-4/30/77 Legend Data Source:

CPS, 2002 Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-11 Wind Rose, 10-Meter Level, Clinton Power Station Site, Composite August Period of Record: 4/14/72-4/30/77 Legend Data Source:

CPS, 2002 Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-12 Wind Rose, 10-Meter Level, Clinton Power Station Site, Composite September Period of Record: 4/14/72-4/30/77 Legend Data Source:

CPS, 2002 Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-13 Wind Rose, 10-Meter Level, Clinton Power Station Site, Composite October Period of Record: 4/14/72-4/30/77 Legend Data Source:

CPS, 2002 Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-14 Wind Rose, 10-Meter Level, Clinton Power Station Site, Composite November Period of Record: 4/14/72-4/30/77 Legend Data Source:

CPS, 2002 Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-15 Wind Rose, 10-Meter Level, Clinton Power Station Site, Composite December Period of Record: 4/14/72-4/30/77 Legend Data Source:

CPS, 2002 Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-16 N

NNW NNE Wind Rose, 10-Meter Level, Clinton Power Station Site, Period of Record: 1/1/00-8/31/02 NW NE Legend

> 8.0 1.0 - 3.0 3.1 - 8.0 WNW ENE 3% 6% 9% 12% 15%

W E

WSW ESE Data Source:

CPS, 2002 SW SE SSW SSE S

Not to Scale

Environmental Report for the EGC Early Site Permit Figure 2.7-17 5-mi Topographic Map Within 5 mi of the EGC ESP Site Legend Vicinity: 5-mi Radius Around Site Proposed Areas for EGC ESP Facility Structures 5

22 0

22 Data Sources:

USGS, 1984 and 1989 Boone Jo DaviessStephenson McHenryLake Winnebago Carroll Ogle DeKalbKane Whiteside Lee DuPageCook Rock Island Kendall Will Henry Bureau La Salle Mercer Grundy Putnam Stark Kankakee Marshall Knox HendersonWarren PeoriaWoodford Livingston Iroquois McDonough Ford Hancock Fulton Tazewell McLean Schuyler Mason LoganDeWittChampaignVermilion AdamsBrown Cass Menard Piatt Macon MorganSangamon Douglas Pike Edgar Scott Christian MoultrieColes Greene Shelby Calhoun Macoupin Clark Jersey Montgomery Effingham Cumberland Fayette JasperCrawford MadisonBond ClayRichlandLawrence Clinton Marion St. Clair Wayne Wabash Monroe WashingtonJefferson Edwards RandolphPerry HamiltonWhite Miles Franklin 0 1 2 4 Jackson SalineGallatin Williamson Johnson Hardin Union Pope AlexanderPulaskiMassac

Environmental Report for the EGC Early Site Permit Figure 2.7-18 Topographical Cross Section as a Function of the Distance From the Exelon ESP Site Data Source:

CPS, 2002 Not to Scale