Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22006A0963 January 2022Comment (157) E-mail Regarding Point Beach Draft SEISSafe Shutdown
NJPDES
Incorporated by reference
Aging Management
License Renewal
Subsequent License Renewal
Turbine Missile
Power Uprate
Overspeed trip
ML22004A3783 January 2022Comment (46) of Kevin Kamps on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2Safe Shutdown
NJPDES
Incorporated by reference
Aging Management
License Renewal
Subsequent License Renewal
Turbine Missile
Power Uprate
Overspeed trip
ML22004A3773 January 2022Comment (45) of Ann Behrmann on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement Nexteraenergy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2License Renewal
Subsequent License Renewal
Turbine Missile
COVID-19
Environmental Justice
Siren
ML21257A24014 September 2021NextEra Energy Point Beach, Llc'S Brief in Opposition to Physicians for Social Responsibility Wisconsin'S Appeal of LBP-21-05Aging Management
ML21195A05214 July 2021Order (Adopting Transcript Corrections)Subsequent License Renewal
ML21176A13622 June 2021Transcript of June 22, 2021 Teleconference of Oral ArgumentsAging Management
License Renewal
Subsequent License Renewal
Turbine Missile
Environment Report
Power Uprate
L-2021-116, Subsequent License Renewal Application Environmental Report Review Requests for Confirmation Of/Additional Information (Rci/Ral) Set Response10 June 2021Subsequent License Renewal Application Environmental Report Review Requests for Confirmation Of/Additional Information (Rci/Ral) Set ResponseZebra Mussel
Frazil ice
ML21109A13319 April 2021NextEra Energy Point Beach, Llc'S Answer Opposing the Physicians for Social Responsibility Wisconsin'S Petition for Leave to Intervene and Request for HearingIncorporated by reference
Aging Management
License Renewal
Subsequent License Renewal
Turbine Missile
Power Uprate
Affidavit
Overspeed trip
NRC-2021-0009, Update to Final Safety Analysis Report, Chapter 2, Site and Environment2 April 2021Update to Final Safety Analysis Report, Chapter 2, Site and EnvironmentHigh winds
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Operating Basis Earthquake
Zebra Mussel
Earthquake
ML21082A53023 March 2021Petition of Physicians for Social Responsibility Wisconsin for Leave to Intervene in Point Beach Nuclear Plant, Units 1 and 2 Subsequent License Renewal Proceeding, and Requesting an Adjudicatory HearingSafe Shutdown
NJPDES
Aging Management
License Renewal
Subsequent License Renewal
Turbine Missile
Power Uprate
Affidavit
Overspeed trip
ML16251A1521 September 2016Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 2 - Site and EnvironmentHigh winds
Zebra Mussel
Earthquake
NRC 2016-0034, Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 2 - Site and Environment1 September 2016Point Beach Nuclear Plant, Units 1 and 2, Periodic Update of the Final Safety Analysis Report (Fsar), Chapter 2 - Site and EnvironmentHigh winds
Zebra Mussel
Earthquake
ML10134010313 May 2010License Amendment Request 261 Extended Power Uprate, Response to Request for Additional InformationGrab sample
NJPDES
Zebra Mussel
Frazil ice
Veliger
Biofouling
ML05095013524 December 2004Proposal for Information Collection-Cooling Water Intake StructureZebra Mussel
Frazil ice
Biofouling
ML04322008315 January 2004Fish and Bird Report for Period January 1. 2003 Through December 31. 2003
IR 05000266/20020152 April 2003IR 05000266-02-015 (Drp); IR 05000301-02-015 (Drp), on 9/23 -26/2002 and 10/31/2002 - 3/24/2003, Nuclear Management Company, LLC; Point Beach Nuclear Plant, Unit 1 and Unit 2. Special Inspections to Evaluate a Red Inspection FindingSafe Shutdown
Mission time
Probabilistic Risk Assessment
Zebra Mussel
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Earthquake
Biofouling
ML20085M61011 November 1991Response to NUMARC Survey Re Waste Mgt,Aquatic Resource & Socioeconomic Questions in Support of NRC License Renewal RulemakingFrazil ice
License Renewal
ML20080S78830 June 1982Rev 2 to Environ Monitoring Manual
ML19269E95622 August 1979Responds to NRC 790622 Request for Additional Info Re Changes to Nonradiological Environ Surveillance Program for Facility.W/Two Oversize DrawingsFrazil ice
ML20150A66121 September 1978Tech Spec Change Request 55 to Appendix B of Non- Radiological Tech Spec for Oper Lic DPR-24 & DPR-27.Deletes Monitoring Requirement to Maintain Records for & Rept Fish Bills Based on 5-year Oper Rept Data.Class III Amend