TMI-10-069, Supplement to Cycle 17 Refueling (T1R18) Inservice Inspection (ISI) Summary Report

From kanterella
Jump to navigation Jump to search
Supplement to Cycle 17 Refueling (T1R18) Inservice Inspection (ISI) Summary Report
ML101900245
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 07/07/2010
From: Libra R
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TMI-10-069
Download: ML101900245 (2)


Text

J7L "' Exelon.

~Nuclear Telephone 717-948-8000 Three Mile Island Unit 1 Route 441 South, P.O. Box 480 Middletown, PA 17057 July 7, 2010 TMI-10-069 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Three Mile Island, Unit 1 (TMI Unit 1)

Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Supplement to Cycle 17 Refueling (T1 R1 8) Inservice Inspection (ISI)

Summary Report

Reference:

Letter from R. Libra (Exelon Generation Company, LLC) to U.S. NRC, "Cycle 17 Refueling (T1 R1 8) Inservice Inspection (ISI) Summary Report",

dated April 21, 2010 On April 21, 2010, Three Mile Island Station (TMI) Unit 1 submitted the Owner's Data Reports for Inservice Inspections for Inservice Inspections" of the ISI and replacement steam generator eddy current examinations conducted between November 16, 2007 and January 24, 2010 (Reference 1). Enclosure 3 of this letter provided the Topical Report Number 203, "3 5 th Year Reactor Building Tendon Surveillance (Period 9)." The first page of Enclosure 3 is the signature page. Due to an administrative error during out processing of the letter, the signature page was inadvertently left out of the submittal. A replacement signature page is provided as Attachment 1 to this supplemental letter.

No new regulatory commitments are established by this submittal. If any additional information is needed, please contact David Atherholt at (717) 948-8364.

Respectfully, Richard W. Libra Plant Manager - Signature page 1 of Topical Report Number 203, "3 5 th Year Reactor Building Tendon Surveillance (Period 9)"

cc: S. J. Collins, USNRC Administrator, Region I P. Bamford, USNRC Project Manager, TMI Unit 1 D. M. Kern, USNRC Senior NRC Resident Inspector, TMI Unit 1

Topical Rbpoft No. 203 Revision 0W Pagke I of 448' 35th*7.ear lReactor Builidng Tendon Sur-v.eillance- (Period 9)

(Rev,(0)

-bward. V.. [Fi! PE. (CA Cert. C22265),

D.*fi2A.-

.Author DAt Co-;Author" Rjviewer .Date Design :Verfication Required .E]i.S *No

Section Manag/ Date.