Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21299A00328 October 2021and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME CodeStress corrosion cracking
ML15120A3157 May 2015Relief Request ISI-06, Inservice Inspection Limited Examinations for the Fourth 10-Year IntervalIncorporated by reference
ML14147A21618 June 2014Request for Exemption from Requirements of 10 CFR 50.54(m) Related to Minimum Staffing Requirements for Licensed and Senior Reactor OperatorsExemption Request
BVY 13-018, Inservice Inspection Program for the Fifth Ten-Year Interval27 March 2013Inservice Inspection Program for the Fifth Ten-Year IntervalNon-Destructive Examination
Mission time
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
VT-2
Incorporated by reference
High Energy Line Break
Aging Management
Foreign Material Exclusion
Flow Accelerated Corrosion
Intergranular Stress Corrosion Cracking
Large early release frequency
Stress corrosion cracking
Moisture barrier
License Renewal
Earthquake
EVT-1
Dissimilar Metal Weld
Scaffolding
GOTHIC
Thermal fatigue
Water hammer
ML1026002491 October 2010Relief Request VY-ISI-014, Alternative Examination Requirement for Nozzle-To-Vessel Weld and Inner Radius Using ASME Code Case N-702-Vermont Yankee Nuclear Power StationIncorporated by reference
ML09117011130 April 2009Relief Request ISI-2008-1, Use of Later ASME Section XI Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Destructive Testing Activities-Vermont YankeeNondestructive Examination
Incorporated by reference
CNRO-2009-00003, Letter from Entergy Response to Request for Additional Information Regarding Request ISI-2008-1 Use of Later ASME Section Xl Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non Destructive Examination Activ17 March 2009Letter from Entergy Response to Request for Additional Information Regarding Request ISI-2008-1 Use of Later ASME Section Xl Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non Destructive Examination ActivitiesNondestructive Examination
ML07353047731 January 2008Relief Request No. ISI-PT-01, Alternate Pressure Testing for Buried Piping Components, Fourth Inservice Inspection IntervalVT-2
Incorporated by reference
Through-Wall Leak
BVY 07-017, Relief Request No. ISI-PT-01, Alternate Pressure Testing for Buried Piping Components, Fourth Inservice Inspection Interval20 April 2007Relief Request No. ISI-PT-01, Alternate Pressure Testing for Buried Piping Components, Fourth Inservice Inspection IntervalVT-2
ML05237024419 September 2005Safety Evaluation of Relief, Use Various Boiling Water Reactor Vessels Internal Program Guidelines as an Alternative to Certain Requirements of Section XI of ASME Code for Inservice Inspection of Reactor Vessel Internal (Rvi) ComponentsNondestructive Examination
Incorporated by reference
EVT-1
BVY 05-071, Clarifications to Relief Request RI-01 Table1 August 2005Clarifications to Relief Request RI-01 TableEVT-1
ML0410700886 July 2004Relief Request to Use American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Case N-600
ML0403700665 March 2004Safety Evaluation of Relief Requests for the Fourth 10-Year Interval of the Inservice Inspection Program. (TAC Nos. MB8349 Through MB8358)Weld Overlay
Nondestructive Examination
Dissimilar Metal Weld
Thermal fatigue
ML03318046922 December 2003Relief Requests for Fourth 10-year Inservice Testing Program Interval (TAC No. MB7489 Through MB7494)Incorporated by reference
Scaffolding
ML0320203886 October 2003Relief Request Nos. RR-P01, RR-P02, RR-P03, RR-P04, RR- V01, and RR-V02 (TAC Nos MB7489 Through MB7494)Incorporated by reference
Scaffolding
JPN-03-020, Indian Point Nuclear Generating Station, Units 2 & 3, Pilgrim Nuclear Power Station, Vermont Yankee Nuclear Power Station, Relief, Relief Request to Use ASME Code Case N-60011 August 2003Indian Point Nuclear Generating Station, Units 2 & 3, Pilgrim Nuclear Power Station, Vermont Yankee Nuclear Power Station, Relief, Relief Request to Use ASME Code Case N-600
ML02220009426 August 2002Third 10-Year Interval Inservice Inspection Program Plan Request for Relief No. P-4Incorporated by reference
ML02197011714 August 2002Safety Evaluation of Inservice Testing Relief Request for Safety Related PumpsIncorporated by reference
ML02140058031 May 2002Relief Request RR-V20, Revision 0, Correction Letter Related to the Inservice Testing Program
ML02085050523 April 2002Relief Request RR-V20, Revision 0, Related to the Inservice Testing Program (Tac No. MB3469)Stroke time
ML02108001315 April 2002Use of ASME Code Case N-566-1