Issue date | Title | Topic | |
---|---|---|---|
ML20217P097 | 20 October 1999 | Forwards Combustion Engineering Third Sample Event Rept in Conjunction with Hdrogeologic Investigation & Ground-Water, Soil & Stream Characterization, as Requested | |
RA99-138, Forwards Eighth Status Rept on Criticality Safety Program Update (Cspu),Per Cspu Plan & Subsequent Revs. Rept Covers semi-annual Period from 990401-990930 | 8 October 1999 | Forwards Eighth Status Rept on Criticality Safety Program Update (Cspu),Per Cspu Plan & Subsequent Revs. Rept Covers semi-annual Period from 990401-990930 | |
ML20212A895 | 10 September 1999 | Forwards Proprietary Updated Physical Security Plan for Protection of Special Nuclear Matl of Low Strategic Significance for Abb Combusting Engineering Nuclear Power, Inc,Hematite Facility,Per 10CFR73.67.Plan Withheld | |
RA99-133, Forwards Third Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization. Ltr from Leggette,Brashears & Graham,Inc, Authorizing Reproduction of Repts,Encl | 25 August 1999 | Forwards Third Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization. Ltr from Leggette,Brashears & Graham,Inc, Authorizing Reproduction of Repts,Encl | |
RA99-082, Provides Update on Status of Abb Cenp Former Evaporation Ponds Decommissioning & Planned Actions Regarding Same | 13 August 1999 | Provides Update on Status of Abb Cenp Former Evaporation Ponds Decommissioning & Planned Actions Regarding Same | |
RA99-129, Forwards License Application Pages Reflecting Recent Changes Made to Corporate Name.Ltr Replaces Entire 990729 Submittal | 13 August 1999 | Forwards License Application Pages Reflecting Recent Changes Made to Corporate Name.Ltr Replaces Entire 990729 Submittal | |
ML20210F689 | 29 July 1999 | Forwards Amended Application Pages Which Reflect Change in New Organization.Effective Date of Transfer from Combustion Engineering,Inc to Abb Combustion Engineering Nuclear Power, Inc Was 990629 | |
RA99-120, Forwards License Application Pages Affected by Corporate Name Change,Consistent with Amend 27 to License SNM-33 | 29 July 1999 | Forwards License Application Pages Affected by Corporate Name Change,Consistent with Amend 27 to License SNM-33 | |
ML20195D387 | 3 June 1999 | Forwards Application for Amend to License SNM-1067 to Transfer All Assets & Liabilities Related to NRC Licensed Activities of Combustion Engineering,Inc to Abb Combustion Engineering Nuclear Power,Inc | |
ML20195D374 | 3 June 1999 | Forwards Application for Amend to License SNM-33 to Transfer Combustion Engineering,Inc Assets & Liabilities Related to NRC Licensed Activities to Combustion Engineering Nuclear Power,Inc | |
RA99-099, Forwards Second Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After Second Quarter of Sampling Under CEs Hydrogeologic Work Plan | 26 May 1999 | Forwards Second Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After Second Quarter of Sampling Under CEs Hydrogeologic Work Plan | |
RA99-093, Requests Extension of Time Periods for Submission of Annual Inventory Repts,As Required by Licensee Fundamental Nuclear Matl Plan & NUREG/BR-0007.NRC Forms 742C & 742 Will Be Submitted by 990604 & NRC Form 327 Submitted by 990702 | 20 May 1999 | Requests Extension of Time Periods for Submission of Annual Inventory Repts,As Required by Licensee Fundamental Nuclear Matl Plan & NUREG/BR-0007.NRC Forms 742C & 742 Will Be Submitted by 990604 & NRC Form 327 Submitted by 990702 | |
RA99-088, Provides Third Response to GL 98-03, NMSS Licensee & Certificate Holders Year 2000 Readiness. Licensee Has Upgraded Systems Having Safety or Safeguards Functions & Is Y2K Ready & Y2K Compliant | 12 May 1999 | Provides Third Response to GL 98-03, NMSS Licensee & Certificate Holders Year 2000 Readiness. Licensee Has Upgraded Systems Having Safety or Safeguards Functions & Is Y2K Ready & Y2K Compliant | |
RA99-074, Responds to NRC Re Violations Noted in Insp Rept 70-0036/99-01.Corrective Actions:Special Evaluation Traveler Was Implemented to Assure That Sys to Prevent Overfilling of UF6 Cold Trap Would Perform Intended Safety Function | 22 April 1999 | Responds to NRC Re Violations Noted in Insp Rept 70-0036/99-01.Corrective Actions:Special Evaluation Traveler Was Implemented to Assure That Sys to Prevent Overfilling of UF6 Cold Trap Would Perform Intended Safety Function | |
RA99-075, Forwards App A,Figure 10 from Hydrogeologic Investigation & Groundwater,Soil & Stream Characterization Rept.Figure Was Inadvertently Ommitted from Original Submission | 21 April 1999 | Forwards App A,Figure 10 from Hydrogeologic Investigation & Groundwater,Soil & Stream Characterization Rept.Figure Was Inadvertently Ommitted from Original Submission | |
RA99-070, Forwards Criticality Safety Program Update Seventh Status Rept for Oct 1998 - Mar 1999. Next Rept Will Be Submitted by 991007 | 7 April 1999 | Forwards Criticality Safety Program Update Seventh Status Rept for Oct 1998 - Mar 1999. Next Rept Will Be Submitted by 991007 | |
RA99-068, Informs That Info Re Facility Has Been Reviewed & Verified, with Listed Discrepancies Noted,As Requested by NRC 990323 Fascimile | 7 April 1999 | Informs That Info Re Facility Has Been Reviewed & Verified, with Listed Discrepancies Noted,As Requested by NRC 990323 Fascimile | |
RA99-045, Forwards Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After First Quarter of Sampling Under Hydrogeologic Work Plan Dtd 980428. Reproduction Release Authorization,Also Encl | 9 March 1999 | Forwards Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After First Quarter of Sampling Under Hydrogeologic Work Plan Dtd 980428. Reproduction Release Authorization,Also Encl | |
RA99-005, Informs That CE Will Present follow-up Info in Response to Violations Noted in Insp Rept 70-0036/98-04,at Meeting with Region Iii.Licensee Has Conducted Root Cause Analysis of Causes That Lead to Violation & Reviewed DAs for 1998 | 15 January 1999 | Informs That CE Will Present follow-up Info in Response to Violations Noted in Insp Rept 70-0036/98-04,at Meeting with Region Iii.Licensee Has Conducted Root Cause Analysis of Causes That Lead to Violation & Reviewed DAs for 1998 | |
RA99-006, Forwards Revised Pages to Hematite Nuclear Fuel Mfg Facility Emergency Plan, Revising Sections 2.1.6 & 2.1.7 Re Postulated Fire & Explosion Incidents | 15 January 1999 | Forwards Revised Pages to Hematite Nuclear Fuel Mfg Facility Emergency Plan, Revising Sections 2.1.6 & 2.1.7 Re Postulated Fire & Explosion Incidents | |
RA99-002, Requests Temporary Change to UF6 Receipt Sampling Procedure to Allow Drawing & Analyzing of UO2F2 Samples for Cylinders by 990401,as Discussed on 990107 with Tn Pham.Doe/Nrc Form 741, Nuclear Matl Transaction Rept Encl | 8 January 1999 | Requests Temporary Change to UF6 Receipt Sampling Procedure to Allow Drawing & Analyzing of UO2F2 Samples for Cylinders by 990401,as Discussed on 990107 with Tn Pham.Doe/Nrc Form 741, Nuclear Matl Transaction Rept Encl | |
RA98-836, Provides Response 2 to GL 98-03, NMSS Licensees & Certificate Holders Y2K Readiness | 31 December 1998 | Provides Response 2 to GL 98-03, NMSS Licensees & Certificate Holders Y2K Readiness | |
ML20197G862 | 1 December 1998 | Informs of Licensee Determination That Uranium Is Present in Evaporation Pond at Depth of Sixteen Feet Below Ground Surface.Core Sampling Will Be Taken & Statistical Analysis Will Be Performed to Demonstrate Recommendation Criteria | |
RA98-826, Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-04.Corrective Actions:Radiation Worker Refresher Training Was Conducted for Plant Operations Personnel & NCS Training Was Provided for Plant Personnel | 20 November 1998 | Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-04.Corrective Actions:Radiation Worker Refresher Training Was Conducted for Plant Operations Personnel & NCS Training Was Provided for Plant Personnel | |
ML20155G734 | 3 November 1998 | Forwards Info Which Provides Missing Drawings & Replaces Other Drawings with Clarified Ones.Biennial Update to SNM-33 Demonstration Sections Inadvertently Omitted Figures at End of Chapter 14 | |
RA98-817, Provides 10CFR70.50 Written Rept as follow-up to C-E 980925 Initial Rept to NRC Operations Ctr Re Yellowish Residue Noticed on Asphalt Driveway Between Bldg 230 & Bldg 240 on 980924.No Mfg Equipment Failed or Malfunctioned | 23 October 1998 | Provides 10CFR70.50 Written Rept as follow-up to C-E 980925 Initial Rept to NRC Operations Ctr Re Yellowish Residue Noticed on Asphalt Driveway Between Bldg 230 & Bldg 240 on 980924.No Mfg Equipment Failed or Malfunctioned | |
RA98-808, Provides Addl Info Requested by NRC Re C-E Response to Violations Noted in Insp Rept 70-0036/98-03,dtd 980730 | 5 October 1998 | Provides Addl Info Requested by NRC Re C-E Response to Violations Noted in Insp Rept 70-0036/98-03,dtd 980730 | |
ML20154A544 | 28 September 1998 | Forwards Revised Safety Demonstration Sections to License Application.Editorial Changes & Corrections Have Also Been Made & Sections Have Been Repaginated | |
ML20154B129 | 25 September 1998 | Forwards Criticality Safety Program Update Sixth Status Rept, for Period Mar-Sept 1998.Progress on Criticality Safety Program Update for Period Has Fallen Behind Schedule Due Primarily to Diversion of Resources | |
ML20153G675 | 21 September 1998 | Provides Response to Request for Info Re Year 2000 Readiness for Licensees or Certificate Holders for UF6 Production Plants,U Enrichment Plants & U Fuel Fabrication Plants | |
RA98-793, Confirms 980827 Telcon in Which NRC Agreed W/Licensee That Biennial Update of Demonstration Section of SNM-33 Will Be Submitted by 980928.Submittal Will Fulfill Requirements of License Condition 1.6(d) | 28 August 1998 | Confirms 980827 Telcon in Which NRC Agreed W/Licensee That Biennial Update of Demonstration Section of SNM-33 Will Be Submitted by 980928.Submittal Will Fulfill Requirements of License Condition 1.6(d) | |
ML20237E900 | 27 August 1998 | Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-03.Corrective Actions:Weekly & Monthly Preventative Maint Checks Required by Procedure O.S.604.12 Incorporated Into Maint Work Order Sys | |
ML20236W728 | 31 July 1998 | Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-202.Corrective Actions:Updated Item Control Data Base by Deleting Items | |
RA98-774, Forwards Revised Chapter 4, Nuclear Criticality Safety, as Suppl Info Requested During Telcon W/H Felsher of Nrc. Requested Changes Have Been Made to 980611 Version & Entire Chapter 4 Is Resubmitted W/Current Date | 10 July 1998 | Forwards Revised Chapter 4, Nuclear Criticality Safety, as Suppl Info Requested During Telcon W/H Felsher of Nrc. Requested Changes Have Been Made to 980611 Version & Entire Chapter 4 Is Resubmitted W/Current Date | |
RA98-755, Forwards Revised Chapter 4, Criticality Safety, as Addl Info Requested During Telcon W/H Felsher of Nrc.Addl Changes That Were Beyond Licensee Scope of First Submission Will Be Addressed in Future Submittal | 11 June 1998 | Forwards Revised Chapter 4, Criticality Safety, as Addl Info Requested During Telcon W/H Felsher of Nrc.Addl Changes That Were Beyond Licensee Scope of First Submission Will Be Addressed in Future Submittal | |
ML20248K334 | 5 June 1998 | Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-01.Corrective Actions:Affected Clevis Pins Were Verified to Meet Lifting Requirements for Full UX-30 Overpacks | |
ML20217Q093 | 28 April 1998 | Forwards Rev 1 to Hydrogeologic Investigation & Ground- Water/Surface Water Monitoring Work Plan for Combustion Engineering,Mo,Site, Which Was Presented at 970925 Meeting in Jefferson City,Mo | |
RA98-708, Forwards Criticality Safety Program Update Fifth Status Rept 971001-980331 & Updated Gantt Chart,Per Agreement Contained in NRC | 31 March 1998 | Forwards Criticality Safety Program Update Fifth Status Rept 971001-980331 & Updated Gantt Chart,Per Agreement Contained in NRC | |
ML20212H255 | 27 March 1998 | Submits Response to Violations Noted in Unresolved Item Insp Rept 70-0036/97-204.Corrective Actions:Emergency Alarm Sys, Smoke Detectors,Heat Detectors & Associated Relays Serviced & Tested at Least Annually by Contractor | |
ML20217E358 | 20 March 1998 | Forwards Response to 980219 RAI on Hydrogeologic Investigation & Groundwater Surface Water Monitoring Work Plan Submitted on 971021.Revised Work Plan Will Contain NRC & Missouri Dept of Natural Resources Comments | |
ML20248L268 | 13 March 1998 | Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-201.Corrective Actions:Suspended Fissile Aqueous Solution Transfers from Safe to Unsafe Geometry Vessels in Wet Recovery Sys & Will Revise Sampling Procedures | |
ML20216H841 | 13 March 1998 | Responds to NRC Re Violations Noted in Insp Rept 70-0036/98-201.Corrective Actions:Fissile Aqueous Solution Transfers from Safe to Unsafe Geometry Vessels in Wet Recovery Sys Have Been Suspended | |
ML20202G286 | 12 February 1998 | Provides Updated Listing of Individuals Authorized to Make License Commitments & Preferred Distribution of Correspondence from NRC | |
ML20202B088 | 6 February 1998 | Forwards Response to 971125 Rai,Isa for Hydrofluoric Acid Absorber Sys,Slides Presented at 980115 Meeting W/Nrc & Engineering Drawings of Sys.Authorization to Release Hf for Unrestricted Use Requested by 980216 | |
ML20199J355 | 30 January 1998 | Forwards Response to 971103 RAI Re Licensee Application Requesting Rev to Chapter 4 of License SNM-33.Revised Chapter 4, Nuclear Criticality Safety, Pages,Encl | |
ML20199H928 | 30 January 1998 | Forwards Detailed Supplemental Info Re Criticality Safety of Hf Absorber Sys,Per 980120 Discussion | |
ML20203L491 | 31 December 1997 | Submits Effluent Monitoring Data for Facilities Operated Under License SNM-33.Effluent Release Data Covers Period Jul-Dec 1997 | |
ML20198B375 | 19 December 1997 | Confirms Agreement to Make Presentation to NRC on 980113 Re Chemical Safety Questions on Hf Absorber Sys.Submission of Any Written Matl in Response to RAI Should Be Delayed Until After 980113 Meeting | |
ML20198C509 | 19 December 1997 | Forwards Responses to Questions Posed in Re Amend Request to Update Decommissioning Plan for Evaporation Ponds | |
ML20203H212 | 8 December 1997 | Forwards Responses to Questions Posed in .Revised Dose Assessment for Proposed Release of Hf,Attached |