RC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System | 14 January 2022 | (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System | Pandemic Coronavirus |
RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses | 28 December 2018 | (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses | |
RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses | 21 December 2018 | ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses | |
RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) | 12 December 2018 | (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) | Safe Shutdown Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Pressure Boundary Leakage |
RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 | 20 November 2018 | (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 | |
RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 | 9 November 2018 | (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 | Open Phase Condition |
RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... | 8 October 2018 | (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... | Stroke time Power-Operated Valves |
RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 | 8 October 2018 | (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 | Incorporated by reference Power-Operated Valves Pressure Boundary Leakage |
RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection | 4 October 2018 | NRC Request for Information Baseline Radiation Safety Inspection | High Radiation Area |
RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment | 28 September 2018 | (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake FLEX Fukushima Dai-Ichi Large early release frequency Earthquake |
RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 | 27 September 2018 | (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 | Battery sizing Fuel cladding |
RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation | 19 September 2018 | (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation | |
RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange | 14 September 2018 | (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange | Through-Wall Leak Through Wall Leak |
RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information | 11 September 2018 | (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information | |
RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation | 31 August 2018 | (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation | Anticipated operational occurrence Post Accident Monitoring Surveillance Frequency Control Program Fire Watch Grace period |
RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions | 29 August 2018 | License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions | Safe Shutdown Loop seal Mission time Fire Barrier Weld Overlay Internal Flooding Probabilistic Risk Assessment Operator Manual Action Multiple Spurious Operation Large early release frequency Fire Protection Program Very Early Warning Fire Detection |
RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation | 24 August 2018 | License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation | Anticipated operational occurrence Post Accident Monitoring Surveillance Frequency Control Program Fire Watch Grace period |
RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information | 22 August 2018 | (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information | |
RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. | 14 August 2018 | (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. | Through-Wall Leak Through Wall Leak |
RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error | 10 August 2018 | Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error | |
RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses | 30 July 2018 | (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses | |
RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 | 23 July 2018 | (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 | |
RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... | 12 July 2018 | (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... | Through-Wall Leak |
RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping | 11 July 2018 | (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping | Through-Wall Leak Through Wall Leak |
RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ | 3 July 2018 | Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques | |
RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping | 3 July 2018 | Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping | Time of Discovery Through-Wall Leak Through Wall Leak |
RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error | 29 June 2018 | Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error | |
RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal | 18 June 2018 | Change of the Commitment Date of DRIB/105A&B Door Submittal | Probabilistic Risk Assessment |
RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error | 30 May 2018 | (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report | 18 May 2018 | (Vcsns), Unit 1 - Annual Commitment Change Summary Report | Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi |
RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation | 2 May 2018 | Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation | |
RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors | 25 April 2018 | (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors | Safe Shutdown Time of Discovery Fire Barrier Past operability |
RC-18-0059, Annual Radioactive Effluent Release Report | 25 April 2018 | Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information | 19 April 2018 | License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information | |
RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information | 2 April 2018 | (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information | Weld Overlay Internal Flooding Probabilistic Risk Assessment Large early release frequency Dissimilar Metal Weld DM weld |
RC-18-0041, Report of Status of Decommissioning Funding | 28 March 2018 | Report of Status of Decommissioning Funding | |
RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error | 31 January 2018 | Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error | |
RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses | 25 January 2018 | Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses | Decommissioning Funding Plan |
RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 | 11 December 2017 | Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 | Open Phase Condition |
RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status | 11 December 2017 | (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status | Anchor Darling |
RC-17-0172, Notification of Personnel Changes | 30 November 2017 | Notification of Personnel Changes | |
RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door | 28 November 2017 | Submittal of Change of the Commitment Date of DRIB/105A&B Door | Probabilistic Risk Assessment |
RC-17-0135, Annual Commitment Change Summary Report | 3 November 2017 | Annual Commitment Change Summary Report | FLEX |
RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds | 30 October 2017 | Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds | Mission time Weld Overlay Probabilistic Risk Assessment Large early release frequency Dissimilar Metal Weld |
RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report | 23 October 2017 | Transmittal of 10 CFR 50.59 Biennial Report | |
RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change | 6 October 2017 | (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change | |
RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 | 27 September 2017 | Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 | |
RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 | 6 September 2017 | Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 | Significance Determination Process Fire Protection Program |
RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days | 1 September 2017 | Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days | Offsite Dose Calculation Manual |
RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description | 30 August 2017 | (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Anticipated operational occurrence Commercial Grade Dedication Safe Shutdown Earthquake Coatings Nondestructive Examination Temporary Modification Condition Adverse to Quality Process Control Program Fatigue Rule Fire Protection Program Grace period |