Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22278A296 | 5 October 2022 | FAQ 22-02- Diablo Canyon Scram - Final Approved | |
ML22276A240 | 3 October 2022 | 1) FAQ Response Provided by NEI | |
ML22179A030 | 22 June 2022 | Plants 1 and 2 - Response to Public Questions Regarding Unit 1 Reactor Vessel Neutron Embrittlement Coupon Testing - June 28, 2022 | |
ML22166A444 | 15 June 2022 | Plants 1 and 2 - Response to Public Questions Regarding Unit 1 Reactor Vessel Neutron Embrittlement Coupon Testing - June 15, 2022 | |
ML22206A260 | 23 May 2022 | FAQ 22-02- Diablo Canyon Scram - Proposed | |
ML22144A144 | 23 May 2022 | FAQ 22-02 - Diablo Canyon Scram | |
ML21060B184 | 1 March 2021 | Enclosure 1 - 1-26-21 Diablo Canyon Renewal pre-app Meeting Attendee List | |
ML20141L710 | 14 May 2020 | NRC-2019-000279 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed. (Released Set of 2014-0488 3, Part 2 of 2) | |
ML20141L709 | 14 May 2020 | NRC-2019-000279 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed. (Released Set of 2014-0488 3, Part 1 of 2) | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Functionality Assessment FLEX Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation Non-Concurrence Process Earthquake Backfit |
ML20141L714 | 14 May 2020 | NRC-2019-000279 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed. (Released Set of 2014-0488 5, Part 2 of 2) | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Functionality Assessment FLEX Fukushima Dai-Ichi Significance Determination Process Design basis earthquake Spent Fuel Pool Instrumentation Non-Concurrence Process Earthquake Stuck Shutter |
ML20141L715 | 14 May 2020 | NRC-2019-000279 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed. (Released Set of 2014-0488, Parts 1 and 2) | Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Non-Concurrence Process Earthquake Downpower |
ML20141L716 | 14 May 2020 | NRC-2019-000279 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed. (Released Set of 2015-0071, Part 1 of 2) | |
ML20141L713 | 14 May 2020 | NRC-2019-000279 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed. (Released Set of 2014-0488 5, Part 1 of 2) | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Functionality Assessment Fukushima Dai-Ichi Significance Determination Process Non-Concurrence Process Earthquake |
ML20141L712 | 14 May 2020 | NRC-2019-000279 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed. (Released Set of 2014-0488 4, Part 2 of 2) | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Functionality Assessment FLEX Fukushima Dai-Ichi Significance Determination Process Design basis earthquake Spent Fuel Pool Instrumentation Non-Concurrence Process Earthquake |
ML20141L711 | 14 May 2020 | NRC-2019-000279 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed. (Released Set of 2014-0488 4, Part 1 of 2) | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Functionality Assessment FLEX Fukushima Dai-Ichi Significance Determination Process Design basis earthquake Spent Fuel Pool Instrumentation Earthquake Backfit |
ML20141L717 | 14 May 2020 | NRC-2019-000279 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed. (Released Set of 2015-0071, Part 2 of 2) | Unanalyzed Condition Safe Shutdown Earthquake Probabilistic Risk Assessment Functionality Assessment Fukushima Dai-Ichi Open House Non-Concurrence Process Earthquake |
ML20141L718 | 14 May 2020 | NRC-2019-000279 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed. Released Set of New OE Docs (for NRC-2019-000279 Item 2) | Safe Shutdown Earthquake Non-Concurrence Process Earthquake |
ML20262G968 | 19 March 2020 | Health Order 3.19.2020 | Coronavirus |
ML16314A964 | 9 November 2016 | Summary of Hydrodynamic Effect in Spent Fuel Pool Auxiliary Building | |
ML16314A973 | 9 November 2016 | Pacific Gas and Electric Company Checking Columns in Auxiliary Building Unit 1 for 7.5M Hosgri Vertical Acceleration | |
ML16314D316 | 9 November 2016 | Comment Sheets | |
ML16285A323 | 12 October 2016 | ROP PI Frequently Asked Questions (Faqs): 13-07 | Earthquake Grace period |
ML16179A219 | 27 June 2016 | LTR-16-0333-1 - Oedo Ticket - Edward D. Halpin, Senior Vice President, Generation and Chief Nuclear Officer, Pacific Gas and Electric Company, Letter Request to Suspend NRC Review of Diablo Canyon Power Plant License Renewal Application | |
ML16084A610 | 30 March 2016 | MSFHI Tables 1&2 Final 3-24-2016 | |
ML16054A009 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 8 of 8 | Probabilistic Risk Assessment FLEX Earthquake |
ML16054A007 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Final Response #2, Records Already Publicly Available | Fukushima Dai-Ichi Non-Concurrence Process |
ML16054A011 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 3 of 8 | Earthquake |
ML16054A014 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 6 of 8 | Safe Shutdown Unanalyzed Condition Boric Acid Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX Design basis earthquake Open House Earthquake Backfit Weak link |
ML16054A008 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 1 of 8 | Safe Shutdown Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Design basis earthquake Open House Earthquake Backfit |
ML16054A015 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 7 of 8 | Earthquake |
ML16054A010 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 2 of 8 | Earthquake Backfit |
ML16054A012 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 4 of 8 | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Design basis earthquake Earthquake Backfit |
ML16054A013 | 12 February 2016 | FOIA/PA-2015-0294 - Resp 2 - Final, Agency Records Subject to the Request Are Enclosed. Part 5 of 8 | |
ML15344A432 | 12 January 2016 | DCPP Section 106 Checklist | |
ML15237A335 | 21 August 2015 | Attachment 3 - A.15-02-023 Supplemental Testimony of John Geesman | Earthquake |
ML15237A334 | 14 July 2015 | Attachment 1 - A.15-02-023 Prepared Testimony of John Geesman | Anticipated operational occurrence Probabilistic Risk Assessment Earthquake |
ML15237A323 | 14 July 2015 | Attachment 2 - A.15-02-023 Prepared Testimony of Sam Blakeslee | Earthquake |
ML15070A608 | 11 March 2015 | Response to NRC Request for Info. Pursuant to 10 CFR 50.54(f) Seismic Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident: Seismic Hazard Screening Report. Part 2 of 2 | Safe Shutdown Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
DCL-15-034, Final Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 Flooding. Part 2 of 2 | 11 March 2015 | Final Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 Flooding. Part 2 of 2 | Hydrostatic Fukushima Dai-Ichi Earthquake |
ML15014A160 | 14 January 2015 | Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process | |
ML15014A153 | 14 January 2015 | Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process | |
ML14349A387 | 11 December 2014 | FOIA/PA-2014-0059 - Resp 2 - Final. Group C (Records Being Released in Part) | Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Cyber Security FLEX Fukushima Dai-Ichi Design basis earthquake Open House Earthquake Fire Protection Program |
ML14302A806 | 29 October 2014 | Enclosure - Ninety-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805 | Hot Short Safe Shutdown Boric Acid Mission time Fire Barrier Internal Flooding Probabilistic Risk Assessment Thermoset Large early release frequency Fire Protection Program |
ML13130A228 | 10 May 2013 | Safety Injection Issue Summary Pump 2-1 Issue Information | |
DCL-13-021, Performance Demonstration Initiative (POI) Program Alternatives and Their Bases with Respect to ASME Code Section Xi, Appendix Viii Supplement 11 Requirements | 5 March 2013 | Performance Demonstration Initiative (POI) Program Alternatives and Their Bases with Respect to ASME Code Section Xi, Appendix Viii Supplement 11 Requirements | Weld Overlay |
ML13078A297 | 5 March 2013 | Enclosure 1, Inservice Inspection (ISI) Relief Request REP-1 U2, Revision 2 in Accordance with 10 CFR 50.55a(a)(3)(i) | Weld Overlay Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML13078A293 | 5 March 2013 | Performance Demonstration Initiative (POI) Program Alternatives and Their Bases with Respect to ASME Code Section Xi, Appendix Viii Supplement 11 Requirements | Weld Overlay |
DCL-12-119, Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 Seismic Unit 2, Part 2 of 3 | 27 November 2012 | Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 Seismic Unit 2, Part 2 of 3 | |
ML12333A269 | 27 November 2012 | Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 Seismic Unit 2, Part 3 of 3 | |
ML12333A266 | 27 November 2012 | Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 Seismic Unit 1. Part 2 of 2 |