Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22038A675 | 10 February 2022 | Acceptance of Omaha Public Power District'S License Amendment Request to Add a License Condition to Include License Termination Plan Requirements | |
ML21350A026 | 16 December 2021 | Acceptance Review of License Amend Req. to Add License Condition to Include License Termination Plan Requirements, Req. for Supplemental Info | |
ML17041A238 | 15 February 2017 | Acceptance Review Letter, Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E to Allow Plant to Reduce Emergency Planning Requirements Consistent with Permanently Defueled Condition | Exemption Request |
ML16007A385 | 15 January 2016 | Acceptance of Requested Licensing Action Following Supplement, Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements | |
ML15341A224 | 15 December 2015 | Supplemental Information Needed for Acceptance of Requested Licensing Action Revise Current Licensing Basis to Use American Concrete Institute (Aci) Ultimate Strength Requirements | Operating Basis Earthquake Nondestructive Examination |
ML14178B394 | 27 June 2014 | NRC Acceptance Review of Fort Calhoun License Amendment Request 14-03 | |
ML13267A177 | 24 September 2013 | Acceptance Review Email, License Amendment Request to Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood | |
ML13255A007 | 11 September 2013 | Exemption Request, Use of Less Restrictive Work Hour Limitations During First 60 Days of Outage, in Lieu of 10 CFR 26.205(d)(7) | Exemption Request |
ML13249A318 | 6 September 2013 | Acceptance Review Email, License Amendment Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis | |
ML12325A578 | 19 November 2012 | Acceptance Review Email, Request for One-Time Exemption from Requirements of 10 CFR 26.205(d)(7) to Allow Less Restrictive Working Hour Limitations to Support Activities for Plant Startup from Current Extended Outage | Exemption Request |
ML121580043 | 5 June 2012 | Acceptance Review Email, Amendment Request to Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan | |
ML121070652 | 16 April 2012 | Acceptance Review Email, Relocate Technical Specification Limiting Condition for Operation 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report | |
ML120830328 | 23 March 2012 | Email License Amendment Request to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits | |
ML120380231 | 7 February 2012 | Acceptance Review Email, License Amendment Request to Incorporate New Radial Peaking Factor Definition and Clarify Limiting Condition for Operation (LCO) 2.10.2(6) | |
ML113630083 | 29 December 2011 | Acceptance Review Email, License Amendment Request to Adopt National Fire Protection Standard NFPA -805 Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generation Plants, | |
ML112450130 | 2 September 2011 | Unit No.1 - Acceptance Review Email, Exemption Request from the Requirements of Appendix E, Sections IV.F.2.b and C of Section 50, Title 10 of the Code of Federal Regulations | Exemption Request |
ML110960529 | 6 April 2011 | Acceptance Review Email, License Amendment Request, Establish Ultimate Heat Sink LCOs in Technical Specification (TS) 2.16, River Level, and Add Surveillance Requirements to TS 3.2, Equipment and Sampling Tests. | Ultimate heat sink |
ML103400189 | 14 December 2010 | Acceptance Following Review of Supplemental Information, License Amendment Request to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications | |
ML102650013 | 21 September 2010 | Acceptance Review E-mail, Relief Request RR-12, from Requirements of ASME Code Case N-722 Visual Examination of Reactor Vessel Hot-Leg Nozzle to Safe End Dissimilar Metal Welds for 4th 10-Year Inservice Inspection Interval (ME4541) | Dissimilar Metal Weld |
ML102300676 | 18 August 2010 | Acceptance Review Email, License Amendment Request to Revise License Condition and Approve Cyber Security Plan | Cyber Security |
ML102240648 | 12 August 2010 | Acceptance Review E-mail, LAR Regarding Revision to (1) TS LCO 2.15, Table 2-5, Item 1, (2) TS 3.1, Table 3-3, Items 1, 2, and 4 Control Element Assembly Position Indication and (3) TS LCO 2.10.2(7)c | |
ML100470725 | 16 February 2010 | Acceptance Review Email, Request for Exemption from 10 CFR Part 73 Physical Security Requirements | Exemption Request |
ML093240240 | 20 November 2009 | Acceptance Review Email, Request for Use of Alternate to Depth Sizing Qualification for Volumetric Examinations of Reactor Pressure Vessel Welds | |
ML091830897 | 2 July 2009 | Acceptance Review Email, License Amendment Request, Revise Technical Specification (TS) 2.0.1 and 2.7 for Inoperable System, Subsystem or Component Due to Inoperable Power Source, Deletion of Diesel Generator SR 3.7(1)e | |
ML090580225 | 27 February 2009 | Acceptance Review Email, License Amendment Request to Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 | |
ML090540795 | 23 February 2009 | Acceptance Review Email, License Amendment Request, Modify Technical Specifications to Add Operability and Testing Requirements for Steam .Generator Blowdown Isolation on a Reactor Trip | |
ML083330106 | 26 November 2008 | Acceptance Review Email, License Amendment Request to Revise TS 3.6(3), Containment Recirculating Air Cooling and Filtering System and License Conditions Replacement of Cacf System |