Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19249B776 | 29 August 2019 | Enclosure 6 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Summary of Calculations | Met Tower |
ML19249B781 | 29 August 2019 | Enclosure 7 - Millstone, Units 2 and 3 and ISFSI; North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - Summary of Calculations | Met Tower |
ML19122A385 | 28 April 2019 | 2018 Radioactive Effluent Release Report, Volume 2 | Time of Discovery Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Power change |
ML19011A176 | 4 January 2019 | Enclosure 7 - Summary of Calculations | |
ML19011A177 | 4 January 2019 | Enclosure 7 - Attachment 1 - Calculation RP-18-08, MPS1 Abnormal Rad Release Gaseous EAL Thresholds Based on NEI 99-01, Revision 6. | Met Tower |
ML19011A179 | 4 January 2019 | Enclosure 7 - Attachment 2 - Calculations for Containment High Range Radiation Monitor Responses to a LOCA | |
ML19011A180 | 4 January 2019 | Enclosure 7 - Attachment 3 - Detector Response to an RCS Sample | |
ML19011A181 | 4 January 2019 | Enclosure 7 - Attachment 4 - Post-Accident Radiation Response for Primary Sample Line | |
ML19011A182 | 4 January 2019 | Enclosure 7 - Attachment 5 - Post-Accident Radiation Monitor Response for Core Uncovery | |
ML19011A183 | 4 January 2019 | Enclosure 7 - Attachment 6 - Post-Accident Letdown Radiation Monitor Response | |
ML18127A217 | 1 May 2018 | Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report |
ML13219A109 | 1 August 2013 | Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink. | Ultimate heat sink GOTHIC |
ML13213A025 | 30 July 2013 | Proto-Power Calculation 98-119, Revision B - Analysis of MP2 EDG Heat Exchanger Thermal Performance Test Results | Ultimate heat sink |
ML12227A513 | 9 August 2012 | Calculation 98-ENG-02405D2, Revision 2, Millstone, Unit 2 Service Water Inlet Temperature - Indicator Accuracy TI-6928, TI-6929 & TI-6930, Attachment 3 | |
ML12227A523 | 9 August 2012 | Calculation 98-ENG-02045D2 Rev. 00, Attachment 4-A, Pages A2 and A3 | |
ML12227A522 | 9 August 2012 | Calculation 98-ENG-02405D2, Revision 2, Justification for the Table Accuracy Value Used in the Minco RTD Sca Term, Attachment 8, Page 1 of 32 | Ultimate heat sink |
ML12227A521 | 9 August 2012 | Calculation 98-ENG-02405D2, Revision 2, Attachment 7, Page 1 of 6 | |
ML12227A520 | 9 August 2012 | Calculation 98-ENG-02405D2, Revision 2, Attachment 6, Page 1 of 5 | |
ML12227A519 | 9 August 2012 | Calculation 98-ENG-02405D2, Revision 2, Attachment 5, Page 1 of 3 | |
ML12227A518 | 9 August 2012 | Calculation 98-ENG-02405D2, Revision 2, Safety Related Instrument Calibrations - Shutdown, Attachment 4, Page 1 of 7 | |
ML12227A516 | 9 August 2012 | Calculation 98-ENG-02405D2, Revision 2, Attachment 3, Page 1 of 3 | |
ML12227A515 | 9 August 2012 | Calculation 98-ENG-02405D2, Revision 2, Attachment 2, Page 1 of 5, Vendor Technical Manual | Reverse polarity |
ML12227A514 | 9 August 2012 | Calculation 98-ENG-02405D2, Revision 2 Attachment 1, Page 1 of 13 | |
ML12025A226 | 18 January 2012 | Calculation 32-9149958-001, Millstone, Unit 2 Cycle 21 Peaking Factor Uncertainty Analysis for Ici Detector Misalignment, (Non-Proprietary) | |
ML111600216 | 13 June 2011 | Exhibit D (Part 2): Millstone 2001 Safstor Calculation | |
ML091910458 | 13 March 2009 | Enclosure 2 - Report No.: FAI/09-44R, Rev. 0, Post-Test Analysis of the Fai Millstone 3 RWST 1/4 Scale Gas Entrainment Test. | |
ML091870829 | 13 March 2009 | Calculation No. FAI/09-44R, Rev. 0, Post-Test Analysis of the Fai Millstone 3 RWST Scale Gas Entrainment Test, Enclosure 2 | |
ML072910021 | 14 September 2007 | Instrumentation Technical Specification Changes, Calculation Zpm Drift-0426012, Rev. 0, Zero Power Mode Drift Analysis in Support of LBDCR 06-MP2-036. | Shutdown Margin |
ML062050057 | 15 March 2005 | Attachment 4, Supplement to Proposed Technical Specifications Change Recirculation Spray System, Calculation, Us (B)-341, Rev. 4 Ccn 1, Containment Atmosphere Iodine Removal Coefficients | |
ML041900355 | 6 July 2004 | Proposed Risk-Informed Technical Specifications Change Five-Year Extension of Type a Test Interval | Probabilistic Risk Assessment Large early release frequency Maintenance Rule Program |
ML041170398 | 15 April 2004 | Connecticut, Inc. Millstone Power Station Unit 3 License Amendment Request Regarding a Change to the Fire Protection Program | Safe Shutdown Fire Barrier Significance Determination Process Earthquake Continuous fire watch Fire Protection Program Fire Watch Early Warning Fire Detection |