Forwards Criticality Safety Program Update Sixth Status Rept, for Period Mar-Sept 1998.Progress on Criticality Safety Program Update for Period Has Fallen Behind Schedule Due Primarily to Diversion of Resources
ML20154B129
Person / Time
Site: 07000036
Issue date: 09/25/1998
From: Sharkey R
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, ASEA BROWN BOVERI, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20154B133 List:
References
NUDOCS 9810050110
Download: ML20154B129 (1)


Text

,

" 4 A ED D

7% D D l

September 25,1998 Docket No. 70-36 License No. SNM-33 Director, Office of Nuclear Material Safety and Safeguards Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 i

Subject:

CRITICALITY SAFETY PROGRAM UPDATE SEMI-ANNUAL STATUS REPORT Gentlemen:

Enclosed is the sixth status report on our Criticality Safety Program Update (CSPU), per our CSPU Plan dated September 20,1996. This program was undertaken to formalize and strengthen our criticality safety program, taking into account recognized industry standards. The commitment to submit quarterly status reports was changed to reporting on a semi-annual basis, as agreed to by your letter dated November 6,1997. The enclosed report covers the period from to March 31,1998 to September 30,1998.

Progress on the CSPU for this period has fallen behind schedule due primarily to diversion of resources. To address this, CE has contracted an additional criticality safety specialist and plans to be back on schedule by the next reporting period.

The scope of the recycle / recovery effort involves the completion of design basis documentation, analyses, and evaluations which are used as the primary input for the associated Integrated Safety Assessment (ISA). At this time, CE is approximately fifty percent complete with this collection ofinput data. Following completion of the input data, the Integrated Safety Assessment (ISA) can begin.

Should you have any questions concerning this report, please contact me or Robert Freeman, the CSPU project manager, at (314) 937-4691.

Sincerely, COMBUSTION ENGINEERING,1 C.

j Robert W. Sharkey Director, Regulatory Affairs RA98/811

(\\0 cc: Dr. Sean Soong Mr. Patrick lliland, Region ill ABB CENO Fuel Operations