Semantic search
Jump to navigation
Jump to search
Site | Organization | Start date | Title | Topic | |
---|---|---|---|---|---|
ENS 56145 | Bard Brachytherapy | Illinois Emergency Management Agency | 30 September 2022 05:00:00 | Lost Shipment | Brachytherapy Moisture Density Gauge |
ENS 54819 | Vt Office Of Radiological Health | Vt Office Of Radiological Health | 27 March 2020 04:00:00 | Agreement State Report - Radioactive Material Rejected at Waste Facility | |
ENS 54818 | Vt Office Of Radiological Health | Vt Office Of Radiological Health | 27 February 2020 04:00:00 | Agreement State Report Radioactive Material Rejected at Waste Facility | |
ENS 54468 | Vt Department Of Health | Vt Department Of Health | 27 November 2019 05:00:00 | Agreement State Report - Iodine-125 Prostate Implant Seed | Moisture Density Gauge |
ENS 54408 | The University Of Vermont Medical Center | Vt Office Of Radiological Health | 18 November 2019 05:00:00 | Agreement State Report - Patient Underdosage of Y-90 Resin Sir-Spheres | |
ENS 52787 | Vermont Yankee | 3 June 2017 10:15:00 | Offsite Notification of a Fatality | Fatality | |
ENS 52756 | Curtiss-Wright | Curtiss Wright Flow Control Co. | 16 March 2017 05:00:00 | Part 21 - Potential Defect in Grayboot Socket Contacts | |
ENS 52502 | C&D Technologies | C&D Technologies, Inc. | 23 November 2016 05:00:00 | Part 21 - Plastic Jar Dedication Sampling | |
ENS 51831 | Vermont Yankee | 29 March 2016 21:50:00 | Fitness-For-Duty Report Involving a Non-Licensed Supervisor | ||
ENS 51418 | Univ Of Vt Medical Center | Univ Of Vt Medical Center | 23 September 2015 14:00:00 | Medical Underdose During Sirsphere Administration | Underdose |
ENS 50299 | Sor Inc. | Sor Inc. | 16 July 2014 05:00:00 | Part 21 Report - Potentially Defective Pressure & Temperature Switches | |
ENS 50164 | Vermont Yankee | 5 April 2014 11:00:00 | Invalid Primary Containment Isolation System Actuation | ||
ENS 49934 | Vermont Yankee | 19 March 2014 14:10:00 | Fitness-For-Duty Report Involving a Non-Licensed Supervisor | ||
ENS 49825 | Vermont Yankee | 15 December 2013 05:00:00 | 60 Day Optional Telephone Notification of Invalid Pcis System Actuation | ||
ENS 49514 | Vermont Yankee | 7 November 2013 18:33:00 | Conduit Flood Seal Missing | Safe Shutdown Internal Flooding | |
ENS 49355 | Vermont Yankee | 18 September 2013 16:59:00 | High Pressure Coolant Injection System Declared Inoperable Due to Steam Leak | ||
ENS 49358 | Vermont Yankee | 23 July 2013 04:00:00 | Invalid Primary Containment Isolation System Group 3 Actuation | ||
ENS 49211 | Vermont Yankee | 14 June 2013 22:06:00 | Invalid Primary Containment Isolation System Actuation Due to a Radiation Monitor Spike | ||
ENS 49109 | Vermont Yankee | 12 June 2013 20:38:00 | Tone Alert System Failure | ||
ENS 48847 | Vermont Yankee | 24 March 2013 03:18:00 | Switchgear Room Degraded Flood Seals | ||
ENS 48797 | Anchor Darling | Flowserve | 29 December 2012 05:00:00 | Part 21 - Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections | Anchor Darling |
ENS 48585 | Ge Hitachi Nuclear Energy | Ge Hitachi Nuclear Energy | 13 December 2012 05:00:00 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ENS 48418 | Vermont Yankee | 17 October 2012 13:46:00 | Confirmed Positive Fitness for Duty Test | Fitness for Duty | |
ENS 48359 | Fairbanks Morse | Fairbanks Morse | 28 September 2012 05:00:00 | Part 21 - Fairbanks Morse Opposed Piston Edg Fuel Oil Pump Leak | Hydrostatic |
ENS 48350 | Ge Hitachi Nuclear Energy | Ge Hitachi Nuclear Energy | 27 September 2012 15:01:00 | Error in Main Steam Line High Flow Calculational Methodology | |
ENS 47968 | Pilgrim | 26 May 2012 06:00:00 | Press Release Regarding Status of Ongoing Labor Negotiations | ||
ENS 47962 | Vermont Yankee | 24 May 2012 20:30:00 | Missing Flooding Barrier Inside East Switchgear Room | Safe Shutdown Internal Flooding | |
ENS 49967 | C&D Technologies Inc | C&D Technologies Inc | 14 February 2012 04:00:00 | Interim Part 21 Report - Misaligned Separators in Lcr-25 Standby Batteries | |
ENS 47630 | Ge Hitachi Nuclear Energy | Ge Hitachi Nuclear Energy | 1 February 2012 05:00:00 | Part 21 Report - Failure of Crd Collet Retainer Tube/Outer Tube Weld | |
ENS 47542 | Vermont Yankee | 21 December 2011 20:15:00 | Offsite Notification Due to Water Sample Testing Positive for Low Level of Tritium | ||
ENS 47495 | Vermont Yankee | 2 December 2011 14:45:00 | Wrong Train Emergency Diesel Fuel Rack Trip | ||
ENS 47379 | Vermont Yankee | 26 October 2011 15:25:00 | Offsite Notification to State and Local Officials Due to Inadvertent Siren Activation | Inadvertent Siren Activation Siren | |
ENS 47500 | Vermont Yankee | 11 October 2011 21:29:00 | Loss of Vital Ac Power While Shutdown | ||
ENS 47241 | Vermont Yankee | 5 September 2011 08:03:00 | Loss of Meterological Tower Vertical Temperature Difference Instrumentation Due to Lightning Strike | ||
ENS 47238 | Vermont Yankee | 3 September 2011 06:35:00 | Technical Specification Required Shutdown Due to Rhr/Cs Room Cooler Being Inoperable | ||
ENS 47200 | Vermont Yankee | 26 August 2011 17:45:00 | Press Release Regarding Licensee Hurricane Preparation Activities | ||
ENS 46618 | Vermont Yankee | 16 February 2011 16:25:00 | Steam Leak on High Pressure Coolant Injection System | ||
ENS 46449 | Rosemount Nuclear | Rosemount Nuclear | 22 November 2010 06:00:00 | Anolmaly Discovered on Rosemount Model 1152 Differential Pressure Transmitters with Output Code "L" 10-50 Ma Electronics | |
ENS 46348 | Ge Hitachi Nuclear Energy | Ge Hitachi Nuclear Energy | 20 October 2010 04:00:00 | Part 21 - Crack Indications in Marathon Control Rod Blades | |
ENS 46230 | Ge Hitachi Nuclear Energy | Ge Hitachi Nuclear Energy | 3 September 2010 04:00:00 | Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ENS 46212 | Vermont Yankee | 29 August 2010 23:05:00 | Unusual Event Declared Due to Loss of Annuciators in the Control Room | ||
ENS 46069 | Vermont Yankee | 4 July 2010 23:30:00 | Problem with Tone Alert System | ||
ENS 46038 | Vermont Yankee | 23 June 2010 18:25:00 | Unusual Event Declared Due to an Earthquake Felt Onsite | Earthquake | |
ENS 45987 | Vermont Yankee | 8 June 2010 15:26:00 | Technical Specification Required Shutdown Due to Primary Containment Leak Greater than Limits | ||
ENS 45958 | Vermont Yankee | 27 May 2010 06:00:00 | Loss of Communications | ||
ENS 45957 | Vermont Yankee | 26 May 2010 19:26:00 | Automatic Reactor Scram While Increasing Power | ||
ENS 46070 | Vermont Yankee | 17 May 2010 04:00:00 | 60 Day Report - Invalid Actuation of Hpci and Rcic Systems | ||
ENS 45927 | Ge Hitachi Nuclear Energy | Ge Hitachi Nuclear Energy | 15 April 2010 04:00:00 | Bent Fuel Spacer Flow Wing | |
ENS 45613 | Vermont Yankee | 7 January 2010 20:30:00 | Offsite Notification to State and Local Agencies Concerning Results of Quarterly Ground Water Analysis | ||
ENS 45313 | Vermont Yankee | 31 August 2009 13:44:00 | Fitness for Duty - Supervisor Tested Positive for Alcohol | Fitness for Duty |