ML22340A19130 November 20221 to Updated Final Safety Analysis Report, Chapter 8, Figures
ML22340A16630 November 20221 to Updated Final Safety Analysis Report, Chapter 14.2, Tables 14.2.5-1 to 14.2.8-1 (Unit 2)
ML22340A20330 November 20221 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency SystemsSafe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Time to boil
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Design basis earthquake
Earthquake
Control of Heavy Loads
Fire Protection Program
Tritium
Power change
ML22340A20930 November 20221 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemLoop seal
Zebra Mussel
Earthquake
Turbine Missile
ML22340A20030 November 20221 to Updated Final Safety Analysis Report, Chapter 3, Figures (Unit 2)
ML22340A19330 November 20221 to Updated Final Safety Analysis Report, Chapter 14.2, Standby Safeguards Analysis (Unit 2)Boric Acid
Shutdown Margin
Earthquake
ML22340A21030 November 20221 to Updated Final Safety Analysis Report, Chapter 2, Site and EnvironmentSafe Shutdown
Boric Acid
High winds
Fire Barrier
Tornado Missile
Operating Basis Earthquake
Zebra Mussel
Design basis earthquake
Annual Radiological Environmental Operating Report
Veliger
Earthquake
Turbine Missile
Biofouling
ML22340A19730 November 20221 to Updated Final Safety Analysis Report, Chapter 7, TablesBoric Acid
Ultimate heat sink
Fuel cladding
ML22340A20730 November 20221 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 2)Shutdown Margin
Operating Basis Earthquake
Design basis earthquake
ML22340A18330 November 20221 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant SystemSafe Shutdown
Boric Acid
Loop seal
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Design basis earthquake
Earthquake
Fuel cladding
Liquid penetrant
Power change
ML22340A18630 November 20221 to Updated Final Safety Analysis Report, Chapter 6, TablesBoric Acid
Design basis earthquake
ML22340A19030 November 20221 to Updated Final Safety Analysis Report, Chapter 13, (Historical) Initial Tests and OperationsBoric Acid
Hydrostatic
ML22340A18430 November 20221 to Updated Final Safety Analysis Report, Chapter 14.3, Figure 14.3.7-1 (Unit 2)
ML22340A17530 November 20221 to Updated Final Safety Analysis Report, Chapter 14.1, Tables 14.1.0-1 to 14.1.12-1 (Unit 2)Shutdown Margin
ML22340A15530 November 20221 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety FeaturesBoric Acid
Shutdown Margin
Stroke time
Weld Overlay
Hydrostatic
Coatings
Foreign Material Exclusion
Earthquake
Power Operated Valves
Fuel cladding
Liquid penetrant
ML22340A18230 November 20221 to Updated Final Safety Analysis Report, Chapter 14.4, Table 14.4.2-1A, Equipment Required to Shutdown Reactor (Unit 1)
ML22340A18930 November 20221 to Updated Final Safety Analysis Report, Chapter 9, Figures
ML22340A20630 November 20221 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (Unit 2)Fuel cladding
ML22340A16930 November 20221 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-1 to 14.3.4-158 (Unit 2)
ML22340A17330 November 20221 to Updated Final Safety Analysis Report, Chapter 14.A-G, Radiation Sources (Appendix 14A) (Unit 1)Safe Shutdown
Design basis earthquake
Earthquake
Fuel cladding
ML22340A16730 November 20221 to Updated Final Safety Analysis Report, Chapter 14.1, Core and Coolant Boundary Protection Analysis (Unit 2)Boric Acid
Shutdown Margin
Fuel cladding
Power change
ML22340A16130 November 20221 to Updated Final Safety Analysis Report, Chapter 14.4, Table 14.4.2-1A, Equipment Required to Shutdown Reactor (Unit 2)
ML22340A17430 November 20221 to Updated Final Safety Analysis Report, Chapter 8, Electrical SystemsSafe Shutdown
Operator Manual Action
Emergency Lighting
Open Phase Condition
Battery sizing
ML22340A16430 November 20221 to Updated Final Safety Analysis Report, Chapter 14.3.4, Containment Integrity Analysis (Loss of Coolant Accident) (Unit 2)Boric Acid
Shutdown Margin
Earthquake
ML22340A17230 November 20221 to Updated Final Safety Analysis Report, Chapter 14.2, Figures 14.2.5-1 to 14.2.8-8 (Unit 2)
ML22340A12830 November 20221 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.4-76 to 14.3.9-25 (Unit 1)
ML22340A17730 November 20221 to Updated Final Safety Analysis Report, Chapter 14.1, Tables 14.1-1 to 14.1.13-1 (Unit 1)Turbine Missile
AEP-NRC-2022-62, 1 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident) (Unit 1)30 November 20221 to Updated Final Safety Analysis Report, Chapter 14.3, Reactor Coolant System Pipe Rupture (Loss of Coolant Accident) (Unit 1)Boric Acid
Shutdown Margin
Loop seal
Mission time
Fire Barrier
Hydrostatic
Coatings
Earthquake
Fuel cladding
ML22340A19230 November 20221 to Updated Final Safety Analysis Report, Chapter 5, Containment SystemHydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
Design basis earthquake
Earthquake
ML22340A18030 November 20221 to Updated Final Safety Analysis Report, Chapter 3, Tables (Unit 1)Safe Shutdown Earthquake
Design basis earthquake
ML22340A19630 November 20221 to Updated Final Safety Analysis Report, Chapter 14.3, Figures 14.3.1-1A to 14.3.4-75 (Unit 1)
ML22340A18830 November 20221 to Updated Final Safety Analysis Report, Chapter 12, Conduct of OperationsNon-Destructive Examination
Control of Heavy Loads
ML22340A16330 November 20221 to Updated Final Safety Analysis Report, Chapter 11, Waste Disposal and Radiation Protection SystemBoric Acid
High Radiation Area
Locked High Radiation Area
Process Control Program
Fuel cladding
ML22340A15630 November 20221 to Updated Final Safety Analysis Report, Chapter 14.2, Tables 14.2.1-2 to 14.2.7-1 (Unit 1)
ML22340A19530 November 20221 to Updated Final Safety Analysis Report, Chapter 10, Tables
ML22340A17130 November 20221 to Updated Final Safety Analysis Report, Chapter 2, TablesSafe Shutdown
Design basis earthquake
Earthquake
ML22340A21430 November 20221 to Updated Final Safety Analysis Report, Chapter 14.A, Radiation Sources (Appendix 14A) (Unit 2)
ML22340A21230 November 20221 to Updated Final Safety Analysis Report, Chapter 14.3.5 to 14.5.9, Environmental Consequences of a Loss-Of-Coolant Accident (Unit 2)Safe Shutdown
ML22340A16230 November 20221 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.1-1 to 14.1.13-6 (Unit 1)
ML22340A21530 November 20221 to Updated Final Safety Analysis Report, Chapter 1, Figures (Redacted)
ML22340A18130 November 20221 to Updated Final Safety Analysis Report, Chapter 11, TablesBoric Acid
ML22340A16830 November 20221 to Updated Final Safety Analysis Report, Chapter 14, Table 14.0-1 (Unit 2)
ML22340A20530 November 20221 to Updated Final Safety Analysis Report, Chapter 1, TablesHydrostatic
ML22340A20430 November 20221 to Updated Final Safety Analysis Report, Chapter 15, Supplement for Renewed Operating LicensesBoric Acid
Non-Destructive Examination
Fire Barrier
Coatings
Nondestructive Examination
Aging Management
License Renewal
Exemption Request
Earthquake
Control of Heavy Loads
Biofouling
Fire Protection Program
ML22340A20130 November 20221 to Updated Final Safety Analysis Report, Chapter 3, Reactor (Unit 1)Boric Acid
Shutdown Margin
Safe Shutdown Earthquake
Earthquake
Fuel cladding
Flow Induced Vibration
ML22340A18530 November 20221 to Updated Final Safety Analysis Report, Chapter 14.3, Tables 14.3.4-1 to 14.3.4-47 (Unit 2)
ML22340A20830 November 20221 to Updated Final Safety Analysis Report, Chapter 14.4, Revision 19, Environmental Qualifications Analyses (Unit 1)
ML22340A18730 November 20221 to Updated Final Safety Analysis Report, Chapter 14.A-G, Figures 14.G-1 and 14.G-2 (Unit 1)
ML22340A19430 November 20221 to Updated Final Safety Analysis Report, Chapter 4, Figures
ML22340A19830 November 20221 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and ControlSafe Shutdown
Boric Acid
Shutdown Margin
Fire Barrier
Post Accident Monitoring
Emergency Lighting
Earthquake
Fuel cladding