Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000247/2016004 | 3 February 2017 | Integrated Inspection Report 05000247/2016004 and 05000286/2016004 | Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Non-Destructive Examination Mission time Fire Barrier Internal Flooding Operator Manual Action Temporary Modification Functionality Assessment Significance Determination Process Job Performance Measure Large early release frequency Operability Determination Maintenance Rule Program Through-Wall Leak Through Wall Leak Scaffolding |
ML17013A233 | 17 January 2017 | Integrated Inspection Report 05000247/2016003 and 05000286/2016003 and Notice of Violation (EA-16-193) | Safe Shutdown Boric Acid High Radiation Area Fire Barrier Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Condition Adverse to Quality Missed surveillance Significance Determination Process Through-Wall Leak Offsite Circuit Substantial potential for overexposure |
ML13354B806 | 18 December 2013 | NRC Inspection Report Nos. 05000247/2013011 and 05000286/2013011 and NRC Office of Investigations Report No. 1-2012-036 (EA-13-076)(w/encls 1& 2) | |
ML13126A256 | 6 May 2013 | EA-10-090;EA-10-248;EA-11-106 - Fitzpatrick - Confirmation of Completion of Actions Taken by Entergy Nuclear Operations,As Set Forth in NRC Confirmatory Order Dated January 26, 2012 | |
ML090620457 | 3 March 2009 | EA-08-265, Indian Point, Close Out of NRC Orders, Confirmatory Action Letter, and Enforcement Actions Taken Regarding New Emergency Notification System at Indian Point | |
ML083440170 | 8 December 2008 | EA-08-185, Indian Point Energy Center, NRC Investigation Report No. 1-2007-034 | |
ML080240005 | 24 January 2008 | EA-08-006, Indian Point Units 2 & 3, Notice of Violation and Proposed Imposition of Civil Penalty | |
ML071140022 | 23 April 2007 | EA-07-092; EA-05-190 - Indian Point Nuclear Generating Station, Units 2 and 3 - NOV and Proposed Imposition of Civil Penalty - $130,000 and Additional Requirement to Provide Information | |
ML052130518 | 1 August 2005 | EA-05-102, Indian Point Nuclear Generating Station Unit 2, Notice of Violation | Condition Adverse to Quality Significance Determination Process Preliminary White Finding |