NRC Inspection Report Nos. 05000247/2013011 and 05000286/2013011 and NRC Office of Investigations Report No. 1-2012-036 (EA-13-076)(w/encls 1& 2)
ML13354B806
Person / Time
Site: Indian Point  
Issue date: 12/18/2013
From: Michael Scott
Division Reactor Projects I
To: Ventosa J
Entergy Nuclear Operations
Burritt A
References
EA-13-076 1-2012-036, IR-13-011
Download: ML13354B806 (9)


See also: IR 05000247/2013011

Text

December 18, 2013

EA-13-076

Mr. John Ventosa

Vice President, Operations

Entergy Nuclear Operations, Inc.

Indian Point Energy Center

450 Broadway, GSB

P.O. Box 429

Buchanan, NY 10511-0249

SUBJECT:

INDIAN POINT ENERGY CENTER UNITS 2 & 3 - NRC INSPECTION REPORT

NOS. 05000247/2013011 & 05000286/2013011 AND NRC OFFICE OF

INVESTIGATIONS REPORT NO. 1-2012-036

Dear Mr. Ventosa:

This refers to an investigation initiated on March 30, 2012, by the NRC Office of Investigations

(OI) to determine if the Chemistry Manager at Entergy Nuclear Operations (ENOs) Indian Point

Energy Center Units 2 and 3 (IP), deliberately falsified data pertaining to IPs Emergency Diesel

Generator (EDG) fuel oil storage tanks. IP Technical Specifications (TS) require implementation

of a diesel fuel oil testing program to verify the acceptability of the fuel oil in the onsite fuel oil

storage tanks (FOSTs) and in the reserve fuel oil storage tank (RFOST), which is a common

tank for both IP operating units. Per the TS, the fuel oil is sampled every 92 days and analyzed

to determine if it: (1) is within limits for parameters such as viscosity and sulfur content; and, (2)

has a total particulate concentration of 10 mg/l. If the particulate concentration is out of

specification, the parameter must be restored to within limits within 7 days for an FOST and 30

days for the RFOST, or the licensee must immediately declare the associated EDGs inoperable

(for the RFOST, because all the IP EDGs would be affected, this would require a dual unit

shutdown).

In January and February 2012, the IP Engineering Department conducted a self-assessment in

preparation for an upcoming NRC Component Design Bases Inspection, which included a

review of EDG fuel oil delivery systems and storage tanks. The assessment team identified

that: (1) RFOST samples taken on June 17, 2011, and December 1, 2011 had not been entered

into the Chemistry Department database until July 14, 2011, and January 23, 2012,

respectively; (2) both samples had exceeded the TS particulate limits; and (3) no condition

reports had been written in response to the out of TS condition and, evidently, no re-sampling

performed.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BOULEVARD, SUITE 100

KING OF PRUSSIA, PENNSYLVANIA 19406-2713

J. Ventosa

2

On February 2, 2012, the assessment team leader sent an email to the Chemistry staff

specialist who had entered the sample results in the database (and copied the Chemistry

Manager on the email), and questioned how the TS condition had been met, since it did not

appear resampling had been performed and the EDGs had not been declared inoperable. The

Chemistry specialist responded that he had been unaware of the TS limit and, therefore, had

not recognized that it had been exceeded. Subsequently, on February 5, 2012, database

entries were made to indicate that RFOST resamples for June 17, 2011, and December 1,

2011, had actually been performed on June 29, 2011, and December 9, 2011, respectively (i.e.,

within the 30 day period allowed by TS), and that the re-samples were within the TS limits.

These entries were coded in the database as being made by the Chemistry Manager, and the

re-samples as being taken by one of the Chemistry technicians. In response to a condition

report written by the assessment team leader, the Chemistry Manager indicated that the re-

samples had been taken but had not been timely entered into the database. Subsequently, in

response to questions from IP staff about why no paperwork from the offsite laboratory that

usually analyzes such samples existed for the resamples, the Chemistry Manager wrote a

condition report in which he stated that the re-samples had been analyzed in-house.

The NRC recognizes that ENO next initiated an investigation into this issue, and that the

Chemistry Manager did not comply with requests to be interviewed by ENOs investigators and

abruptly retired. However, the Chemistry Manager subsequently submitted to an interview with

OI and, during that interview, admitted that the two RFOST re-samples had actually not been

obtained and that he had, instead, created false information to show an acceptable result based

on historical sample results. The Manager also admitted to OI that, during this same timeframe,

he had similarly provided false information for one of the onsite storage tanks (the 22 EDG

FOST) after learning that the TS particulate for a November 18, 2011, sample had been

exceeded, by indicating a re-sample had been taken that was within limits when, in fact, no re-

sampling was performed. The Manager further admitted that the information pertaining to the

supposed resamples that he had entered into the aforementioned condition reports had been

false. A Factual Summary of the OI report is enclosed (Enclosure 1).

Based on the NRC investigation, the NRC identified two apparent violations that are being

considered for escalated enforcement action in accordance with the NRC Enforcement Policy.

The current NRC Enforcement Policy is included on the NRCs Website at www.nrc.gov/about-

nrc/regulatory/enforcement/enforce-pol.html. The apparent violations involve: (1) operating IP

Units 2 and 3 in violation of site TS requirements after the Chemistry manager identified that the

fuel oil in the 22 FOST and the RFOST exceeded limits; and, (2) failing to initiate a condition

report or otherwise report the condition such that a Licensee Event Report could be written.

These apparent violations are described in detail in Enclosure 2, Apparent Violations Being

Considered for Escalated Enforcement.

Since the NRC has not made a final determination in this matter, a Notice of Violation is not

being issued at this time. In addition, please be advised that the number and characterization of

apparent violations described herein may change as a result of further NRC review. Before the

NRC makes its enforcement decision, the NRC would like to discuss the apparent violations and

ENOs corrective actions at a pre-decisional enforcement conference (PEC). In particular, the

NRC is interested in discussing actions taken by ENO to address the Chemistry managers

apparent deliberate misconduct. The NRC decision to hold a PEC does not mean that the NRC

J. Ventosa

3

has determined that violations have occurred or that enforcement action will be taken. Rather,

this conference is being requested to assist the NRC in making an enforcement decision. The

conference will also include an opportunity for you to provide your perspective on these matters

and any other information that you believe the NRC should take into consideration in making an

enforcement decision. In presenting your corrective actions, you should be aware that the

promptness and comprehensiveness of your actions will be considered in assessing any

potential civil penalty for the apparent violations.

In lieu of a PEC, you may also request alternative dispute resolution (ADR) with the NRC in an

attempt to resolve this issue. ADR is a general term encompassing various techniques for

resolving conflicts using a neutral third party. The technique that the NRC has decided to

employ is mediation; a voluntary, informal process in which a trained neutral mediator works

with parties to help them reach resolution. If the parties agree to use ADR, they select a

mutually agreeable neutral mediator who has no stake in the outcome and no power to make

decisions. Mediation gives parties an opportunity to discuss issues, clear up

misunderstandings, be creative, find areas of agreement, and reach a final resolution of the

issues. Additional information concerning the NRC ADR program can be obtained at

http://www.nrc.gov/about-nrc/regulatory/enforcement/adr.html. The Institute on Conflict

Resolution (ICR) at Cornell University has agreed to facilitate the NRC program as a neutral

third party. Please contact ICR at 877-733-9415 within 10 days of the date of this letter if you

are interested in pursuing resolution of this issue through ADR.

Either the PEC or the ADR mediation session will be closed to public observation because the

NRCs preliminary findings are based on an NRC OI report that has not been publicly disclosed.

However, the time and date of the PEC or ADR will be publicly announced. Please contact Art

Burritt, Chief, Projects Branch 2, Division of Reactor Projects, at 610-337-5069 within 10 days of

the date of this letter to notify the NRC whether you will be attending a PEC or electing to

engage in ADR, and to discuss when the meeting will occur. Either the PEC or ADR should be

held in our office in King of Prussia, PA, within 30 days of the date of this letter.

J. Ventosa

4

No written response regarding the apparent violations is required at this time. In accordance

with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will

be made available electronically for public inspection in the NRC Public Document Room and

from the NRC Agency-wide Documents Access and Management System (ADAMS), accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Michael L. Scott

Acting Division Director

Division of Reactor Projects

Enclosures:

1. Factual summary of OI Investigation Report

No. 1-2012-036

2. Apparent Violations Being Considered for

Escalated Enforcement Action

3. Brochure NUREG/BR-0317, The Nuclear Regulatory

Commissions Post-Investigation ADR Program:

Alternative Dispute Resolution Administered by

Cornell Universitys Institute on Conflict Resolution

Docket Nos.

50-247 and 50-286

License Nos. DPR-26 and DPR-64

cc w/encls:

Distribution via ListServ

J. Ventosa

4

No written response regarding the apparent violations is required at this time. In accordance

with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will

be made available electronically for public inspection in the NRC Public Document Room and

from the NRC Agency-wide Documents Access and Management System (ADAMS), accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Michael L. Scott

Acting Division Director

Division of Reactor Projects

Enclosures:

1. Factual summary of OI Investigation Report

No. 1-2012-036

2. Apparent Violations Being Considered for

Escalated Enforcement Action

3. Brochure NUREG/BR-0317, The Nuclear Regulatory

Commissions Post-Investigation ADR Program:

Alternative Dispute Resolution Administered by

Cornell Universitys Institute on Conflict Resolution

Docket Nos.

50-247 and 50-286

License Nos. DPR-26 and DPR-64

cc w/encls:

Distribution via ListServ

Distribution:

See next page

DOCUMENT NAME: S:\\Enf-allg\\Enforcement\\Proposed-Actions\\Choice Letters\\IP Chem Mgr LIC PEC LETTER EA-13-

076.doc.docx

ADAMS Accession No. ML13354B806

X

SUNSI Review/

X

Non-Sensitive

Sensitive

X

Publicly Available

Non-Publicly Available

OFFICE

RI/ DRP

RI/ DRS

OI

RI/ RC

RI/ORA

NAME

S Rutenkroger/ SPR*

R Lorson/ RKL*

J Teator/ JAT*

J Farrington/ JSF*

D Holody/ DJH*

DATE

7/30/13

8/01/13

8/12/13

8/05/13

8/02/13

OFFICE

NRR/ C Sanders

OE

OGC

DRP

NAME

C Sanders via email

R Carpenter via email

M Lemoncelli via email

M Scott/MLS

DATE

12/12/13

12/11/13

12/06/13

12/18/13

Letter to Mr. John Ventosa from Michael L. Scott, dated December 18, 2013

SUBJECT:

INDIAN POINT ENERGY CENTER UNITS 2 & 3 - NRC INSPECTION REPORT

NOS. 05000247/2013011 & 05000286/2013011 AND NRC OFFICE OF

INVESTIGATIONS REPORT NO. 1-2012-036

Distribution: (w/encls)

ADAMS (PARS)

R. Carpenter, OE

C. Sanders, NRR

M. Lemoncelli, OGC

M. Scott, DRP

R. Lorson, DRS

J. Trapp, DRS

N. Hilton, OE

A. Burritt, DRP

T. Setzer, DRP

J. Scott Stewart, SRI

D. Tifft, ORA

N. McNamara, ORA

N. Sheehan, OPA

D. Screnci, OPA

M. McLaughlin, ORA

E. Monteith, ORA

B. Bickett, ORA

C. Crisden, ORA

D. Bearde, ORA

R. Zimmerman, OE

Enclosure 1

Factual Summary of NRC Office of Investigations Case No. 1-2012-036

In January and February, 2012, the Indian Point (IP) Engineering Department conducted a self-

assessment in preparation for an upcoming NRC Component Design Bases Inspection. The

self-assessment included a review of IPs Emergency Diesel Generator (EDG) fuel oil delivery

systems and storage tanks. The assessment team reviewed EDG fuel oil sample data

maintained in an IP Chemistry Department database and identified that: 1) samples taken from

the reserve fuel oil storage tank (RFOST) on June 17, 2011, and December 1, 2011, had not

been entered into the database until July 14, 2011, and January 23, 2012 (respectively); 2) both

samples had exceeded the Technical Specifications (TS) particulate limits; and 3) no condition

reports (CRs) had been written in response to the out of TS condition and, evidently, no re-

sampling performed.

On February 2, 2012, the team leader sent an email to the Chemistry staff specialist who had

entered the sample results in the database (and copied the Chemistry Manager), and

questioned how the TS condition had been exited. The Chemistry specialist responded that he

had been unaware of the TS limit and, therefore, had not recognized that it had been exceeded.

Subsequently, on February 5, 2012, database entries were made to indicate that resamples for

the RFOST samples taken on June 17, 2011, and December 1, 2011, had actually been

performed on June 29, 2011, and December 9, 2011, respectively (i.e., within the 30 day period

allowed by TS), and that the re-samples were within the TS limits. These entries were coded in

the database as being made by the Chemistry Manager, and the re-samples as being taken by

one of the Chemistry technicians. In response to a condition report written by the assessment

team leader, the Chemistry Manager indicated that the re-samples had been taken but had not

been timely entered into the database. Subsequently, in response to questions from IP staff

about why no paperwork from the offsite laboratory that usually analyzes such samples existed

for the resamples, the Chemistry Manager wrote a condition report indicating that the re-

samples had been analyzed in-house.

The Chemistry Manager, who retired at the time the licensee requested to interview him as part

of its own investigation, admitted during an interview with the NRC Office of Investigations, that

re-samples had not been obtained and he had, instead, simply created values based on

historical sample results. The Manager testified that he believed the results of the original June

17, 2011, and December 1, 2011, samples were incorrect because IP was, at the time,

obtaining samples from the bottom of the RFOST and shipping them in a tin-coated can, both

practices that were specifically not recommended by newer American Society for Testing and

Materials (ASTM) guidance. The Manager said that he falsified the data because he needed

more time to prove his theory and incorporate new test methods, and he had not wanted the

plant to unnecessarily shut down. The Manager also admitted to OI that, during this same

timeframe, he had similarly provided false information for one of the onsite fuel oil storage tanks

(the 22 EDG FOST) after learning that the TS particulate for a November 18, 2011, sample had

been exceeded, by indicating a re-sample had been taken that was within limits when, in fact,

no re-sampling was performed. The Manager further admitted that the information pertaining to

the supposed resamples that he had entered into the aforementioned condition reports had

been false.

Enclosure 2

Apparent Violations Being Considered for Escalated Enforcement

1. Indian Point Nuclear Generating Unit 2 (IP2) Technical Specifications (TS) 5.5.11 and Indian

Point Nuclear Generating Unit 3 (IP3) TS 5.5.12, Diesel Fuel Oil Testing Program, in part,

require verification every 92 days that total particulate concentration of the fuel oil in the

onsite and reserve storage tanks is less than or equal to 10 mg/l.

IP2/3 TS 3.8, Electrical Power Systems, Section 3.8.3, Diesel Fuel Oil and Starting Air,

requires that whenever the total particulate concentration of fuel oil in the fuel oil storage

tanks (FOSTs) exceeds the limit, it must be restored within limits within 7 days (30 days for

the reserve fuel oil storage tank (RFOST)), otherwise, the associated diesel generators must

be immediately declared inoperable.

IP 2/3 TS 3.0.3 states that when a TS Limiting Condition of Operation is not met and the

associated Actions are not met, action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as

applicable, in: MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />, and MODE 5 within 37

hours.

Contrary to the above, on or about February 2, 2012, Entergy Nuclear Operations (ENO)

identified that test results for a November 18, 2011, fuel oil sample from the IP 22 FOST and

for a December 1, 2011, fuel oil sample from the IP RFOST, indicated total particulate

concentration for both tanks was in excess of the Technical Specification limits of 10 mg/l.

Although the total particulate concentration for these systems had not been demonstrated to

be within limits within 7 days and 30 days, respectively, ENO did not declare the associated

diesel generators inoperable and did not place the units in MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, MODE 4

within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />, and MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

2. 10 CFR 50.73(a)(2)(B) requires the holder of an operating license to, within 60 days after

discovery, submit a Licensee Event Report to the NRC for any operation or condition which

was prohibited by the plants Technical Specifications.

IP2 TS 5.5.11/IP3 TS 5.5.12, Diesel Fuel Oil Testing Program, in part, require verification

every 92 days that total particulate concentration of the fuel oil in the onsite and reserve

storage tanks is less than or equal to 10 mg/l.

IP2/3 TS 3.8, Electrical Power Systems, Section 3.8.3, Diesel Fuel Oil and Starting Air,

requires that whenever the total particulate concentration of fuel oil in the reserve fuel oil

storage tank (RFOST) exceeds the limit, it must be restored within limits within 30 days,

otherwise, the associated diesel generators must be immediately declared inoperable.

IP 2/3 TS 3.0.3 states that when a TS Limiting Condition of Operation is not met and the

associated Actions are not met, action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as

applicable, in: MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />, and MODE 5 within 37

hours.

2

Enclosure 2

TS 5.4, Procedures, Section 5.4.1, states, in part, that written procedures shall be

established, implemented, and maintained covering the applicable requirements and

recommendations of Appendix A of Regulatory Guide 1.33, Revision 2 (except as provided

in the quality assurance program described or referenced in the Updated FSAR for Unit 2).

RG 1.33, Rev.2, App A recommends chemical and radiochemical control procedures to

prescribe the nature and frequency of sampling and analyses. Implementing Procedure EN-

CY-101, Chemistry Activities, includes guidance related to chemistry sampling and

analysis. Section 5.5 states that out of specification conditions should be identified and

corrective actions initiated as quickly as possible. Implementing Procedure 0-CY-1210,

Organization and Responsibilities of the Chemistry Department, includes guidance related

to chemistry sampling and analysis. Step 4.1.4 requires a condition report to be initiated to

report any condition exceeding any procedural limits.

Contrary to the above, on or about February 2, 2012, ENO staff identified that, on two

occasions: 1) fuel oil sample test results had been received indicating total particulate

concentrations that exceeded TS limits of 10 mg/l; 2) the total particulate concentration for

these systems had not been returned to within limits within the TS-required timeframe; and

3) the associated diesel generators had not been declared inoperable or the units placed in

the appropriate operating modes. However, the ENO staff did not initiate condition reports

or otherwise report the condition such that a Licensee Event Report could be written.

Specifically the ENO staff identified that: 1) on July 13, 2011, Entergy received an RFOST

sample result indicating total particulate concentration of 13.4 mg/l, and the parameter was

not restored to within limits until September 2, 2011; and, 2) on December 30, 2011, Entergy

received an RFOST sample result indicating total particulate concentration of 13.2 mg/l,

and, as of February 5, the parameter had not been restored to within limits. The NRC was

not informed via an LER that the plant was operating in a condition prohibited by its TS until

August 20, 2012, more than 60 days after discovery by the ENO staff.