Technical specification required shutdown due to reactor recirculation unit #7 [RHR/CS Room Cooler]
inoperable. This cooling unit impacts the operability of 'A'
Low Pressure Coolant Injection (
LPCI) and 'A'
Core Spray (
CS).
Entered TS 3.5.A.6. Commenced reducing power for 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> cold shutdown LCO.
The licensee has initiated repairs to the cooling unit.
The licensee notified the NRC Resident Inspector.
- * * UPDATE AT 1432 EDT ON 09/03/11 FROM JAMES KRITZER TO S. SANDIN * * *
The licensee exited TS 3.5.A.6 at 1000 EDT and declared CS operable after implementing compensatory measures. They are currently in a 7-day LCO Action Statement and expect to complete repairs within the time allowed. The Unit is currently holding power at 98%.
The licensee informed the NRC Resident Inspector.