Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23144A019 | 25 May 2023 | Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) | |
ML18180A243 | 26 June 2018 | Emergency Preparedness Inspection and Request for Information | |
IR 05000269/2016406 | 22 July 2016 | Cover Letter for NRC Material Control and Accounting Inspection Report 05000269/2016406, 05000270/2016406 and 05000287/2016406 | |
IR 05000269/2013405 | 30 May 2013 | IR 05000260-13-405 and 05000270-13-405 on 05/02/2013 for Oconee, Units 1, 2 and 3, Physical Security. Cover Letter | Affidavit |
IR 05000269/2011402 | 22 September 2011 | IR 05000269-11-402, 05000270-11-402, 05000287-11-402; on 8/25/2011; Oconee Nuclear Station Security Baseline Inspection | Affidavit |
IR 05000269/2008401 | 22 February 2008 | IR 05000269-08-401, IR 05000270-08-401, and IR 05000287-08-401, on 01/31/2008, for Oconee | Affidavit |
ML070650190 | 1 March 2007 | Response to Appeal of Final Significance Determination for a White Finding and Denial of Notice of Violation (Report Nos. 05000269-07-007, 05000270-07-007, and 05000287-07-007) | |
IR 05000269/2006005 | 30 January 2007 | IR 05000269-06-005, 05000270-06-005, 05000287-06-005, on 10/01/2006 - 12/31/2006, Oconee, Units 1, 2, and 3 | Safe Shutdown Boric Acid High Radiation Area Non-Destructive Examination Mission time Weld Overlay Internal Flooding Coatings Temporary Modification Significance Determination Process Large early release frequency Operability Determination Liquid penetrant Power change Coast down |
IR 05000028/2006401 | 18 January 2007 | NRC Inspection Report 05000269-06-401, 05000270-06-401 and 0500028-06-401. Cover Letter Only | Affidavit |
IR 05000269/2006008 | 20 November 2006 | IR 05000269-06-008, 05000270-06-008, and 05000287-06-008, Safeguards Information Removed | Affidavit |
ML063200171 | 15 November 2006 | Reply to Notice of Violation EA-06-080 | |
IR 05000269/2006007 | 7 July 2006 | NRC Inspection Report 05000269/2006007, 05000270/2006007, and 05000287/20060007 - SGI Removed | Fitness for Duty |
ML062340115 | 29 June 2006 | NRC Inspection Report 2006014 | Safe Shutdown Probabilistic Risk Assessment Condition Adverse to Quality Significance Determination Process |
ML061800391 | 29 June 2006 | NRC Inspection Report 05000260-06-014, 05000270-06-014 & 05000287-06-014 | Safe Shutdown Probabilistic Risk Assessment Condition Adverse to Quality Significance Determination Process |
IR 05000269/2006009 | 21 February 2006 | NRC Inspection Report 05000269/2006009, 05000270/2006009, & 05000287/20060009 | Tornado Missile Significance Determination Process |
ML053540247 | 20 December 2005 | Notification of Oconee Nuclear Station Component Design Bases Inspection - NRC Inspection Report 05000269/2006006, 05000270/2006006 and 05000287/2006006 | Probabilistic Risk Assessment |
IR 05000269/2002007 | 31 May 2002 | IR 05000269/02-007, 270, 287/02-07, 4/29-5/3/2002, Duke Energy Corporation, Oconee Nuclear Station, Units 1, 2 & 3: Followup Supplemental Inspection for Degraded Mitigating Systems Cornerstone | Mission time Probabilistic Risk Assessment Significance Determination Process |
IR 05000269/2001005 | 29 April 2002 | IR 05000269/2001-005, 05000270/2001-005, 05000287/2001-005, Oconee Nuclear Station, Inspection on 12/30/2001 - 03/30/2002 Related to post-maintenance Testing & Other Activities. Two Noncited Violations Noted | Safe Shutdown Boric Acid Non-Destructive Examination Mission time Probabilistic Risk Assessment Temporary Modification VT-2 Significance Determination Process Stress corrosion cracking Pressure Boundary Leakage Scaffolding |
IR 05000269/2002008 | 22 April 2002 | IR 05000269/2002-008, IR 05000270/2002-008 & IR 05000287/2002-08, Oconee, Units 1, 2 & 3 on March 19-22, 2002. Four Day Special Inspection to Determine Whether Ssf Would Perform Design Basis Function with Temporary Compensatory Measures Imp | Safe Shutdown |
IR 05000269/2002006 | 19 April 2002 | IR 05000269/2002-006, IR 05000270/2002-006 and IR 05000287/2002-006, Oconee Nuclear Station, Inspection on 03/22/02 Related Identification and Resolution of Problems in Compliance with Commission'S Rules and Regulations. No Violations Noted | Safe Shutdown Packing leak Stroke time Time Critical Operator Action Operability Assessment |
ML021020555 | 12 April 2002 | Safety System Design & Performance Capability Inspection NRC Inspection Report Nos. 50-269/2002-09, 50-270/2002-09 & 50-287/2002-09 | Temporary Modification |
IR 05000269/2002003 | 20 March 2002 | IR 05000269/2002-003, IR 05000270/2002-003 & IR 05000287/2002-003, Oconee, Units 1,2 & 3, Inspection on 02/08/2002 Related to Safety & Compliance. Two Apparent Violations Noted | Hot Short Safe Shutdown Fire Barrier Probabilistic Risk Assessment Operator Manual Action Emergency Lighting Significance Determination Process Job Performance Measure Fire Protection Program Manual Operator Action |