Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20198S194 | 30 November 1998 | Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan,Southern Nuclear Operating Co, Vogtle Electric Generating Plant,Units 1 & 2 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Dissimilar Metal Weld |
ML20101S041 | 30 November 1995 | Plant TER on Individual Plant Exam Back-End Analysis | Mission time Internal Flooding Fuel cladding |
ML20101S045 | 20 November 1995 | TER of IPE Submittal,Human Reliability Analysis, Final Rept | Internal Flooding Probabilistic Risk Assessment |
ML20101S038 | 15 November 1995 | Plant TER on Individual Plant Exam Front End Analysis | Safe Shutdown Packing leak Mission time Internal Flooding Probabilistic Risk Assessment |
ML20080A672 | 30 September 1994 | Technical Evaluation Rept,Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Vogtle-1/-2 | |
ML20091D275 | 22 August 1991 | Final Rept SAIC-91/6686, Technical Evaluation Electric Vogtle Electric Generating Plant Units 1 & 2 Station Blackout Evaluation | Safe Shutdown Battery sizing |
ML20043H926 | 31 March 1990 | Draft Rev 0 to, Vogtle Electric Generating Plant Risk-Based Insp Guide (Based on Generic Insights from Probabilistic Risk Assessments for Westinghouse Pwrs). | Probabilistic Risk Assessment |
ML20084T251 | 31 October 1989 | Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:Georgia Power Co,Vogtle Electric Generating Plant,Unit 1 | Weld Overlay Hydrostatic VT-2 Incorporated by reference Through-Wall Leak |
ML20011D101 | 31 July 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1,Equipment Classification for All Other Safety-Related Components: Vogtle-1/-2, Technical Evaluation Rept | |
ML20235M420 | 30 June 1987 | Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Vogtle 1 & 2, Informal Rept | |
ML20215J270 | 28 February 1987 | Pump & Valve Inservice Testing Program,Vogtle Electric Generating Plant,Unit 1, Final Technical Evaluation Rept | Boric Acid Stroke time Power Operated Valves |
ML20211K510 | 30 November 1986 | Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 | |
ML20209E308 | 31 October 1986 | Audit of Environ Qualification of Safety-Related Electrical Equipment for Vogtle Electric Generating Plant Unit 1, Informal Rept | Boric Acid |
ML20214E713 | 30 April 1986 | Conformance to Reg Guide 1.97,Vogtle Electric Generating Plant,Units 1 & 2 | |
ML20136F653 | 31 December 1985 | Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept | Nondestructive Examination |
ML20205F440 | 31 October 1985 | Review of the Vogtle Units 1 and 2 Auxiliary Feedwater System Reliability Analysis | Earthquake |
ML20138J663 | 30 September 1985 | Emergency Classification Sys | High winds Fuel cladding |
ML20137V968 | 23 September 1985 | In-Progress Audit Rept of Dcrdr Being Conductd by Georgia Power Co for Vogtle Electric Generating Plant,Unit 1 | |
ML20128H779 | 30 June 1985 | Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept | |
ML20126E986 | 31 May 1985 | Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Technical Evaluation Rept | |
ML20115J879 | 30 April 1985 | Analysis of Thermal Performance & Evaporative Losses of Vogtle UHS Cooling Tower Sys | Safe Shutdown Ultimate heat sink |
ML20107E382 | 30 January 1985 | Conformance to Reg Guide 1.97,Vogtle Electric Generating Plant,Units 1 & 2 | Boric Acid Reactor Vessel Water Level |
ML20101R104 | 31 October 1984 | Draft Review of Vogtle Units 1 & 2 Auxiliary Feedwater Sys Reliability Analysis, Technical Evaluation Rept | |
ML20099A256 | 25 January 1984 | Comments on Vogtle Electric Generating Plant Unit 1 Detailed Control Room Design Review | Post Accident Monitoring |