Issue date | Title | Topic | |
---|---|---|---|
IR 05000390/2022002 | 12 August 2022 | Integrated Inspection Report 05000390/2022002 and 05000391/2022002 and Exercise of Enforcement Discretion | High Radiation Area Non-Destructive Examination Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Operability Determination Fire Protection Program |
ML20232B803 | 24 August 2020 | Notice of Violation and Proposed Imposition of Civil Penalty to TVA (EA-20-006 & EA-20-007) | |
IR 05000390/2019090 | 15 April 2019 | Final Significance Determination of a White Finding and Notice of Violation and Assessment Follow-Up Letter (NRC Inspection Report Nos. 05000390/2019090 and 05000391/2019090) Dated April 15, 2019 | Preliminary White Finding Affidavit |
IR 05000390/2016003 | 10 November 2016 | NRC Integrated Inspection Report 05000390/2016003, 05000391/2016003 and Notice of Violation and OI Report Number OI-2-2015-039 | Safe Shutdown High Radiation Area Offsite Dose Calculation Manual Fire Barrier Stroke time Internal Flooding Past operability Fire impairment Temporary Modification Locked High Radiation Area Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Operability Determination Continuous fire watch Fire Protection Program Fire Watch |
IR 05000260/2016012 | 23 June 2016 | NRC Inspection Report 05000260/2016012, Investigation Report 2-2015-008, and Apparent Violations | |
ML13169A030 | 18 June 2013 | EA-13-019, Watts Bar Unit 2, Notice of Violation and Proposed Imposition of Civil Penalty, NRC Inspection Report Number 05000391-13-614 | Commercial Grade Dedication Condition Adverse to Quality Significance Determination Process |
IR 05000391/2013614 | 18 June 2013 | EA-13-019, Watts Bar Unit 2, Notice of Violation and Proposed Imposition of Civil Penalty, NRC Inspection Report Number 05000391-13-614 | Commercial Grade Dedication Condition Adverse to Quality Significance Determination Process |
IR 05000390/2013614 | 18 June 2013 | EA-13-019, Watts Bar Unit 2, Notice Of Violation And Proposed Imposition Of Civil Penalty, NRC Inspection Report Number 05000391-13-614 | Commercial Grade Dedication Condition Adverse to Quality Significance Determination Process |
IR 05000327/2013010 | 18 March 2013 | IR 05000327-13-010, 05000328-13-010; 08/1/2012 - 02/28/2013; Sequoyah Nuclear Plant, Units 1 and 2; Operability Determinations and Functionality Assessments | Safe Shutdown Unanalyzed Condition Probabilistic Risk Assessment Functionality Assessment Fukushima Dai-Ichi Significance Determination Process Large early release frequency Operability Determination |
ML12307A104 | 29 October 2012 | Tennessee Valley Authority - Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | FLEX |
ML111780562 | 27 June 2011 | Response to Disputed Notice of Violation (EA-11-144) | Anticipated operational occurrence Backfit |
ML111290482 | 9 May 2011 | EA-11-018, Browns Ferry, Final Signficance Determination of Red Finding, Notice of Violation and Assessment Follow-up Letter 2011008 | Safe Shutdown Probabilistic Risk Assessment Operator Manual Action Functionality Assessment Significance Determination Process |
IR 05000259/2010005 | 8 April 2011 | Summary of Meeting with Browns Ferry to Discuss One Preliminary Greater than Green Finding Associated with One Apparent Violation That Was Documented in NRC Inspection Report 05000259-10-005, 05000260-10-005, and 05000296-10-005 | Safe Shutdown Fire Barrier Stroke time Probabilistic Risk Assessment Operator Manual Action Finite Element Analysis Significance Determination Process |
ML110810568 | 21 March 2011 | Notice of Meeting with Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater than Green Finding Associated with One Apparent Violation That Was Documented in NRC Inspection Report 05000259-01-005, 05000260-10- | |
IR 05000259/2001005 | 21 March 2011 | Notice of Meeting with Tennessee Valley Authority to Discuss Safety Significance of One Preliminary Greater than Green Finding Associated with One Apparent Violation That Was Documented in NRC Inspection Report 05000259-01-005, 05000260-10- | |
ML101690081 | 17 June 2010 | Reply to Tennessee Valley Authority Letter Dated 05/18/2010, Regarding Inspection Report No. 05000259-10-007, 05000260-10-007 and 05000296-10-007, Browns Ferry Nuclear Plant | Safe Shutdown Enforcement Discretion Operator Manual Action Fire Protection Program |
ML062220658 | 3 August 2006 | U. S. Nuclear Regulatory Commission Office of Investigations Report Number 2-2005-006 | |
ML020910110 | 29 March 2002 | EA-02-024 - Tennessee Valley Authority Exercise of Enforcement Discretion - NRC Special Inspection Report | Enforcement Discretion Significance Determination Process |
ML020100478 | 10 January 2002 | EA-01-316 & EA-01-317, Sequoyah Nuclear Plant, Notice of Violation | |
ML003694482 | 7 February 2000 | EA-99-234, Enclosure, ML003694482 |