The following information was received by facsimile:
GEH [General Electric Hitachi] has recently discovered that calculations of choked flow rate in the Main Steam Line (MSL) of GEH BWRs may not be conservative, with the potential impacts to be evaluated for existing MSL high-flow setpoints and Analytical Limits (ALs).
GEH has not completed the evaluation of this condition to determine reportability under 10CFR Part 21 and is therefore issuing this 60-day Interim Notification. GEH will close or issue an update on this matter on or before December 12, 2012. Given the early status of the evaluation, GEH has no recommended actions at this time. This 60-day Interim Notification is issued in accordance with 10CFR Part 21.21(a)(2), and will be sent to all GE
BWR/2-6 plants and ABWR plants.
Affected plants include the following: Nine Mile 1-2, Fermi 2, Columbia, Grand Gulf, River Bend, FitzPatrick, Pilgrim,
Vermont Yankee, Clinton, Dresden 2-3, LaSalle 1-2, Limerick 1-2, Oyster Creek, Peach Bottom 2-3, Quad Cities 1-2, Perry 1, Duane Arnold, Cooper, Susquehanna 1-2, Brunswick 1-2, Hope Creek, Hatch 1-2, Browns Ferry 1-3, and Monticello.