--As v =~Ente).4y Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Michael A. Balduzzi Site Vice President July 22, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket 50-293 License No. DPR-35 Deletion of Requirement from LCO 3/4.10.D, Multiple Control Rod Removal (TAC No. MB 6214)

REFERENCE:

1.

Entergy Letter, 2.02.064, Request for Amendment to the Technical Specifications, Deletion of Requirement from LCO 3/4.10.D, "Multiple Control Rod Removal" dated, August 16, 2002

2.

Entergy Letter, 2.03.035, Response to NRC Request for Additional Information, Deletion of Requirement from LCO 3/4.1 0.D, Multiple Control Rod Removal, dated March 25, 2003 LETTER NUMBER:

2.04.066

Dear Sir or Madam:

The attachment 1 provides revised marked-up Technical Specification (TS) page 3/4.10-3 to support a proposed License Amendment request (References 1 and 2). TS 3.10.D.1.d is revised to ensure that the act of loading fuel into the core is prohibited verses having fuel in the core when implementing these requirements.

The changes in this letter do not invalidate the no significant hazard conclusions previously submitted in the original submittal (Reference 1).

This letter contains no commitments.

If you have any questions or require additional information, please contact Mr. Bryan Ford, Licensing Manager, at (508) 830-8403.

204066 jq00 I

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Letter Number: 2.04.066 Page 2 I declare under penalty of perjury that the foregoing is true and correct.

Executed on the 22nd of July 2004.

Michael A. Balduzzi Site Vice President WGI/dm Attachments: 1.

Marked-up Technical Specification Page 3/4.10-3 cc:

Mr. Lee Licata, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-83B-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station Mr. Robert Walker Radiation Control Program Commonwealth of Massachusetts Exec Offices of Health & Human Services 174 Portland Street Boston, MA 02114 Ms. Cristine McCombs Mass. Emergency Management Agency 400 Worcester Road P.O. Box 1496 Framingham, MA 01702 204066

ATTACHMENT 1 TO LETTER NUMBER 2.04.066 Marked-up Technical Specification Page 3/4.10-3 204066

w -

b -

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIRE1MENTS 3.10 CORE ALTERATIONS (Cont)

D.

Multiple Control Rod Removal (Cont)

b. The source ra e monito (SRM) are ope ble per Specificatio 3.
c. The Reactivity requirements of Specification 3.3.A.1 are

-- P;

-A 4.10 CORE ALTERATIONS (Cont)

D.

Multiple Control Rod Removal (Cont)

J The SRM nnels are r operable p r Specificatioi

/

3.3.B./.3

c. The Reactivity Margin requirements of Specification 3.3.A.1 are satisfied.

I d

co o

<Ll rod in a

array centered on ea 0 f the control rods b 'ng removed are ful inserted tand electrical or(

/

hydraulic y disarmed, or have t surrounding four

/fue assemblies removed fro

/

vtht e

core cell.

e. All other control rods are fully inserted.
f. The four fuel assemblies are removed from the core cell surrounding each control rod or control rod drive mechanism to be removed from the core and/or reactor vessel.
e. All other control rods are fully inserted.
f. The four fuel assemblies surrounding each control rod and/or control rod drive mechanism that is to be removed from the reactor vessel at the same time are removed from the core and/or reactor vessel.

Amendment No. 41 3/4.10-3