SVPLTR 11-0041, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 10

From kanterella
Jump to navigation Jump to search
Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 10
ML11290A204
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 10/11/2011
From: Czufin D
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SVPLTR 11-0041
Download: ML11290A204 (3)


Text

SAFEGUARDS INFORMATION Exelon Generation Company, LLC www~exelonicorp.com Exeklon Dresden Nuclear Power Station Nuclear 65oo North Dresden Road Morris, IL 60450-9765 10 CFR 50.54(p)(2) 10 CFR 50.4(b)(4)

SVPLTR 11-0041 October 11,2011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249

Subject:

Dresden Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 10 In accordance with 10 CFR 50.54, "Conditions of liscenses," paragraph (p)(2), Exelon Generation Company, LLC (EGC) is submitting Revision 10 to the Dresden Station Security Plan. Changes to this Document were implemented on September 15, 2011. In accordance with 10 CFR 50.54(p)(2), EGC is submitting these changes within 60 days of implementation.

The Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan has been revised to:

1. Identify on attachment drawings changes made to OCA Barrier configurations.
2. Change the referenced procedure number for the Supplemental Safeguards Contingency Plan.

EGC has concluded that the do not decrease the safeguards effectiveness of the Dresden Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan.

Attachments 1 and 2 contain safeguards information. Therefore, EGC requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (d)(1), and 10 CFR 73.22, "Protection of Safeguards Information: Specific Requirements," paragraph (a)(1)(i).

SAFEGUARDS INFORMATION ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

,Sco

SAFEGUARDS INFORMATION October 11,2011 U.S. Nuclear Regulatory Commission Page 2 There are no commitments in this letter.

Should you have any questions concerning this letter, please contact Mr. Darren O'Flanagan at (815) 416-2900.

Respectfully, David Czufi SVP Dresden uclear Power Station Attachments:

1. Dresden Station, Description of Changes Report, Revision 10 (Contains Safeguards Information)
2. Dresden Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 10 (Contains Safeguards Information) cc: Regional Administrator - NRC Region III SAFEGUARDS INFORMATION ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION bcc: NRC Project Manager, NRR - Dresden Station (without attachments)

Director - Licensing and Regulatory Affairs - West (without attachments)

Licensing Engineer - West (without attachments)

Illinois Emergency Management Agency - division of Nuclear Safety (without attachments)

Exelon Document Control Desk - Licensing (without attachments)

Commitment Tracking Coordinator - West (without attachments)

Regulatory Assurance Specialist - (without attachments)

C. Kelley - Cantera (without attachments)

D. Pallansch - Cantera (without attachments)

SVPLTR File (without attachments)

RA Letter File (without attachments)

SAFEGUARDS INFORMATION ATTACHMENTS 1 AND 2 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED