Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22307A246 | 10 November 2022 | Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (EPIDs L-2021-LLR-0035 and L-2021-LLR-0036) | Probabilistic Risk Assessment Incorporated by reference |
RS-22-110, Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. | 20 September 2022 | Supplemental Information - Proposed Alternatives Related to the Steam Generators and Request. | Non-Destructive Examination Scaffolding |
RS-22-036, Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds | 10 March 2022 | Supplemental Information - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds | |
ML21280A078 | 27 October 2021 | Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) | Incorporated by reference |
ML21230A206 | 3 September 2021 | Proposed Alternative to Use ASME OM Code Case OMN-28 | Incorporated by reference |
ML21216A220 | 5 August 2021 | Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting | Coatings Nondestructive Examination Incorporated by reference |
ML21134A006 | 3 August 2021 | Proposed Alternatives to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (Epids L-2020-LLR-0099 and L-2020-LLR-0100) | Incorporated by reference |
RS-21-008, Request for Alternative: One-Time Deferral of Follow-Up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) | 25 January 2021 | Request for Alternative: One-Time Deferral of Follow-Up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) | Boric Acid Weld Overlay Nondestructive Examination VT-2 Incorporated by reference Pandemic Coronavirus COVID-19 Pressure Boundary Leakage Through-Wall Leak |
ML20269A200 | 30 September 2020 | Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 | Incorporated by reference |
ML20245E506 | 9 September 2020 | Relief from the Requirements of the ASME Code (COVID-19) | Boric Acid Nondestructive Examination Pandemic Coronavirus Pressure Boundary Leakage |
ML20188A264 | 6 July 2020 | Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information | Incorporated by reference |
ML20113F041 | 30 April 2020 | Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) | Incorporated by reference Pandemic Coronavirus COVID-19 |
ML20099D955 | 17 April 2020 | Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations | Non-Destructive Examination Incorporated by reference |
RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) | 28 February 2020 | Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) | Power-Operated Valves |
ML19269C534 | 27 September 2019 | Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques | Incorporated by reference |
ML19136A386 | 5 June 2019 | Relief from the Requirements of the American Society of Mechanical Engineers Code | Nondestructive Examination Finite Element Analysis Liquid penetrant |
ML19141A020 | 5 June 2019 | Relief from the Requirements of the American Society of Mechanical Engineers Code | Nondestructive Examination Liquid penetrant |
ML19155A060 | 5 June 2019 | Relief from the Requirements of the American Society of Mechanical Engineers Code | Boric Acid Nondestructive Examination Incorporated by reference Locked High Radiation Area Pressure Boundary Leakage |
ML19161A257 | 4 June 2019 | BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 | Incorporated by reference |
ML19035A294 | 25 February 2019 | Relief from the Requirements of the ASME Code | Boric Acid Incorporated by reference Locked High Radiation Area Pressure Boundary Leakage |
JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds | 15 February 2019 | Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds | Dissimilar Metal Weld |
RS-19-015, Relief Request 14-RS-1 to Implement Code Case OMN-13 | 31 January 2019 | Relief Request 14-RS-1 to Implement Code Case OMN-13 | |
ML18318A334 | 17 January 2019 | Relief from the Requirements of the American Society of Mechanical Engineers Code | Hydrostatic Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
ML18331A037 | 17 January 2019 | Relief from the Requirements of the American Society of Mechanical Engineers Code | |
ML18347B419 | 17 January 2019 | Relief Request I4R-03, Relief from ASME Requirements for the Fourth 10-Year Inservice Inspection Interval Related to Degraded Canopy Seal Welds Associated with Control Rod Drive Mechanism | Boric Acid Weld Overlay Nondestructive Examination VT-2 Liquid penetrant |
ML18305A360 | 6 December 2018 | Relief from the Requirements of the American Society of Mechanical Engineers Code | VT-2 Through-Wall Leakage |
RS-18-125, Proposed Alternative Requirements for the Repair and Examination of Reactor Pressure Vessel Head Penetration Nozzles for the Fourth Lnservice Inspection Interval in Accordance with 10 CFR 50.55a(z)(1) | 11 October 2018 | Proposed Alternative Requirements for the Repair and Examination of Reactor Pressure Vessel Head Penetration Nozzles for the Fourth Lnservice Inspection Interval in Accordance with 10 CFR 50.55a(z)(1) | Nondestructive Examination Liquid penetrant |
RS-18-123, Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) | 24 September 2018 | Request for Alternative Follow-up Inspection for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(2) | Boric Acid Nondestructive Examination Locked High Radiation Area Pressure Boundary Leakage |
JAFP-18-0052, Proposed Alternative to Utilize Code Case N-879 | 30 May 2018 | Proposed Alternative to Utilize Code Case N-879 | Nondestructive Examination |
JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-880 | 30 May 2018 | Proposed Alternative to Utilize Code Cases N-878 and N-880 | Nondestructive Examination |
ML17325B571 | 10 January 2018 | Non-Proprietary, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Services (CAC No. MF9854; EPID L-2017-LLR-0042) | Weld Overlay Nondestructive Examination Finite Element Analysis Flow Induced Vibration |
RS-17-168, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) | 20 December 2017 | Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) | Nondestructive Examination Finite Element Analysis Flow Induced Vibration |
RS-17-168, Braidwood Station, Unit 2, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) | 20 December 2017 | Braidwood Station, Unit 2, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) | Nondestructive Examination Finite Element Analysis Flow Induced Vibration |
ML17249A298 | 13 November 2017 | Relief from the Requirements of the ASME Code (CAC No. MF9597; EPID L-2017-LLR-0021) | Weld Overlay Nondestructive Examination Finite Element Analysis Flow Induced Vibration |
ML17249A241 | 19 September 2017 | Relief from the Requirements of the ASME Code | Weld Overlay Nondestructive Examination Finite Element Analysis Flow Induced Vibration |
RS-17-083, Inservice Inspection Program Third Interval Relief Requests 13R-12 and 13R-15 | 29 June 2017 | Inservice Inspection Program Third Interval Relief Requests 13R-12 and 13R-15 | VT-2 |
ML17170A013 | 26 June 2017 | Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) | |
ML17095A268 | 31 March 2017 | Submittal of Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces: Attachment 1, Relief Request | Weld Overlay Nondestructive Examination Finite Element Analysis Flow Induced Vibration |
ML17054C255 | 15 March 2017 | Request for Relief from Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) | Probabilistic Risk Assessment Incorporated by reference |
ML17062A428 | 6 March 2017 | Request for Relief from the Requirements of the ASME Code | Weld Overlay Nondestructive Examination Incorporated by reference |
ML17047A038 | 24 February 2017 | Request I4R-11 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) | Boric Acid Nondestructive Examination Incorporated by reference Finite Element Analysis Liquid penetrant |
ML16327A318 | 20 December 2016 | Request I4R-06, Relief from the Requirements of the ASME Code | |
ML16327A396 | 20 December 2016 | Request I4R-01, Relief from the Requirements of the ASME Code | Internal Flooding Probabilistic Risk Assessment VT-2 Exemption Request Dissimilar Metal Weld |
ML16327A421 | 19 December 2016 | Requested Relief from the Requirements of the Asme Code (CAC Nos. MF7641 and MF7642) | Liquid penetrant |
ML16306A366 | 8 November 2016 | Request I4R-08, Relief from the Requirements of the ASME Code | Probabilistic Risk Assessment Incorporated by reference |
ML16230A237 | 6 September 2016 | Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) | Incorporated by reference Through-Wall Leak |
ML16162A211 | 29 June 2016 | Request for Use of Alternative | |
ML16109A337 | 27 April 2016 | Relief from the Requirements of the ASME Code (CAC Nos. MF6715, MF6716, MF6717, and MF6718) | Boric Acid Nondestructive Examination Incorporated by reference Finite Element Analysis |
ML15173A436 | 30 June 2015 | Relief from the Requirements of the ASME Code | Boric Acid High Radiation Area Probabilistic Risk Assessment VT-2 Incorporated by reference Through Wall Leak |
RS-15-170, Submittal of Relief Requests Associated with the Fourth Inservice Testing Interval | 22 June 2015 | Submittal of Relief Requests Associated with the Fourth Inservice Testing Interval | Stroke time Grace period |