Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18117A057 | 27 April 2018 | 2017 Radioactive Effluent Release Report | Time of Discovery Packing leak Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML17132A396 | 12 May 2017 | 2016 Radioactive Effluent Release Report | Time of Discovery Packing leak Grab sample Offsite Dose Calculation Manual Process Control Program |
ML14079A428 | 25 February 2014 | Enclosure 1 - Braidwood Generating Station Flood Hazard Reevaluation Report Revision 0 | High winds Ultimate heat sink Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Fukushima Dai-Ichi Earthquake |
RS-14-029, Braidwood Station Kankakee River Fish Monitoring Program, 1991-2013 - Tables Requested by the NRC to Describe the Number of Fish Caught by Sampling Gear and Species at Each Monitoring Location | 31 January 2014 | Braidwood Station Kankakee River Fish Monitoring Program, 1991-2013 - Tables Requested by the NRC to Describe the Number of Fish Caught by Sampling Gear and Species at Each Monitoring Location | |
ML14030A269 | 31 January 2014 | Braidwood Station Kankakee River Fish Monitoring Program, 1991-2013 - Tables Requested by the NRC to Describe the Number of Fish Caught by Sampling Gear and Species at Each Monitoring Location | |
ML14030A264 | 21 January 2014 | Braidwood, Units 1 and 2, Response to NRC Request for Additional Information, Dated December 20, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Braidwood Station Applicant'S Environmental Repor | |
ML13162A352 | 31 May 2013 | Applicant'S Environmental Report Operating License Renewal Stage Braidwood Station, Units 1 and 2. Cover Through Appendix B | Grab sample Biofouling |
ML13162A361 | 31 May 2013 | Applicant'S Environmental Report Operating License Renewal Stage Braidwood Station, Units 1 and 2. Appendix G Through End | |
ML13162A362 | 31 May 2013 | Applicant'S Environmental Report Operating License Renewal Stage Braidwood Station, Units 1 and 2. Appendix C | |
ML13162A363 | 31 May 2013 | Applicant'S Environmental Report Operating License Renewal Stage Braidwood Station, Units 1 and 2. Appendix D | |
ML13162A365 | 31 May 2013 | Applicant'S Environmental Report Operating License Renewal Stage, Braidwood Station, Units 1 and 2. Cover Through Appendix a | Safe Shutdown Boric Acid Ultimate heat sink Probabilistic Risk Assessment Zebra Mussel Incorporated by reference Aging Management Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Large early release frequency License Renewal Environmental Justice Power Uprate Measurement Uncertainty Recapture |
ML13162A364 | 31 May 2013 | Applicant'S Environmental Report Operating License Renewal Stage Braidwood Station, Units 1 and 2. Appendix E | |
ML13162A525 | 31 May 2013 | Applicant'S Environmental Report Operating License Renewal Stage Braidwood Station, Units 1 and 2. Appendix F | Safe Shutdown High winds Ultimate heat sink Mission time Fire Barrier Internal Flooding Probabilistic Risk Assessment FLEX Design basis earthquake Large early release frequency License Renewal Earthquake Weak link Power Uprate Measurement Uncertainty Recapture Seismic Walkdown Report |
RS-13-145, Environmental Report, Part 2 | 29 May 2013 | Environmental Report, Part 2 | Safe Shutdown High winds Ultimate heat sink Mission time Grab sample Fire Barrier Internal Flooding Probabilistic Risk Assessment FLEX Design basis earthquake Annual Radiological Environmental Operating Report Large early release frequency License Renewal Earthquake Biofouling Environmental Justice Weak link Power Uprate Measurement Uncertainty Recapture Seismic Walkdown Report |
ML13155A424 | 29 May 2013 | Environmental Report, Part 1 | Safe Shutdown Boric Acid Ultimate heat sink Probabilistic Risk Assessment Zebra Mussel Incorporated by reference Aging Management Annual Radioactive Effluent Release Report Large early release frequency Environmental Justice |
RS-13-145, Braidwood, Units 1 and 2 - Environmental Report, Part 1 | 29 May 2013 | Braidwood, Units 1 and 2 - Environmental Report, Part 1 | Safe Shutdown Boric Acid Ultimate heat sink Probabilistic Risk Assessment Zebra Mussel Incorporated by reference Aging Management Annual Radioactive Effluent Release Report Large early release frequency Environmental Justice |
ML14030A294 | 31 December 2012 | Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2012 | |
ML14030A285 | 31 December 2012 | Plan Completion Report for the VB 2/3 and Pond Area | |
RS-14-029, Plan Completion Report for the VB 2/3 and Pond Area | 31 December 2012 | Plan Completion Report for the VB 2/3 and Pond Area | |
RS-14-029, Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2012 | 31 December 2012 | Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2012 | |
ML14030A284 | 31 October 2012 | Plan Completion Report for the VB 1 Area | |
RS-14-029, Plan Completion Report for the VB 1 Area | 31 October 2012 | Plan Completion Report for the VB 1 Area | |
ML14030A295 | 19 September 2012 | Air Emissions and Solid Waste from Coal- and Gas-Fired Alternatives for Braidwood Units 1 and 2 - License Renewal Chapter 7 Energy Alternatives, Rev. 3 | |
RS-14-029, Employment and Land Requirements for Alternatives to Byron Units 1 and 2 and Braidwood Units 1 and 2 - Lr Chapter 7 Energy Alternatives | 18 September 2012 | Employment and Land Requirements for Alternatives to Byron Units 1 and 2 and Braidwood Units 1 and 2 - Lr Chapter 7 Energy Alternatives | License Renewal |
ML14030A293 | 31 December 2011 | Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2011 | Met Tower |
RS-14-029, Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2011 | 31 December 2011 | Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2011 | Met Tower |
RS-14-029, Plan Completion Report for the VB 4 Area | 31 October 2011 | Plan Completion Report for the VB 4 Area | |
ML14030A286 | 31 October 2011 | Plan Completion Report for the VB 4 Area | |
ML14030A292 | 22 April 2011 | Transmittal of Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2010 | |
RS-14-029, Transmittal of Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2010 | 22 April 2011 | Transmittal of Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2010 | |
RS-14-029, Final Report: Unionid Relocation Near the Braidwood Nuclear Station Kankakee River Discharge Location | 30 September 2010 | Final Report: Unionid Relocation Near the Braidwood Nuclear Station Kankakee River Discharge Location | |
ML14030A268 | 30 September 2010 | Final Report: Unionid Relocation Near the Braidwood Nuclear Station Kankakee River Discharge Location | |
RS-14-029, Plan Completion Report for the VB 7 Area | 28 February 2010 | Plan Completion Report for the VB 7 Area | Time of Discovery |
ML14030A288 | 28 February 2010 | Plan Completion Report for the VB 7 Area | Time of Discovery |
ML14030A291 | 31 December 2009 | Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2009 | Offsite Dose Calculation Manual Met Tower |
RS-14-029, Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2009 | 31 December 2009 | Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2009 | Offsite Dose Calculation Manual Met Tower |
ML14030A287 | 31 August 2009 | Plan Completion Report for the VB 6 Area | Time of Discovery |
RS-14-029, Plan Completion Report for the VB 6 Area | 31 August 2009 | Plan Completion Report for the VB 6 Area | Time of Discovery |
ML092390348 | 27 August 2009 | Environmental Non-Routine Event Report | |
ML14030A266 | 25 February 2009 | Response to NRC Request for Additional Information, Dated December 20, 2013, Related to the Byron and Braidwood Stations, Units 1 and 2 License Renewal Application, Braidwood Station Applicant'S Environmental Report | |
ML14030A276 | 31 January 2009 | Final Report: Characterization of Unionid Communities Near the Braidwood Nuclear Station Kankakee River Discharge Location | |
RS-14-029, Final Report: Characterization of Unionid Communities Near the Braidwood Nuclear Station Kankakee River Discharge Location | 31 January 2009 | Final Report: Characterization of Unionid Communities Near the Braidwood Nuclear Station Kankakee River Discharge Location | |
RS-14-029, Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2008 | 31 December 2008 | Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2008 | Offsite Dose Calculation Manual |
ML14030A290 | 31 December 2008 | Annual Report on the Meteorological Monitoring Program at the Braidwood Nuclear Power Station 2008 | Offsite Dose Calculation Manual |
ML14030A267 | 31 October 2008 | Investigations to Determine Presence of State-Listed Species of Fish and Freshwater Mussels in the Kankakee River Near the Braidwood Nuclear Station Warmwater Discharge Channel | |
RS-14-029, Investigations to Determine Presence of State-Listed Species of Fish and Freshwater Mussels in the Kankakee River Near the Braidwood Nuclear Station Warmwater Discharge Channel | 31 October 2008 | Investigations to Determine Presence of State-Listed Species of Fish and Freshwater Mussels in the Kankakee River Near the Braidwood Nuclear Station Warmwater Discharge Channel | |
RS-14-029, Status of Fish Communities and Sport Fishery in the Kankakee River and Tributary Streams: 2005 Basin Survey | 30 April 2008 | Status of Fish Communities and Sport Fishery in the Kankakee River and Tributary Streams: 2005 Basin Survey | |
ML14030A280 | 30 April 2008 | Status of Fish Communities and Sport Fishery in the Kankakee River and Tributary Streams: 2005 Basin Survey | |
ML062760004 | 30 September 2006 | to Hydrogeologic Investigation Report, Fleetwide Assessment, Braidwood Generating Station. | Boric Acid Annual Radiological Environmental Operating Report Accidental discharge Tritium |
ML062970149 | 16 May 2006 | 2005 Annual Radiological Environmental Operating Report, Braidwood Station, Units 1 and 2 | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |