DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 13 July 2023 | License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High Radiation Area Ultimate heat sink Mission time Stroke time Tornado Missile Internal Flooding Hydrostatic Probabilistic Risk Assessment FLEX Surveillance Frequency Control Program Large early release frequency Earthquake Maintenance Rule Program Power Operated Valves Turbine Missile Offsite Circuit |
DCL-22-011, License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | 10 March 2022 | License Amendment Request 22-02 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections | Nondestructive Examination |
DCL-21-019, Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition | 1 April 2021 | Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition | Probabilistic Risk Assessment Cyber Security Aging Management Large early release frequency Safeguards Contingency Plan Earthquake Control of Heavy Loads Fire Protection Program |
DCL-20-063, Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications | 31 August 2020 | Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications | |
DCL-17-076, Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, Clarification of Rod Position Requirements (License Amendment Request 17-01) | 28 September 2017 | Revision to Technical Specifications to Adopt Technical Specifications Task Force TSTF-547, Revision 1, Clarification of Rod Position Requirements (License Amendment Request 17-01) | Shutdown Margin Surveillance Frequency Control Program |
DCL-15-087, Revision to TS 3.4.15 for License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1, Change in Technical Specification End States (WCAP-16294) | 6 August 2015 | Revision to TS 3.4.15 for License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1, Change in Technical Specification End States (WCAP-16294) | Grab sample Surveillance Frequency Control Program Pressure Boundary Leakage |
DCL-09-032, License Amendment Request 09-03, License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. | 5 May 2009 | License Amendment Request 09-03, License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. | Safe Shutdown |
DCL-08-008, License Amendment Request 08-01, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program | 1 February 2008 | License Amendment Request 08-01, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program | Ultimate heat sink GOTHIC |
ML073240008 | 8 January 2008 | Units, 1 and 2, Tech Spec Pages for Amendment Nos. 198 and 199, Revise Technical Specification (TS) 3.3.2, TS 5.5.9, and TS 5.6.10 to Support Replacement of Steam Generators | |
DCL-07-093, Diablo Canyon, Units 1 & 2 - License Amendment Request 07-02, Revision to Technical Specification 3.5.4, Refueling Water Storage Tank | 2 October 2007 | Diablo Canyon, Units 1 & 2 - License Amendment Request 07-02, Revision to Technical Specification 3.5.4, Refueling Water Storage Tank | Boric Acid |
ML072840049 | 2 October 2007 | License Amendment Request 07-02, Revision to Technical Specification 3.5.4, Refueling Water Storage Tank | Boric Acid |
ML070190094 | 11 January 2007 | License Amendment Request 07-01, Revision to Technical Specifications to Support Steam Generator Replacement | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Pressure and Temperature Limits Report Annual Radiological Environmental Operating Report Process Control Program |
ML063260025 | 21 November 2006 | Tech Spec Pages for Amendment 191 Technical Specification 5.6.5, Core Operating Limits Report (COLR) | |
DCL-06-061, License Amendment Request 06-04, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (TSTF-449) | 30 May 2006 | License Amendment Request 06-04, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (TSTF-449) | Nondestructive Examination Incorporated by reference Earthquake Fuel cladding Pressure Boundary Leakage Power change |
ML060680314 | 7 March 2006 | Issuance of Technical Specification Pages Re LCO Applicability 3.0 - Limiting Condition for Operation (LCO) Applicability | |
ML060230052 | 13 January 2006 | License Amendment Request 06-02 Revision to Technical Specification 5.6.5, Core Operating Limits Report (Colr). | |
ML053260105 | 21 November 2005 | 8 TS Pages - Diablo Canyon Unit 1 and 2, Issuance of Amendments 183/185 Revision to Technical Specifications 3.7.17 and 4.3 for a Temporary Cask Pit Spent Fuel Storage Rack for Cycles 14 to 16 | |
ML050870396 | 22 March 2005 | Technical Specification Pages Re Reporting Requirements | Shutdown Margin Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program |
DCL-05-018, License Amendment Request 05-01 Revision to Technical Specification 5.5.9, Steam Generator Tube Surveillance Program, and 5.6.10, Steam Generator Tube Inspection Report. to Allow Use of the W* Alternate Repair Criteria. | 11 March 2005 | License Amendment Request 05-01 Revision to Technical Specification 5.5.9, Steam Generator Tube Surveillance Program, and 5.6.10, Steam Generator Tube Inspection Report. to Allow Use of the W* Alternate Repair Criteria. | Non-Destructive Examination Hydrostatic Nondestructive Examination Finite Element Analysis Earthquake |
ML050750263 | 11 March 2005 | 1) TS Page - Diablo Canyon, Correction to Page Issued in Amendment Nos 179 and 181, Respectively | |
DCL-04-089, Response to June 14 and July 6, 2004, NRC Request for Additional Information Re License Amendment Request 03-18, Revision to Technical Specifications 5.5.9, 'Steam Generator (SG) Tube Surveillance Program,' & 5.6.10. | 30 July 2004 | Response to June 14 and July 6, 2004, NRC Request for Additional Information Re License Amendment Request 03-18, Revision to Technical Specifications 5.5.9, 'Steam Generator (SG) Tube Surveillance Program,' & 5.6.10. | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake Pressure Boundary Leakage Scaffolding |
DCL-04-037, Exigent License Amendment Request 04-02 Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. | 2 April 2004 | Exigent License Amendment Request 04-02 Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. | Shutdown Margin Anticipated operational occurrence |
DCL-04-013, License Amendment Request 03-17, Common Stars Amendment, Implementation of WCAP-14333 and WCAP-15376, RTS and ESFAS Test Times, Completion Times, and Surveillance Test Intervals | 13 February 2004 | License Amendment Request 03-17, Common Stars Amendment, Implementation of WCAP-14333 and WCAP-15376, RTS and ESFAS Test Times, Completion Times, and Surveillance Test Intervals | Anticipated operational occurrence Internal Flooding Probabilistic Risk Assessment Large early release frequency Earthquake Maintenance Rule Program |
DCL-04-008, Response to NRC Request for Additional Information Regarding License Amendment Request 03-02, Response Time Testing Elimination and Revision to Technical Specification 3.3.1. 'Reactor Trip System (RTS) Instrumentation'. | 23 January 2004 | Response to NRC Request for Additional Information Regarding License Amendment Request 03-02, Response Time Testing Elimination and Revision to Technical Specification 3.3.1. 'Reactor Trip System (RTS) Instrumentation'. | |
DCL-03-173, License Amendment Request 03-19 for Revision to Technical Specifications 3.3.3, Post-Accident Monitoring (PAM) Instrumentation and 3.6.8, Hydrogen Recombiners | 30 December 2003 | License Amendment Request 03-19 for Revision to Technical Specifications 3.3.3, Post-Accident Monitoring (PAM) Instrumentation and 3.6.8, Hydrogen Recombiners | Safe Shutdown Reactor Vessel Water Level Post Accident Monitoring Incorporated by reference Affidavit |
DCL-03-111, License Amendment Request 03-12 Revision to Technical Specifications 3.3.1, RTS Instrumentation, and 3.3.2, ESFAS Instrumentation, Enclosures 1 - 4 | 12 September 2003 | License Amendment Request 03-12 Revision to Technical Specifications 3.3.1, RTS Instrumentation, and 3.3.2, ESFAS Instrumentation, Enclosures 1 - 4 | Anticipated operational occurrence |
DCL-03-067, License Amendment Request 03-08 Revision to Technical Specification 3.5.1, Emergency Core Cooling Systems/Accumulator. | 5 June 2003 | License Amendment Request 03-08 Revision to Technical Specification 3.5.1, Emergency Core Cooling Systems/Accumulator. | Incorporated by reference |
DCL-02-097, License Amendment Request 02-05, Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation, & Revised Reactor Coolant System Flow Measurement | 27 August 2002 | License Amendment Request 02-05, Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation, & Revised Reactor Coolant System Flow Measurement | Fuel cladding |