Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-07-014, Request for Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation Scram Discharge Volume Level Instrumentation Surveillance Requirements26 January 2007Request for Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation Scram Discharge Volume Level Instrumentation Surveillance RequirementsMission time
Probabilistic Risk Assessment
Scram Discharge Volume
Large early release frequency
Fuel cladding
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program29 November 2004Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity ProgramSafe Shutdown
Unanalyzed Condition
ML03272160625 September 2003Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.5-1 Through 2.5-9Environmental Justice
ML03272161525 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Attachment A-5, Geovision Suspension Logging Report
ML03272161325 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Table of Contents, Appendix a, Attachment A-4, Stratigraphics Cone Penetrometer Test Report
ML03272161125 September 2003Site Redress Plan for the Exelon Generation Company, LLC Early Site PermitTime of Discovery
Ultimate heat sink
ML03272161025 September 2003Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Chapter 9, Through Table B-1License Renewal
Environmental Justice
ML03272160925 September 2003Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figure 5.1-3 Through Chapter 8Safe Shutdown
Ultimate heat sink
Grab sample
Hydrostatic
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
License Renewal
Deep Dose Equivalent
Fuel cladding
ML03272160725 September 2003Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.7-1 Through 2.7-18
ML03272160825 September 2003Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Chapter 3 Through Figure 5.1-2Safe Shutdown
Time of Discovery
High winds
Ultimate heat sink
Anticipated operational occurrence
Coatings
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
License Renewal
Fuel cladding
Environmental Justice
Uranium Hexafluoride
Siren
Power Uprate
ML03272161925 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Attachment A-7, Results of Resonant Column/Cyclic Torsional Shear TestingEarthquake
ML03272160525 September 2003Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.3-16 Through 2.4-3
ML03272160425 September 2003Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.3-7 Through 2.3-15Ultimate heat sink
ML03272160325 September 2003Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.1-4 Through 2.3-6
ML03272160225 September 2003Environmental Report for the Exelon Generation Company, LLC Early Site Permit, Table of Contents Through Figure 2.1-3Safe Shutdown
High winds
Ultimate heat sink
Safe Shutdown Earthquake
Annual Radioactive Effluent Release Report
Environmental Justice
ML03272160125 September 2003Emergency Plan for the Exelon Generation Company, LLC Early Site Permit, Chapter 10 Through Appendiix C, ReferencesSafe Shutdown
Health Physics Network
High Radiation Area
Earthquake
Deep Dose Equivalent
Fire Protection Program
Power change
Siren
ML03272160025 September 2003Emergency Plan for the Exelon Generation Company, LLC Early Site Permit, Table of Contents Through Chapter 9, Section 9.2.3Safe Shutdown
Fitness for Duty
Health Physics Network
Nuclear Accident Reporting System
Incorporated by reference
Severe Accident Management Guideline
Earthquake
Minimum staff
Siren
ML03272159925 September 2003Administrative Information for the Exelon Generation Company, LLC Early Site PermitHealth Physics Network
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Nuclear Accident Reporting System
Severe Accident Management Guideline
Deep Dose Equivalent
ML03272161725 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Attachment A-6, TSC, Laboratory Test Results
ML03272162025 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Geotechnical Report, Table of Contents Through Figure 5-24Ultimate heat sink
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML03272162125 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix a, Chapter 6, Response of Soil and Rock to Dynamic and Static LoadingSafe Shutdown Earthquake
Design basis earthquake
Earthquake
ML03273060825 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Attachment 1, Table of Contents Through Figure B-1-6Coatings
Earthquake
ML03273060925 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Attachment 1, Figures B-1-6 Through B-1-11
ML03273061025 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Attachment 1, Figures B-1-12 Through Figure B-2-2Earthquake
ML03273061225 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Table of Contents Through Figure 2.1-19Safe Shutdown Earthquake
Earthquake
ML03273061325 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Appendix B, Seismic Hazards Report, Figures 2.1-20 Through Plate 1Safe Shutdown Earthquake
Probabilistic Risk Assessment
Earthquake
ML03273061425 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Table of Contents Through Figure 2.1-2Safe Shutdown
High winds
Ultimate heat sink
Safe Shutdown Earthquake
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Annual Radioactive Effluent Release Report
Earthquake
Fatality
Power Uprate
ML03273061525 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.1-3 Through 2.4-1
ML03273061625 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-2 Through 2.4-11
ML03273061725 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-12 Through 2.4-19Ultimate heat sink
ML03273061825 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.4-20 Through 2.5-5
ML03273061925 September 2003Site Safety Analysis Report for the Exelon Generation Company, LLC Early Site Permit, Figures 2.5-6 Through Chapter 3, Table 3.3-33Safe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Earthquake
Deep Dose Equivalent
Fuel cladding
ML03272159425 September 2003Submittal of Exelon Generation Company (EGC) Application for an Early Site Permit (ESP) for Property co-located with Existing Clinton Power Station (CPS) Facility in Illinois