Title | Safe Shutdown Analysis for Fire Event - Open Item with Potential to Impact Capability to Operate Motor Operated Valves |
Event Description | At 1725 [EDT] on Monday, October 5, 2015, while updating the site fire safe shutdown analysis report, Pilgrim Nuclear Power Station (PNPS) identified vulnerabilities in two (2) specific fire areas that required a compensatory fire watch. The compensatory fire watches have already been established.
The specific concern involves the unlikely scenario that fire forces evacuation of the control room. In addition, it is postulated that motor operated valves cannot be operated from their alternate control location due to spurious operation caused by hot shorts in control wiring. The specific failure mode is described in NRC Information Notice (IN) 92-18. Engineering modifications are under development and scheduled for implementation to address this specific IN 92-18 concern. Based on the above, the condition is reportable to the NRC as an unanalyzed condition that significantly degrades plant safety. As such the condition is reportable under 50.72(b)(3)(ii)(B), and requires an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> notification. The licensee has notified the NRC Resident Inspector. |
Where | |
---|---|
Pilgrim Massachusetts (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+0.38 h0.0158 days <br />0.00226 weeks <br />5.20524e-4 months <br />) | |
Opened: | Kenneth Gracia 21:48 Oct 5, 2015 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Oct 5, 2015 |
51456 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 51456\u003C/a\u003E - \u003Ca href=\"/Pilgrim\" title=\"Pilgrim\"\u003EPilgrim\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ESafe Shutdown Analysis for Fire Event - Open Item with Potential to Impact Capability to Operate Motor Operated Valves\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 51456 - Pilgrim\n","link":"","lat":41.942861111111114,"lon":-70.57673055555556,"icon":""}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Pilgrim with 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
WEEKMONTHYEARENS 532872018-03-25T20:16:00025 March 2018 20:16:00
[Table view]10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded Control Rod Drive Piping Potentially Inoperable ENS 519242016-05-12T20:47:00012 May 2016 20:47:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Deterioration of Spent Fuel Pool Rack Neutron Absorbing Material ENS 514562015-10-05T21:25:0005 October 2015 21:25:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Safe Shutdown Analysis for Fire Event - Open Item with Potential to Impact Capability to Operate Motor Operated Valves ENS 472882011-09-22T18:52:00022 September 2011 18:52:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Salt Service Water Pump Inoperability During Postulated Degraded Voltage Conditions ENS 469332011-06-07T12:00:0007 June 2011 12:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Errors in Methodology Used for Emergency Core Cooling System Performance Requirements 2018-03-25T20:16:00 | |