Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211K768 | 30 July 1999 | Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors | |
ML20216E872 | 13 March 1998 | Rept to NRC Environ Monitoring at Grand Gulf Nuclear Station CY97, Conducted by Contract NRC-29-83-621 | |
ML20197D075 | 20 January 1998 | Corrected Rev 1 of Ltr Rept, Review of 971003 Entergy Ampacity Derating RAI Response | Fire Barrier |
ML20151S566 | 20 January 1998 | Review of 971003 Entergy River Bend Ampacity Derating RAI Response, Ltr Rept to USNRC 980120 Rev 1 | Fire Barrier |
ML20140G662 | 21 March 1997 | Rev 0 to, Review of 961219 Entergy River Bend RAI Response & Supplemental Ampacity Derating Calculations | Fire Barrier |
ML20128H535 | 7 June 1996 | Rev 0 to, Review of River Bend Station Fire Barrier Ampacity Assessments, Ltr Rept | Fire Barrier |
ML20129A864 | 11 April 1996 | Plant TER of IPE Submittal Human Reliability Analysis, Final Rept | Internal Flooding Probabilistic Risk Assessment |
ML20129A850 | 9 April 1996 | Plant TER on IPE Front End Analysis | Ultimate heat sink Mission time Internal Flooding Probabilistic Risk Assessment |
ML20129A858 | 29 February 1996 | TER of Plant IPE Back-End Submittal | Internal Flooding Probabilistic Risk Assessment Hardened vent |
ML20101C894 | 16 October 1995 | Plant IPE Insight Support Rept for NUREG-1150 Plants | Internal Flooding Probabilistic Risk Assessment |
ML20087K369 | 31 July 1995 | Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Summary of Results | Mission time Internal Flooding Probabilistic Risk Assessment Earthquake Fatality |
ML20082D526 | 31 March 1995 | Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Supporting Melcor Calculations | Ultimate heat sink Internal Flooding Hydrostatic Probabilistic Risk Assessment Fuel cladding |
ML20082B741 | 31 March 1995 | Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Evaluation of Severe Accident Risks for Plant Operational State 5 During a Refueling Outage.Main Report and Appendices | |
ML20073C367 | 31 August 1994 | Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf, Unit 1.Analysis of Core Damage Frequency from Seismic Events During Mid-Loop Operations.Main Report | Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Seismically rugged Earthquake |
ML20072N999 | 31 July 1994 | Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internally Induced Flooding Events for Plant Operational State 5 During a Refueling. | Mission time Internal Flooding Probabilistic Risk Assessment Earthquake |
ML20072D058 | 31 July 1994 | Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage | Safe Shutdown Fire Barrier Probabilistic Risk Assessment |
ML20071L741 | 30 June 1994 | Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal | Mission time Internal Flooding Probabilistic Risk Assessment |
ML20071L719 | 30 June 1994 | Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Internal | |
ML20071L611 | 30 June 1994 | Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During Refueling Outage.Internal | |
ML20071L597 | 30 June 1994 | Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Main Report | |
ML20071L583 | 30 June 1994 | Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Section 10 | |
ML20071L566 | 30 June 1994 | Evaluation of Potential Severe Accidents During LOW Power and Shutdown Operations at Grand Gulf,Unit 1.Analysis of Core Damage Frequency from Internal Events for Plant Operational State 5 During a Refueling Outage.Sections 1-9 | |
ML20063B550 | 24 January 1994 | Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-001,Grand Gulf,Unit 1, Technical Evaluation Rept | |
ML20064K051 | 31 October 1993 | Summary Rept Of:Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Final Ltr Rept | |
ML20127E318 | 18 September 1992 | Technical Evaluation of Topical Rept EA-CA-91-001-M (Steady State Core Physics Methods for BWR Design & Analysis) for Gulf States Util Co | Shutdown Margin |
ML18151A899 | 31 May 1992 | Summary Rept of :Grand Gulf Low Power & Shutdown Abridged Risk Analysis, Draft Ltr Rept | |
ML20091J162 | 30 December 1991 | Ter,River Bend Station,Unit 1,Station Blackout Evaluation, Final Rept | Safe Shutdown |
ML20066D342 | 31 December 1990 | Evaluation of Severe Accident Risks: Grand Gulf,Unit 1. Appendices | Probabilistic Risk Assessment Fatality |
ML20066D298 | 31 December 1990 | Evaluation of Severe Accident Risks: Grand Gulf,Unit 1.Main Report | |
ML20059N510 | 31 August 1990 | Technical Evaluation Rept on Response from Sys Energy Resources,Inc to Generic Ltr 88-01 Re Grand Gulf Nuclear Plant | Packing leak Weld Overlay Pressure Boundary Leakage |
ML19332G564 | 30 November 1989 | Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices.Continuation of Appendix D | Probabilistic Risk Assessment |
ML19332B614 | 31 October 1989 | Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components:Quad Cities 1 & 2, Final Technical Evaluation Rept | Safe Shutdown |
ML20248F341 | 30 September 1989 | Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events Appendices | Reactor Vessel Water Level Probabilistic Risk Assessment |
ML20248F345 | 30 September 1989 | Analysis of Core Damage Frequency: Grand Gulf, Unit 1 Internal Events | Half scram Mission time Probabilistic Risk Assessment Emergency Lighting Pressure boundary leak |
ML19324A623 | 31 May 1989 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Grand Gulf-1, Technical Evaluation Rept | |
ML20246B815 | 30 April 1989 | Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Duane Arnold,Enrico Fermi-2,Hope Creek,Lasalle County 1 & 2, Limerick 1 & 2,Millstone 1,Monticello,Nine Mile Point 1 & 2 & Oyster Creek, Technical Evaluation Rept | |
ML20246B973 | 31 March 1989 | Conformance to Reg Guide 1.97:Byron 1/2 & Braidwood 1/2, Technical Evaluation Rept | Boric Acid |
ML20236B805 | 13 March 1989 | Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files | |
ML20070Q557 | 31 January 1989 | Nuclear Power Plant Sys Sourcebook,Grand Gulf 1 | Safe Shutdown Ultimate heat sink Scram Discharge Volume |
ML20043B372 | 31 December 1988 | Stability Measurements During Cycle 2. | |
ML20195F113 | 31 October 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: River Bend-1 | |
ML20205N943 | 31 October 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Millstone-1 | |
ML20155E371 | 31 July 1988 | Technical Evaluation Rept Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification River Bend Station,Unit 1 | |
ML20149M497 | 29 February 1988 | Technical Evaluation Rept for Evaluation of Offsite Dose Calculation Manual,Rev 1,River Bend Station Unit 1 | Offsite Dose Calculation Manual |
ML19325C158 | 22 February 1988 | Technical Evaluation of Dcrdr. | |
ML20196C164 | 4 February 1988 | Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131 | |
ML20205N953 | 31 January 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: Millstone-3 | Safe Shutdown |
ML20205N948 | 31 January 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components - Millstone-2 | Safe Shutdown |
ML20235J229 | 30 September 1987 | Draft PRA-Based Sys Insp Plans | |
ML18040B189 | 31 August 1987 | Selected Operating Reactors Issues:Stability Calculations for Grand Gulf 1 & Susquehanna 2 Bwrs. |