Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17086A1629 April 2017Correction to Technical Specification Page 5.0-11Hydrostatic
Pressure and Temperature Limits Report
ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions27 April 2009Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour RestrictionsSafe Shutdown
Fitness for Duty
ML07346006229 November 2007Request for License Amendment - Control Room Envelope Habitability (TSTF-7448, Revision 3)Safe Shutdown
Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Incorporated by reference
Annual Radiological Environmental Operating Report
Recently irradiated fuel
ML0701105014 January 2007Technical Specification Revisions for Control Rod Operability Scram Insertion Times and Control Rod Accumulator RequirementsShutdown Margin
Anticipated operational occurrence
Hydrostatic
Abnormal operational transient
Scram Discharge Volume
Overtravel
ML07004044127 December 2006License Amendment Request for Adoption of TSTF-484 Revision 0, Use TS 3.10.1 for Scram Time Testing ActivitiesHydrostatic
Incorporated by reference
ML05304045018 October 2005Technical Specifications Amendment Request for Single Control Withdrawal Allowances, TS 3/4.14 Special Operations.High Radiation Area
Hydrostatic
Scram Discharge Volume
Spiral reload
ML0517204062 June 2005Technical Specifications Amendment Request to Revise Reactor Coolant System Leakage Detection System Instrumentation Requirements and ActionsGrab sample
Hydrostatic
Pressure Boundary Leakage
Pressure boundary leak
ML05082052722 March 2005Technical Specification Pages Re Reporting RequirementsOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML0426400262 September 2004License Amendment Request, Technical Specification Changes for Single Recirculation Loop OperationSafe Shutdown
Safety Limit Minimum Critical Power Ratio
Abnormal operational transient
Fire Protection Program
ML04216022622 July 2004Deletion of Requirement from LCO 3/4.10.D, Multiple Control Rod Removal
ML04113027914 April 2004Request for Amendment to the Technical Specifications Reactor Vessel Hydrostatic and Leak Testing RequirementsTime of Discovery
High Radiation Area
Hydrostatic
Missed surveillance
ML04006062224 December 2003Application for Technical Specification (TS) Improvement to Delete the TS Requirements for the Hydrogen Analyzers Using the Consolidated Line Item Improvement ProcessIncorporated by reference
ML02352007110 December 2002Request for Amendment to the Technical Specifications (Ts), Jet Pump Operability Surveillance Requirements and Correction to Reference Cited in TS 4.11.C.1
ML0234402374 December 2002Proposed Change to Applicability of Pilgrim'S Pressure-Temperature Curves as Described in Technical Specification Figures 3.6.1, 3.6.2, & 3.6.3, Revision 1Hydrostatic
ML02330027619 August 2002Request for Amendment to the Technical Specifications Changes to Post-Accident Monitoring Instrumentation RequirementsPost Accident Monitoring
ML02240003619 August 2002Request for Amendment to the Technical Specifications Changes to Post-Accident Monitoring Instrumentation RequirementsPost Accident Monitoring
ML0219905245 July 2002License Amendment Request, Appendix K Measurement Uncertainty Recovery - Power Uprate RequestUltimate heat sink
Anticipated operational occurrence
Power change
ML02078041115 March 2002Enclosure -TS Pages and NRC Form 374Safe Shutdown
Safeguards Contingency Plan
ML17037B7797 February 1974Letter Regarding Petition for Derating of Certain Boiling Water Reactors and Enclosed Before the Atomic Safety and Licensing Appeal Board in the Matter of Vermont Yankee Nuclear Power Corporation - Vermont Yankee Nuclear ...