Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System14 January 2022(Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting SystemPandemic
Coronavirus
RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses28 December 2018(Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses
RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses21 December 2018ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses
RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)12 December 2018(Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)Safe Shutdown
Shutdown Margin
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Pressure Boundary Leakage
RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 2520 November 2018(Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25
RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-01699 November 2018(Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169Open Phase Condition
RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...8 October 2018(Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...Stroke time
Power-Operated Valves
RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.28 October 2018(Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2Incorporated by reference
Power-Operated Valves
Pressure Boundary Leakage
RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection4 October 2018NRC Request for Information Baseline Radiation Safety InspectionHigh Radiation Area
RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment28 September 2018(Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk AssessmentSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
FLEX
Fukushima Dai-Ichi
Large early release frequency
Earthquake
RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.327 September 2018(Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3Battery sizing
Fuel cladding
RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation19 September 2018(Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation
RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange14 September 2018(Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System FlangeThrough-Wall Leak
Through Wall Leak
RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information11 September 2018(Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information
RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation31 August 2018(Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature InstrumentationAnticipated operational occurrence
Post Accident Monitoring
Surveillance Frequency Control Program
Fire Watch
Grace period
RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions29 August 2018License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program RevisionsSafe Shutdown
Loop seal
Mission time
Fire Barrier
Weld Overlay
Internal Flooding
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Large early release frequency
Fire Protection Program
Very Early Warning Fire Detection
RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation24 August 2018License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature InstrumentationAnticipated operational occurrence
Post Accident Monitoring
Surveillance Frequency Control Program
Fire Watch
Grace period
RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information22 August 2018(Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information
RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..14 August 2018(Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..Through-Wall Leak
Through Wall Leak
RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error10 August 2018Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error
RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses30 July 2018(Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses
RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-012623 July 2018(Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126
RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...12 July 2018(Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...Through-Wall Leak
RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping11 July 2018(Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 PipingThrough-Wall Leak
Through Wall Leak
RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ3 July 2018Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques
RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping3 July 2018Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 PipingTime of Discovery
Through-Wall Leak
Through Wall Leak
RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error29 June 2018Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error
RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal18 June 2018Change of the Commitment Date of DRIB/105A&B Door SubmittalProbabilistic Risk Assessment
RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error30 May 2018(VCSNS) - Request to Revise Technical Specifications to Correct Administrative ErrorOffsite Dose Calculation Manual
Process Control Program
Fire Protection Program
RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report18 May 2018(Vcsns), Unit 1 - Annual Commitment Change Summary ReportProbabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation2 May 2018Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation
RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors25 April 2018(Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical ErrorsSafe Shutdown
Time of Discovery
Fire Barrier
Past operability
RC-18-0059, Annual Radioactive Effluent Release Report25 April 2018Annual Radioactive Effluent Release ReportOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information19 April 2018License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information
RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2 April 2018(Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional InformationWeld Overlay
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Dissimilar Metal Weld
DM weld
RC-18-0041, Report of Status of Decommissioning Funding28 March 2018Report of Status of Decommissioning Funding
RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error31 January 2018Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error
RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses25 January 2018Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined LicensesDecommissioning Funding Plan
RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-001911 December 2017Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019Open Phase Condition
RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status11 December 2017(VCSNS) - Anchor Darling Double Disc Gate Valve Information and StatusAnchor Darling
RC-17-0172, Notification of Personnel Changes30 November 2017Notification of Personnel Changes
RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door28 November 2017Submittal of Change of the Commitment Date of DRIB/105A&B DoorProbabilistic Risk Assessment
RC-17-0135, Annual Commitment Change Summary Report3 November 2017Annual Commitment Change Summary ReportFLEX
RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds30 October 2017Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping WeldsMission time
Weld Overlay
Probabilistic Risk Assessment
Large early release frequency
Dissimilar Metal Weld
RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report23 October 2017Transmittal of 10 CFR 50.59 Biennial Report
RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change6 October 2017(Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change
RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 127 September 2017Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1
RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170026 September 2017Reply to a Notice of Violation, Per Inspection Report 05000395/2017002Significance Determination Process
Fire Protection Program
RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days1 September 2017Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty DaysOffsite Dose Calculation Manual
RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description30 August 2017(Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program DescriptionFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Anticipated operational occurrence
Commercial Grade Dedication
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
Temporary Modification
Condition Adverse to Quality
Process Control Program
Fatigue Rule
Fire Protection Program
Grace period