Issue date | Title | Topic | |
---|---|---|---|
ML23198A321 | 27 July 2023 | Authorization and Safety Evaluation for Proposed Alternative RV-1 | Safe Shutdown Incorporated by reference |
ML23121A220 | 4 May 2023 | Proposed Alternative P-1 Regarding Safeguard Building Sump Pumps | Incorporated by reference |
ML22077A841 | 24 March 2022 | Proposed Alternative SNB-3 for the Snubber Inservice Program Third Interval Extension | Incorporated by reference |
ML21021A100 | 1 February 2021 | Proposed Alternative to the Requirements of the ASME OM Code to Extend the Inservice Testing Program Interval for Certain Snubbers (EPID L-2020-LLR-0095 (Covid 19)) | Incorporated by reference Locked High Radiation Area Pandemic Coronavirus COVID-19 |
ML21013A128 | 28 January 2021 | Approval of Proposed Alternative to the Requirements of the ASME Code to Extend the Third Inservice Inspection Interval (EPID L-2020-LLR-0092 (COVID-19)) | Boric Acid Incorporated by reference Pandemic Coronavirus COVID-19 |
ML21021A002 | 28 January 2021 | Approval of Proposed Alternatives 1A4-1 and 1A4-2 from Certain Requirements of 10 CFR 50.55a for Inservice Inspection of Nuclear Power Plants | Boric Acid Nondestructive Examination Pandemic Coronavirus COVID-19 |
ML20253A117 | 5 October 2020 | Approval of Request for Alternative from Certain Requirements of 10 CFR 50.55a for Operation and Maintenance of Nuclear Power Plants (EPIDs L-2020-LLR-0063, L-2020-LLR-0064, and L-2020-LLR-0065 (COVID-19)) | Boric Acid Nondestructive Examination Pandemic Coronavirus COVID-19 Dissimilar Metal Weld |
CP-202000431, Relief Request 1A4-1 Supplement - Reactor Vessel (Rv) Upper Head Examinations | 5 August 2020 | Relief Request 1A4-1 Supplement - Reactor Vessel (Rv) Upper Head Examinations | Boric Acid VT-2 Pandemic Coronavirus COVID-19 Pressure Boundary Leakage |
ML20196L823 | 14 July 2020 | Relief Request SNB-1, Snubber Testing | Pandemic Coronavirus COVID-19 |
ML20196L824 | 14 July 2020 | Relief Request 1A3-2, Inservice Inspection (Isi), Table 1 | |
ML20196L825 | 14 July 2020 | Relief Request SNB-1, Snubber Testing, Table 1 | |
ML20196L826 | 14 July 2020 | Relief Request V-3, Inservice Testing (IST) | Pandemic Coronavirus |
ML20196L829 | 14 July 2020 | Relief Request 1A3-2, Inservice Inspection (ISI) | Boric Acid VT-2 Pandemic Coronavirus COVID-19 Pressure Boundary Leakage |
ML20196L827 | 14 July 2020 | Relief Request 1A4-2, Reactor Vessel (Rv) Bottom Mounted Instrumentation (Bmi) Nozzle Penetration Examination | Boric Acid Weld Overlay VT-2 Pandemic Coronavirus Pressure Boundary Leakage |
ML20196L830 | 14 July 2020 | Relief Request V-3, Inservice Testing (Ist), Table 1 | Loop seal Past operability Pandemic Coronavirus |
CP-202000262, Snubber Testing and Snubber Visual Examinations Relief Request | 10 April 2020 | Snubber Testing and Snubber Visual Examinations Relief Request | Nondestructive Examination Pandemic Coronavirus COVID-19 |
CP-202000261, Inservice Inspection (ISI) and Inservice Testing (IST) Program Relief Requests | 7 April 2020 | Inservice Inspection (ISI) and Inservice Testing (IST) Program Relief Requests | Boric Acid Loop seal VT-2 Pandemic Coronavirus Pressure Boundary Leakage Grace period |
ML17095A251 | 7 April 2017 | Request for Alternative 2B3-1 Re Examination of Reactor Vessel Closure Head Penetration Nozzles | |
ML16179A405 | 11 July 2016 | Relief Request Nos. B-9, B-3, B-10, and B-11 for Piping Welds, Second 10-year Inservice Inspection Interval | Boric Acid VT-2 Incorporated by reference Pressure Boundary Leakage Through-Wall Leak Dissimilar Metal Weld Scaffolding |
ML16074A001 | 14 March 2016 | Relief Request 1B3-3, Alternative for Reactor Pressure Vessel Cold Leg Weld Inspection Frequency from Not to Exceed 7 Years to 9 Years for the Third 10-Year Inservice Inspection Interval | Through-Wall Leak DM weld |
ML16063A001 | 11 March 2016 | Relief Request No. B-15, C-2, and C-4 for Welds in the RPV and Containment Spray and Residual Heat Removal Heat Exchanger Shells, Second 10-year Inservice Inspection Interval | VT-2 Incorporated by reference Liquid penetrant |
ML16011A073 | 19 January 2016 | Relief Request T-1; Alternative to the ASME OM Code Frequency Specifications for Inservice Testing for the Third 10-Year IST Interval | Power-Operated Valves Grace period |
ML15259A004 | 30 October 2015 | Relief Request 1B3-4, Alternative for Reactor Pressure Vessel Head Penetration Weld Inspection Frequency (from 10 to 15 Years), Third 10-Year Inservice Inspection Interval | Boric Acid VT-2 |
ML15257A242 | 18 September 2015 | Relief Request 2A3-1, from ASME Code Section XI Requirements, Risk-Informed Process for Selection of Class 1 and Class 2 Piping Weld Examinations, Third 10-Year Inservice Inspection Interval | Internal Flooding Probabilistic Risk Assessment Large early release frequency Exemption Request DM weld |
ML15257A240 | 15 September 2015 | Relief Request 2C3-1, from ASME Code, Section XI Requirements Reactor Pressure Vessel Leak-Off Flange for the Third 10-Year Inservice Inspection Interval | Boric Acid VT-2 Foreign Material Exclusion |
CP-201500671, Relief Request T-1 for Inservice Testing Program for Application of an Alternative to the ASME OM Code Frequency Specifications, (2007 Edition of ASME Code, Section XI, 2008 Addenda Third Interval Start Date: August 3. | 30 June 2015 | Relief Request T-1 for Inservice Testing Program for Application of an Alternative to the ASME OM Code Frequency Specifications, (2007 Edition of ASME Code, Section XI, 2008 Addenda Third Interval Start Date: August 3. | Grace period |
ML15090A104 | 3 April 2015 | Relief Requests B-7, B-12, and B-13 - Steam Generator Head-to-Tube Sheet Welds for the Second 10-Year Inservice Inspection Interval | VT-2 Incorporated by reference |
ML14087A066 | 10 April 2014 | Relief Request No. 1/2E-1 for Containment Electrical Penetrations for the Third 10-Year Inservice Inspection Interval | Safe Shutdown Scaffolding |
ML14073A544 | 1 April 2014 | Relief Request No. B-14 for Reactor Pressure Vessel Hot Leg Nozzle Weld Examinations for the Second 10-Year Inservice Inspection Interval | Incorporated by reference Dissimilar Metal Weld DM weld |
ML13158A093 | 26 June 2013 | Relief Request No. E-1 Containment Electrical Penetrations, for the Second 10-Year Inservice Inspection Interval | Safe Shutdown Scaffolding |
ML13148A437 | 26 June 2013 | Relief Request No. P-1 for Pumps and Valves, Third 10-Year Inservice Testing Plan Interval | |
ML13113A379 | 8 May 2013 | Relief Request No. V-1, from ASME Code for Operation and Maintenance of Nuclear Power Plants Requirements for Pumps and Valves, for the Third 10-Year Inservice Testing Interval | Stroke time |
ML13046A385 | 19 March 2013 | Relief Request C-2 for the Reactor Pressure Vessel Flange Leak-Off Piping, Third 10-Year Inservice Inspection Interval | Boric Acid VT-2 Incorporated by reference Foreign Material Exclusion |
ML13056A503 | 15 March 2013 | Relief Request B-2, Alternative to ASME Code Requirements for Examination of Reactor Vessel Hot-Leg Nozzle Welds, for the Third 10-Year Inservice Inspection Interval | Incorporated by reference Dissimilar Metal Weld DM weld |
CP-201300003, Submittal of Relief Request No. B-2, Third 10 Year ISI Interval from 10CFR50.55a Requirements for Reactor Vessel Hot Leg Nozzle Weld Examinations (Third ISI Interval Start Date August 13, 2010) | 16 January 2013 | Submittal of Relief Request No. B-2, Third 10 Year ISI Interval from 10CFR50.55a Requirements for Reactor Vessel Hot Leg Nozzle Weld Examinations (Third ISI Interval Start Date August 13, 2010) | Weld Overlay Dissimilar Metal Weld DM weld |
CP-201201384, Response to Request for Additional Information for Relief Request No. E-1 | 14 November 2012 | Response to Request for Additional Information for Relief Request No. E-1 | |
ML12194A250 | 14 August 2012 | Relief Request A-1 for Approval of Risk-Informed Alternative to ASME Code, Section XI for Class 1 and 2 Piping Welds, Third 10-Year Inservice Inspection Interval | Weld Overlay Probabilistic Risk Assessment Incorporated by reference Large early release frequency Exemption Request Dissimilar Metal Weld |
ML113110092 | 19 December 2011 | Relief Request No. C-9, Reactor Pressure Vessel Flange Leak-off Piping Configuration, Second 10-Year Inservice Inspection Interval | Boric Acid VT-2 Incorporated by reference Foreign Material Exclusion |
ML112650083 | 10 November 2011 | Approval of Relief Request Nos. B-10 and B-11 for the Second 10-Year Inservice Inspection Interval | VT-2 Incorporated by reference |
CP-201001546, Relief Request No. B-11 for the Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) | 15 December 2010 | Relief Request No. B-11 for the Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) | VT-2 |
CP-201001544, Relief Request No. C-9 for the Second 10 Year Interval from 10 CFR 50.55a Inspection Requirements Due to Hardship (Second Interval Start Date: August 13, 2000) | 15 December 2010 | Relief Request No. C-9 for the Second 10 Year Interval from 10 CFR 50.55a Inspection Requirements Due to Hardship (Second Interval Start Date: August 13, 2000) | Boric Acid VT-2 Foreign Material Exclusion |
CP-201000890, Relief Request No. C-7 for the Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) | 15 December 2010 | Relief Request No. C-7 for the Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) | VT-2 |
ML092870637 | 22 December 2009 | Relief Request B-9 for Unit 1 and B-8 for Unit 2 to Extend the Inservice Inspection Interval for the Reactor Vessel Weld Examination | Incorporated by reference |
CP-200901227, Revision to Request for Relief to Extend the Unit 1 and 2 in Service Inspection Interval for the Reactor Vessel Weld Examination and Withdrawal of License Amendment Request 09-004 to Add License Condition for Submittal of ISI Informatio | 14 September 2009 | Revision to Request for Relief to Extend the Unit 1 and 2 in Service Inspection Interval for the Reactor Vessel Weld Examination and Withdrawal of License Amendment Request 09-004 to Add License Condition for Submittal of ISI Information an | Probabilistic Risk Assessment |
ML091620548 | 23 July 2009 | Relief Request P-2, Inservice Testing Plan for Pumps and Valves for Second Interval | Incorporated by reference |
CP-200801132, Relief Request No. P-2 for the Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval) | 24 September 2008 | Relief Request No. P-2 for the Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval) | Safe Shutdown Probabilistic Risk Assessment |
ML082130147 | 22 August 2008 | Request for Relief B-2 for Second 10-Year Inservice Inspection Interval from 10 CFR 50.55a Inspections Requirements Due to Physical Interferences | VT-2 Incorporated by reference |
CP-200800927, (Cpnpp), Relief Request B-8 for Unit 1 Second 10 Year ISI Interval & B-6 for Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Requirements for Reactor Vessel Hot & Cold Leg Nozzle Weld Examinations (Unit 1 Second Interval Start.. | 10 July 2008 | (Cpnpp), Relief Request B-8 for Unit 1 Second 10 Year ISI Interval & B-6 for Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Requirements for Reactor Vessel Hot & Cold Leg Nozzle Weld Examinations (Unit 1 Second Interval Start.. | Dissimilar Metal Weld |
ML080520195 | 10 March 2008 | Relief Request B-5 for Second 10-Year ISI Interval from 10 CFR 50.55a Requirements for Class 1 Repair/Replacement of Control Rod Drive Mechanism Canopy Seal Welds | Boric Acid High Radiation Area Weld Overlay Nondestructive Examination Incorporated by reference Liquid penetrant |
ML080430662 | 29 February 2008 | Request for Relief No. B-4 from Certain Requirements of ASME Code, Section XI for Implementation of the EPRI-PDI Supplement 11 Program and Application of Weld Overlays | Weld Overlay Hydrostatic Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |