ML102240648

From kanterella
Jump to navigation Jump to search

Acceptance Review E-mail, LAR Regarding Revision to (1) TS LCO 2.15, Table 2-5, Item 1, (2) TS 3.1, Table 3-3, Items 1, 2, and 4 Control Element Assembly Position Indication and (3) TS LCO 2.10.2(7)c
ML102240648
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/12/2010
From: Lynnea Wilkins
Plant Licensing Branch IV
To: Hansher B
Omaha Public Power District
Wilkins, L E, NRR/DORL/LPL4, 415-1377
References
TAC ME4230
Download: ML102240648 (3)


Text

From: Wilkins, Lynnea Sent: Thursday, August 12, 2010 4:19 PM To: HANSHER, BILL R Cc: Lent, Susan; Burkhardt, Janet; LIPPY, DONNA L

Subject:

Acceptance of LAR Regarding Revision to (1) TS LCO 2.15, Table 2-5, Item 1, (2) TS (SR) 3.1, Table 3-3, Items 1, 2, and 4 and (3) TS LCO 2.10.2(7)c

Bill, By letter dated July 12, 2010, Omaha Public Power District requested an amendment to the Facility Operating License for the Fort Calhoun Station, Unit No. 1 (FCS). This License Amendment Request (LAR) proposed to revise: (1) TS limiting condition for operation (LCO) 2.15, Table 2-5, Item 1, (2) TS Surveillance Requirement (SR) 3.1, Table 3-3, Items 1, 2, and 4 Control Element Assembly Position Indication and (3) TS LCO 2.10.2(7)c. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact the me, at (301) 415-1377.

Lynnea Wilkins, Project Manager Fort Calhoun Station, Unit 1 Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: 301-415-1377 E-mail Properties Mail Envelope Properties (F371D08C516DE74F81193E6D891DC4AF370BDD7625)

Subject:

Acceptance of LAR Regarding Revision to (1) TS LCO 2.15, Table 2-5, Item 1, (2) TS (SR) 3.1, Table 3-3, Items 1, 2, and 4 and (3) TS LCO 2.10.2(7)c Sent Date: 8/12/2010 4:19:24 PM Received Date: 8/12/2010 4:19:24 PM From: Wilkins, Lynnea Created By: Lynnea.Wilkins@nrc.gov Recipients:

bhansher@oppd.com (HANSHER, BILL R)

Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)

Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)

Tracking Status: None dllippy@oppd.com (LIPPY, DONNA L)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 10242 8/12/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: True Return Notification: False

Sensitivity: olNormal Recipients received: