Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21077A13618 March 2021Temporary Instruction 2515/194 Inspection Documentation RequestOpen Phase Condition
Time Critical Operator Action
ML19011A1714 January 2019Enclosures 1 to 3 - EAL Scheme Revisions Enclosure Summary, Discussion of Change and Mps EAL Scheme Revisions-Supporting DocumentsBoric Acid
High winds
Shutdown Margin
Reactor Vessel Water Level
Reserve Station Service Transformer
Operating Basis Earthquake
FLEX
Earthquake
Fuel cladding
ML16266A54621 December 2016Summary of Results of Flooding Hazard Reevaluation Report for Millstone Power Station Units 2 and 3
ML15231A36427 May 2015FOIA/PA-2014-0204 - Resp 1 - Final, Group a
ML15065A2386 February 2015Acord Certificate of Liability Insurance
ML14358A31822 December 2014FOIA/PA-2014-0508 - Resp 1 - Partial. Group a (Records Being Released in Their Entirety)Boric Acid
High winds
Stroke time
Past operability
Enforcement Discretion
Operator Manual Action
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
Preliminary White Finding
Loctite
ML14128A04130 April 2014Attachment 2 - 2013 Radioactive Effluent Release Report - Volume 2Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radiological Environmental Operating Report
Power change
ML14041A1786 February 2014Attachment 1 - Response to Request for Additional Information for Alternative Request IR-3-17, for ASME Section XI for Repair/Replacement of Class 3 Service Water System ValvesHydrostatic
ML14041A1796 February 2014Attachment 3 - Examination of Millstone Unit 3 Service Water Valves for DealloyingThrough-Wall Leak
ML13364A28330 December 2013Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013Generic Fundamentals Examination
ML12093A0832 April 2012Notice of Public Meeting - April 19, 2012Open House
ML12056A05212 March 2012Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status
ML12032A22525 January 2012Attachments 4-6 to 11-687, Regarding License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3Boric Acid
Shutdown Margin
Ultimate heat sink
Stroke time
Surveillance Frequency Control Program
Offsite Circuit
Power change
Unidentified leakage
ML11234050521 August 2011Verbal Authorization, Relief Request RR-04-12, of Millstone 2 Temporary Non-Code Compliant Condition of Emergency Diesel Generator Supply Piping in the Service Water System
ML11234046420 August 2011MPS2 RR RAI ResponseMission time
Coatings
Scaffolding
ML11175021922 June 2011NRC Inspection Findings Related to Closed Cooling Water Systems (1/1/2004 to 6/22/2011)Condition Adverse to Quality
Significance Determination Process
ML10347065013 December 2010Millstone 3 Draft Response to GL2004-02 RAI No. 6Coatings
ML1015305562 June 2010Mps GL-04-002 Draft RAI Responses/Public Telecon HandoutsCoatings
ML10119041722 April 2010Westinghouse Electric Co., LLC, LTR-SGMP-10-50 NP-Attachment Assessment of the Effect of the Location of the Bottom of the Expansion Transition on H.
ML1009804158 April 2010Draft Millstone GL2004-02 Supplemental Responses to Support Public Teleconference on 4/08
ML10193046025 March 2010List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants
ML09335075114 January 2010Temporary Instruction 2515/180, Managing Fatigue
ML08130069017 April 2008Meeting with Neac to Discuss Millstone, Attendance List
ML08130068717 April 2008Annual Assessment Meeting Attendance List
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ML07295024010 October 2007Siren Milestones
ML0730400301 October 2007Sign-In Roster for Public Meeting with Dominion Nuclear
ML07263011414 September 2007/ P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170
ML07263031914 September 2007P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List
ML07131023912 April 2007Enclosure 6: List of Proposed Generic Level 1 Milestones
ML06347059914 December 2006Plant Service List
ML07018059926 July 2006Report of Investigation, Case 1-2006-004, Millstone Nuclear Power Plant, Units 2 and 3: Discrimination Against a Senior ECP Investigator for Having Engaged in Protected ActivitiesCondition Adverse to Quality
ML06107049817 April 2006PI&R Team Inspection Required DocumentsTemporary Modification
ML06227006429 March 2006Statement of Attorney General Richard Blumenthal of Connecticut Regarding the NRC Annual Safety Assessment Public Meeting at Millstone Nuclear Power Station March 29, 2006
ML06143015229 March 2006Sign-in Sheet for Public Meeting Between NRC and Connecticut Nuclear Energy Advisory Council (Neac) to Discuss Millstone Station'S Annual Assessment for CY2005
ML05270004421 September 2005Attachment 10, FAQ Log 9/21/05Ultimate heat sink
Mission time
Post Accident Monitoring
Coatings
Large early release frequency
Exemption Request
ML05146023720 May 2005Event Response Roster
ML05145051320 May 2005Branch 6, Management Directive 8.3 Check Sheet for 3/6/04 Millstone Unit 2 Turbine Trip
ML05145051720 May 2005Branch 6, Management Directive 8.3 Check Sheet for 3/15/04 Millstone Unit 2 Turbine Trip
ML05146022320 May 2005Region I Event ChronologyPacking leak
Minimum staff
ML05146023620 May 2005Region I Event ChronologyPacking leak
Minimum staff
ML05146026020 May 2005Handwritten Notes - 7
ML05160005918 May 2005Attendance Sign in Sheet for Public Meeting Between NRC and Nuclear Energy Advisory Council (Neac) Ref: April 17, 2005 Event
ML0513005595 May 2005Enclosure 5, Response to Requests for Additional Information Replacement Discussion of ChangesCommercial Grade Dedication
Coatings
Nondestructive Examination
Grace period
ML0513005565 May 2005Enclosure 4, Response to Requests for Additional Information Marked Up Discussion of ChangesCommercial Grade Dedication
Coatings
Nondestructive Examination
Grace period
ML0513005445 May 2005Attachment 2, Response to Requests for Additional Information Re Proposed Technical Specifications Changes Associated with Nuclear Facility Quality Assurance Program Description
ML0513005395 May 2005Attachment 1, Response to Requests for Additional Information on Nuclear Facility Quality Assurance Program Description
ML05146022219 April 2005Forced Outage Schedule, Cold ShutdownStroke time
ML05146026817 April 2005Notes from 04/17/2005 Millstone 3 Alert
ML05146027417 April 2005Unit 3 Control Room OPS