Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19249B77629 August 2019Enclosure 6 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Summary of CalculationsMet Tower
ML19249B78129 August 2019Enclosure 7 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Summary of CalculationsMet Tower
ML19122A38528 April 20192018 Radioactive Effluent Release Report, Volume 2Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Power change
ML19011A1764 January 2019Enclosure 7 - Summary of Calculations
ML19011A1774 January 2019Enclosure 7 - Attachment 1 - Calculation RP-18-08, MPS1 Abnormal Rad Release Gaseous EAL Thresholds Based on NEI 99-01, Revision 6.Met Tower
ML19011A1794 January 2019Enclosure 7 - Attachment 2 - Calculations for Containment High Range Radiation Monitor Responses to a LOCA
ML19011A1804 January 2019Enclosure 7 - Attachment 3 - Detector Response to an RCS Sample
ML19011A1814 January 2019Enclosure 7 - Attachment 4 - Post-Accident Radiation Response for Primary Sample Line
ML19011A1824 January 2019Enclosure 7 - Attachment 5 - Post-Accident Radiation Monitor Response for Core Uncovery
ML19011A1834 January 2019Enclosure 7 - Attachment 6 - Post-Accident Letdown Radiation Monitor Response
ML18127A2171 May 2018Annual Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
ML13219A1091 August 2013Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink.Ultimate heat sink
GOTHIC
ML13213A02530 July 2013Proto-Power Calculation 98-119, Revision B - Analysis of MP2 EDG Heat Exchanger Thermal Performance Test ResultsUltimate heat sink
ML12227A5139 August 2012Calculation 98-ENG-02405D2, Revision 2, Millstone, Unit 2 Service Water Inlet Temperature - Indicator Accuracy TI-6928, TI-6929 & TI-6930, Attachment 3
ML12227A5239 August 2012Calculation 98-ENG-02045D2 Rev. 00, Attachment 4-A, Pages A2 and A3
ML12227A5229 August 2012Calculation 98-ENG-02405D2, Revision 2, Justification for the Table Accuracy Value Used in the Minco RTD Sca Term, Attachment 8, Page 1 of 32Ultimate heat sink
ML12227A5219 August 2012Calculation 98-ENG-02405D2, Revision 2, Attachment 7, Page 1 of 6
ML12227A5209 August 2012Calculation 98-ENG-02405D2, Revision 2, Attachment 6, Page 1 of 5
ML12227A5199 August 2012Calculation 98-ENG-02405D2, Revision 2, Attachment 5, Page 1 of 3
ML12227A5189 August 2012Calculation 98-ENG-02405D2, Revision 2, Safety Related Instrument Calibrations - Shutdown, Attachment 4, Page 1 of 7
ML12227A5169 August 2012Calculation 98-ENG-02405D2, Revision 2, Attachment 3, Page 1 of 3
ML12227A5159 August 2012Calculation 98-ENG-02405D2, Revision 2, Attachment 2, Page 1 of 5, Vendor Technical ManualReverse polarity
ML12227A5149 August 2012Calculation 98-ENG-02405D2, Revision 2 Attachment 1, Page 1 of 13
ML12025A22618 January 2012Calculation 32-9149958-001, Millstone, Unit 2 Cycle 21 Peaking Factor Uncertainty Analysis for Ici Detector Misalignment, (Non-Proprietary)
ML11160021613 June 2011Exhibit D (Part 2): Millstone 2001 Safstor Calculation
ML09191045813 March 2009Enclosure 2 - Report No.: FAI/09-44R, Rev. 0, Post-Test Analysis of the Fai Millstone 3 RWST 1/4 Scale Gas Entrainment Test.
ML09187082913 March 2009Calculation No. FAI/09-44R, Rev. 0, Post-Test Analysis of the Fai Millstone 3 RWST Scale Gas Entrainment Test, Enclosure 2
ML07291002114 September 2007Instrumentation Technical Specification Changes, Calculation Zpm Drift-0426012, Rev. 0, Zero Power Mode Drift Analysis in Support of LBDCR 06-MP2-036.Shutdown Margin
ML06205005715 March 2005Attachment 4, Supplement to Proposed Technical Specifications Change Recirculation Spray System, Calculation, Us (B)-341, Rev. 4 Ccn 1, Containment Atmosphere Iodine Removal Coefficients
ML0419003556 July 2004Proposed Risk-Informed Technical Specifications Change Five-Year Extension of Type a Test IntervalProbabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
ML04117039815 April 2004Connecticut, Inc. Millstone Power Station Unit 3 License Amendment Request Regarding a Change to the Fire Protection ProgramSafe Shutdown
Fire Barrier
Significance Determination Process
Earthquake
Continuous fire watch
Fire Protection Program
Fire Watch
Early Warning Fire Detection