ML23142A10624 May 2023Authorization and Safety Evaluation for Alternative Request No. ANO1-ISI-035Reactor Vessel Water Level
Stress corrosion cracking
Eddy Current Testing
ML22073A0957 April 2022Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (EPID L-2021-LLR-0084) (NON-PROPRIETARY)Nondestructive Examination
Finite Element Analysis
Stress corrosion cracking
Liquid penetrant
ML21293A09628 October 2021Relief ANO2-R&R-012 Concerning Proposed Alternative for Repair of Reactor Vessel Closure Head Penetration 46
ML21299A00328 October 2021and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME CodeStress corrosion cracking
ML21168A0569 July 2021Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel CodeEddy Current Testing
Pressure Boundary Leakage
ML21118B03919 May 2021Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel CodeNon-Destructive Examination
Probabilistic Risk Assessment
ML20365A00119 January 2021Relief Request 5-8 Related to ASME Code Case N-729-4 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration NozzlesStress corrosion cracking
Dissimilar Metal Weld
ML20282A76416 October 2020Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant - Relief Request 5-8 for Alternate Repair of Reactor Closure Head Penetration NozzlesExclusive Use
Affidavit
ML20275A3431 October 2020Verbal Authorization for Proposed Alternative (RR 5-8) Reactor Vessel Closure Head Penetration Repairs
ML20272A16630 September 2020Attachment 3 - Framatome Document No. ANP-3876, Revision 1Q1NP, Response to NRC Request for Additional Information of Palisades Relief Request Number RR 5-8, Repair of Reactor Pressure Vessel Head Penetration, Inservice Inspection Program,
ML20267A38723 September 2020Relief Request Number RR 5-8, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head PenetrationsStress corrosion cracking
Affidavit
ML20267A38823 September 2020Attachment 1 - Relief Request Number RR 5-8, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head PenetrationsNondestructive Examination
Stress corrosion cracking
Liquid penetrant
Dissimilar Metal Weld
CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)12 August 2020Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)Nondestructive Examination
Incorporated by reference
ML20121A1936 May 2020Alternative Requests for the Fifth 10 Year Interval Inservice Testing of Low Pressure Safety Injection Pumps and Service Water ValvesIncorporated by reference
ML20119A07329 April 2020Withdrawal of Requested Alternatives for the Fifth 10-Year Interval Inservice Testing of Service Water Pumps and Visual Examination of Snubbers
ML20083J96826 March 2020Approval of Request for Alternative ANO 2-PT-002 End-of-Internal System Leakage Test for Extended Reactor Coolant Pressure Boundary PipingIntergranular Stress Corrosion Cracking
Stress corrosion cracking
Thermal fatigue
ML20022A25828 January 2020Re-Issuance of Approval of Relief Request WF3-RR-19 2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume ControlWeld Overlay
Liquid penetrant
ML20002A02013 January 2020Approval of Relief Request WF3-RR-19-2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control SystemWeld Overlay
Liquid penetrant
ML19254A60319 September 2019Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1
ML19247B1979 September 2019Approval of Relief Request W3-ISI-032,Relief from the Requirements of ASME Code Section XI Regarding Volumetric Examination
ML19232A02527 August 2019Authorization of Proposed Alternative to ASME Code Section XI, IWA-4000, Repair/Replacement ActivitiesWeld Overlay
Nondestructive Examination
Stress corrosion cracking
Liquid penetrant
Dissimilar Metal Weld
2CAN071902, Request for Alternative ANO 2-PT-002 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping25 July 2019Request for Alternative ANO 2-PT-002 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary PipingVT-2
W3F1-2019-0052, CFR 50.55a Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 in Accordance with 10 CFR 50.55a(z)(2)18 July 2019CFR 50.55a Relief Number WF3-RR-19-2, Proposed Alternative to Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 in Accordance with 10 CFR 50.55a(z)(2)Boric Acid
Weld Overlay
Probabilistic Risk Assessment
Operating Basis Earthquake
Liquid penetrant
Through-Wall Leak
Operational leakage
ML19184A55415 July 2019Request for Relief ANO1-ISI-032 from the ASME Code Section XI Visual Examination Requirements for the Fourth 10-Year Inservice Inspection IntervalIncorporated by reference
ML19156A40011 June 2019Request for Alternative ANO2-ISI-021 to Permit Continued Application of the 2007 Edition Through the 2008 Addenda of ASME CodeIncorporated by reference
CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 131 January 2019Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1Nondestructive Examination
Flow Accelerated Corrosion
Dissimilar Metal Weld
W3F1-2018-0065, Request for Relief from ASME Section XI Volumetric Examination Requirements - Third 10-Year Interval, W3-ISI-03230 November 2018Request for Relief from ASME Section XI Volumetric Examination Requirements - Third 10-Year Interval, W3-ISI-032VT-2
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
Thermal fatigue
ML18128A0678 June 2018Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4Incorporated by reference
Operability Determination
Through-Wall Leak
Through-Wall Leakage
1CAN041801, Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements Fourth 10-Year Interval, Second and Third Period23 April 2018Requests for Relief from American Society of Mechanical Engineers (ASME) Section XI Volumetric Examination Requirements Fourth 10-Year Interval, Second and Third PeriodThermal fatigue
ML17341A12011 December 2017Relief Request PRR-WF3-2017-3, Request for Alternative to ASME OM Code Requirements for Comprehensive Testing of High Pressure Safety Injection Pump AB (CAC No. MF9875; EPID L-2017-LLR-0049)Incorporated by reference
ML17328A88229 November 2017Requests for Relief GRR-1, PRR-1 and PRR-2, Alternatives to ASME OM Code Requirements for Inservice Testing for the Fourth 10-Year Program Interval (CAC Nos. MF9869, 9870, and 9871; EPID L-2017-LRM-0045-47)Boric Acid
Power-Operated Valves
Grace period
CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 117 November 2017Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1Nondestructive Examination
Finite Element Analysis
Stress corrosion cracking
Operability Determination
Through-Wall Leak
Through-Wall Leakage
ML21067A4987 September 2017Relief Request No. RR 5-4 Proposed Alternative, Weld Reference SystemIncorporated by reference
Scaffolding
ML17194A80714 August 2017Relief Request No. RR 4-25 Limited Coverage Examinations During the Fourth 10-Year Inservice Inspection IntervalIncorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML17174B14412 July 2017Relief Request for EN-ISI-16-1 Regarding Use of Later Edition and Addenda of the ASME CodeNondestructive Examination
Incorporated by reference
Stress corrosion cracking
Dissimilar Metal Weld
ML17137A02829 June 2017Relief Request Number RR 5; 5 Proposed Alternative, Under-Vessel Leakage ExaminationNondestructive Examination
VT-2
Unidentified leakage
Operational leakage
ML17069A18722 March 2017Request for Alternative to 10 CFR 50.55a(c) ASME Code Section III Code Case 1361-1, Relief Request W3-ISI-024Incorporated by reference
ML16235A2289 December 2016Request for Alternative Test Plan to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants
ML16130A4719 December 2016Request for Alternative Test Plan to American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants (CAC Nos. MF7537 and MF7538)
ML16237A08229 August 2016Relief Request No. ANO1-ISI-025, Relief from American Society of Mechanical Engineers Section XI Table IWB-2500-1 RequirementsIncorporated by reference
Eddy Current Testing
Dissimilar Metal Weld
ML16182A2706 July 2016Relief Request PRR-WF3-2016-1, Alternative to the Inservice Testing ProgramIncorporated by reference
ML16096A2696 June 2016Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1Functionality Assessment
Operability Determination
Liquid penetrant
ML16022A1071 February 2016Relief Request Number RR 4-23- Proposed Alternative Concerning ASME Code Depth Sizing RequirementNondestructive Examination
Dissimilar Metal Weld
ML15320A24425 November 2015Relief Request Number 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-Year ISI Interval for ISI Related ActivitiesIncorporated by reference
PNP 2015-073, Forwards Response to Request for Additional Information Regarding Relief Request Number RR 4-22 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination17 September 2015Forwards Response to Request for Additional Information Regarding Relief Request Number RR 4-22 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination
PNP 2015-075, Submittal of Relief Request Number RR 4-23, Proposed Alternative Concerning ASME Code Depth Sizing Requirement16 September 2015Submittal of Relief Request Number RR 4-23, Proposed Alternative Concerning ASME Code Depth Sizing RequirementDissimilar Metal Weld
CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D5 June 2015Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, DivisionFlow Accelerated Corrosion
Liquid penetrant
PNP 2015-024, Requests Relief of Proposed Alternatives for the Fifth 10-Year Inservice Test Interval19 May 2015Requests Relief of Proposed Alternatives for the Fifth 10-Year Inservice Test IntervalStroke time
Grace period
PNP 2015-022, Relief Request Number RR 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-year ISI Interval for ISI Related Activities29 April 2015Relief Request Number RR 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-year ISI Interval for ISI Related ActivitiesNon-Destructive Examination
Nondestructive Examination
Incorporated by reference
Stress corrosion cracking
ML15070A42816 March 2015Relief Request ANO2-ISI-017, Alternative to Utilize ASME Code Case N-513-4 for the Fourth 10-Year Inservice Inspection IntervalTime of Discovery
Dissimilar Metal Weld