ENS 56410Yankee Rowe15 March 2023 00:00:00Loss of Response Capabilities
ENS 56815Pilgrim6 July 2022 04:00:00Lost Sealed SourcesMoisture Density Gauge
ENS 55844Pilgrim15 April 2022 14:00:00Notification of Environmental Report to Another Government Agency
ENS 55567Pilgrim9 November 2021 15:40:00Offsite Notification Due to Violation of Discharge Permit
ENS 55202Pilgrim21 April 2021 11:52:00Offsite Notification to the Commonwealth of Massachusetts
ENS 55071Pilgrim18 January 2021 21:00:00Offsite Notification Due to Leak from Underground Sewage Storage Tank
ENS 54895Pilgrim10 September 2020 14:02:00Fitness for Duty (Ffd) Policy Violation
ENS 54071Pilgrim18 May 2019 03:03:00Manual Reactor Scram Due to Degrading Condenser Vacuum
ENS 53818Pilgrim8 January 2019 05:00:00Reactor Core Isolation Cooling Declared Inoperable
ENS 53815Pilgrim5 January 2019 15:40:00En Revision Imported Date 2/12/2019Safe Shutdown
Time of Discovery
ENS 53648Pilgrim5 October 2018 04:00:00Automatic Reactor Scram Due to Low Reactor Water Level
ENS 53287Pilgrim25 March 2018 20:16:00Control Rod Drive Piping Potentially InoperableTime of Discovery
Design basis earthquake
ENS 53259Pilgrim13 March 2018 14:00:00Off-Site Power Unavailable Due to Winter StormSafe Shutdown
ENS 53242Pilgrim3 March 2018 04:15:00Potential Loss of Offsite Response Capabilities
ENS 53147Pilgrim4 January 2018 19:10:00Manual Reactor Scram Due to Partial Loss of Offsite Power During Winter Storm
ENS 53041Pilgrim30 October 2017 06:47:00Severe Weather Causes Loss of Power to Support Buildings
ENS 52820Pilgrim20 June 2017 18:44:00Secondary Containment Declared Inoperable Due to Both Airlock Doors Open Simultaneously
ENS 52744Pilgrim10 May 2017 18:11:00Appendix J Local Leakage Exceeded Acceptance CriteriaLocal Leak Rate Testing
ENS 52655Pilgrim31 March 2017 15:55:00Pressure Suppression Pool Declared Inoperable Due to Torus High Water Level
ENS 52643Pilgrim27 March 2017 22:25:00Hpci Declared Inoperable Due to Inadvertent Isolation
ENS 52492Pilgrim16 January 2017 16:55:00Failure of Reactor Building Isolation Dampers to Isolate
ENS 52449Pilgrim20 December 2016 23:30:00Offsite Notification - Release of Hydrogen Gas in Excess of the Reportable Quantity of Ten Pounds
ENS 52352Pilgrim7 November 2016 21:09:00Hpci Declared Inoperable Due to Failure of Ist Surveillance Test
ENS 52231Pilgrim9 September 2016 21:39:00Offsite Notification - Release of Hydrogen Gas in Excess of the Reportable Quantity of Ten Pounds
ENS 52223Pilgrim6 September 2016 12:27:00Manual Reactor Scram Due to High Reactor Water Level
ENS 52181Pilgrim15 August 2016 19:52:00Salt Service Water System Declared Inoperable
ENS 52056Pilgrim30 June 2016 18:30:00Both Primary Containment Isolation Valves for a Penetration Potentially Inoperable
ENS 51924Pilgrim12 May 2016 20:47:00Deterioration of Spent Fuel Pool Rack Neutron Absorbing MaterialUnanalyzed Condition
ENS 51862Pilgrim12 April 2016 04:50:00Loss of Both Emergency Diesel Generators
ENS 51523Pilgrim9 November 2015 13:00:00Technical Support Center Unavailable Due to Planned Maintenance
ENS 51456Pilgrim5 October 2015 21:25:00Safe Shutdown Analysis for Fire Event - Open Item with Potential to Impact Capability to Operate Motor Operated ValvesHot Short
Safe Shutdown
Unanalyzed Condition
Fire Watch
ENS 51338Pilgrim22 August 2015 20:28:00Reactor Scram Due to a Single Msiv Closure
ENS 51301Pilgrim9 August 2015 20:27:00Salt Service Water System Declared Inoperable
ENS 51279Pilgrim31 July 2015 14:42:00Fitness for Duty Report Involving a SupervisorFitness for Duty
ENS 51267Pilgrim27 July 2015 16:29:00Fitness for Duty Report Involving a Licensed EmployeeFitness for Duty
ENS 51087Pilgrim22 May 2015 14:02:00Manual Reactor Scram Due to Loss of Condenser Vacuum
ENS 51174Pilgrim13 May 2015 04:00:00Voluntary Report - Information Only
ENS 50790Pilgrim5 February 2015 18:00:00Loss of Sea Water Intake Bay Level Instrumentation Due to Loss of Instrument Air
ENS 50771Pilgrim27 January 2015 14:48:00Loss of High Pressure Coolant Injection
ENS 50769Pilgrim27 January 2015 09:02:00Automatic Reactor Scram on Turbine Trip Due to Loss of Offsite Power
ENS 50356Pilgrim12 August 2014 06:38:00Hpci Potential Inoperability Discovered During Post Maintenance Testing
ENS 50273Pilgrim11 July 2014 12:23:00Loss of Assessment Capability - Loss of Power to the Plant Process Computer
ENS 50134Pilgrim23 May 2014 16:10:00Offsite Notification - Release of Hydrogen Gas in Excess of Reportable Quantity
ENS 49905Pilgrim12 March 2014 17:15:00Loss of Communication - Federal Telephone System (Fts)Health Physics Network
ENS 49605Pilgrim3 December 2013 18:30:00Loss of Emergency Communications Capability- Ep Conferencing Lines Unavailable
ENS 49454Pilgrim19 October 2013 07:31:00Group 1 Isolation Due to High Reactor Water Level
ENS 49296Pilgrim22 August 2013 11:55:00Reactor Protection Actuation (Scram)
ENS 49201Pilgrim17 July 2013 14:54:00Salt Service Water System Declared Inoperable
ENS 49196Pilgrim15 July 2013 20:52:00Salt Service Water System Declared Inoperable
ENS 49189Pilgrim15 July 2013 04:29:00Unusual Event Declared Due to Loss of Control Room Annunciators