At 1725 [EDT] on Monday, October 5, 2015, while updating the site fire
safe shutdown analysis report, Pilgrim Nuclear Power Station (
PNPS) identified vulnerabilities in two (2) specific fire areas that required a compensatory
fire watch. The compensatory fire watches have already been established.
The specific concern involves the unlikely scenario that fire forces evacuation of the control room. In addition, it is postulated that motor operated valves cannot be operated from their alternate control location due to spurious operation caused by hot shorts in control wiring. The specific failure mode is described in NRC Information Notice (IN) 92-18.
Engineering modifications are under development and scheduled for implementation to address this specific IN 92-18 concern.
Based on the above, the condition is reportable to the NRC as an unanalyzed condition that significantly degrades plant safety. As such the condition is reportable under 50.72(b)(3)(ii)(B), and requires an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> notification.
The licensee has notified the NRC Resident Inspector.