The licensee declared a Notice of Unusual Event resulting from a loss of control room
annunciators for greater than 15 minutes. The
EAL Condition is SU 4.1. Compensatory measures have been established per Abnormal Operating Procedures. The plant continues to operate at 100 percent power.
The licensee has called for support staff to troubleshoot the issue. No other major components are out of service.
The licensee has notified the NRC Resident Inspector.
Notified DHS SWO, FEMA, DHS NICC and the Nuclear SSA via email.
- * * UPDATE FROM KEVIN O'ROURKE TO PETE SNYDER AT 0205 EDT ON 7/15/13 * * *
Annunciator indication has returned for some time and appears to be working. Engineering and electrical instrumentation and control staff are onsite to troubleshoot but have not established any cause. The licensee remains in the Unusual Event until additional confidence can be established in annunciator indication.
Notified R1DO (Cook).
- * * UPDATE FROM STAN PAUL TO JOHN SHOEMAKER AT 2350 EDT on 7/16/13 * * *
The NOUE declared on July 15, 2013 at 0029 EDT hours due to loss of main control room annunciation was terminated on July 16, 2013 at 2310 EDT hours when the annunciation system was declared functional.
Plant personnel and vendors have completed diagnostic checks and testing, system voltages are normal, and the annunciator system is working normally.
The licensee has notified the NRC Resident Inspector.
Notified R1DO (Gray),
NRR EO (Hiland),
IRD MOC (Grant),
DHS SWO,
FEMA,
DHS NICC and the Nuclear
SSA via email.