MONTHYEARSVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 SVPLTR 23-0021, Registration of Use of Casks to Store Spent Fuel2023-06-20020 June 2023 Registration of Use of Casks to Store Spent Fuel SVPLTR 23-0018, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) SVPLTR 23-0014, Annual Dose Report for 20222023-04-15015 April 2023 Annual Dose Report for 2022 SVPLTR 23-0004, Owner'S Activity Report Submittal Dresden Nuclear Power Station 6500 North Dresden Road Morris, Il 60450 Fifth 10-Year Interval 2022 Refueling Outage Activities2023-02-10010 February 2023 Owner'S Activity Report Submittal Dresden Nuclear Power Station 6500 North Dresden Road Morris, Il 60450 Fifth 10-Year Interval 2022 Refueling Outage Activities SVPLTR 22-0037, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2022-09-0707 September 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 22-0024, Registration of Use of Casks to Store Spent Fuel2022-06-16016 June 2022 Registration of Use of Casks to Store Spent Fuel SVPLTR 22-0016, Unit 3, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 2 and Unit 3 Shroud Vertical Welds2022-06-0808 June 2022 Unit 3, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 2 and Unit 3 Shroud Vertical Welds SVPLTR 22-0017, Registration of Use of Casks to Store Spent Fuel2022-05-25025 May 2022 Registration of Use of Casks to Store Spent Fuel SVPLTR 21-0061, Core Operating Limits Report for Dresden Unit 2 Cycle 282021-11-19019 November 2021 Core Operating Limits Report for Dresden Unit 2 Cycle 28 SVPLTR 21-0057, Submittal of 10 CFR 72.48 Evaluation Summary Report2021-10-15015 October 2021 Submittal of 10 CFR 72.48 Evaluation Summary Report SVPLTR 21-0030, Registration of Use of Casks to Store Spent Fuel2021-06-0202 June 2021 Registration of Use of Casks to Store Spent Fuel SVPLTR 21-0028, 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 2020 Annual Radiological Environmental Operating Report SVPLTR 21-0027, Radioactive Effluent Release Report and Offsite Dose Calculation Manual2021-04-22022 April 2021 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 21-0005, Submittal of Analytical Evaluation of Isolation Condenser Nozzle to Shell Weld Flaw Indications (ISI Weld 3/2/1302A-12/12-8)2021-01-29029 January 2021 Submittal of Analytical Evaluation of Isolation Condenser Nozzle to Shell Weld Flaw Indications (ISI Weld 3/2/1302A-12/12-8) SVPLTR 20-0053, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 3 Top Guide Rim Weld2020-10-15015 October 2020 Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 3 Top Guide Rim Weld SVPLTR 20-0045, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-09-0101 September 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 20-0037, Response to Apparent Violation in NRC Inspection Report 05000237/2020012 and 05000249/2020012; EA-20-0532020-07-0202 July 2020 Response to Apparent Violation in NRC Inspection Report 05000237/2020012 and 05000249/2020012; EA-20-053 SVPLTR 20-0027, Registration of Use of Casks to Store Spent Fuel2020-05-14014 May 2020 Registration of Use of Casks to Store Spent Fuel SVPLTR 20-0014, Submittal of 2019 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2020-04-21021 April 2020 Submittal of 2019 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 20-0010, Fifth 10-Year Interval 2019 Refueling Outage Activities2020-02-13013 February 2020 Fifth 10-Year Interval 2019 Refueling Outage Activities SVPLTR 19-0049, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-09-10010 September 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 19-0031, Registration of Use of Casks to Store Spent Fuel2019-06-14014 June 2019 Registration of Use of Casks to Store Spent Fuel SVPLTR 19-0020, Submittal of 2018 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2019-04-19019 April 2019 Submittal of 2018 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 19-0005, Owner'S Activity Report Submittal Fifth 10-Year Interval 2018 Refueling Outage Activities2019-02-0808 February 2019 Owner'S Activity Report Submittal Fifth 10-Year Interval 2018 Refueling Outage Activities SVPLTR 18-0025, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-08-15015 August 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 18-0020, Corrected 2017 Radioactive Effluent Release Report2018-06-28028 June 2018 Corrected 2017 Radioactive Effluent Release Report SVPLTR 18-0018, Registration of Use of Casks to Store Spent Fuel2018-06-14014 June 2018 Registration of Use of Casks to Store Spent Fuel SVPLTR 18-0012, Submittal of 2017 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2018-04-24024 April 2018 Submittal of 2017 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 18-0007, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revisions 17 and 182018-03-0101 March 2018 Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revisions 17 and 18 SVPLTR 17-0033, Submittal of Corrected 2016 Radioactive Effluent Release Report for January Through December2017-08-29029 August 2017 Submittal of Corrected 2016 Radioactive Effluent Release Report for January Through December SVPLTR 17-0026, Registration of Use of Casks to Store Spent Fuel2017-06-0606 June 2017 Registration of Use of Casks to Store Spent Fuel SVPLTR 17-0017, Submittal of 2016 Radioactive Effluent Release Report2017-04-26026 April 2017 Submittal of 2016 Radioactive Effluent Release Report SVPLTR 16-0027, 2016 Dresden Nuclear Station Initial License Examination Proposed Exam Files - Licensee Letter Transmitting the Proposed Examination/Test to the NRC2016-12-0101 December 2016 2016 Dresden Nuclear Station Initial License Examination Proposed Exam Files - Licensee Letter Transmitting the Proposed Examination/Test to the NRC SVPLTR 16-0061, Core Operating Limits Report for Unit 3 Cycle 252016-11-21021 November 2016 Core Operating Limits Report for Unit 3 Cycle 25 SVPLTR 16-0018, Transmittal of 2015 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2016-04-25025 April 2016 Transmittal of 2015 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 16-0017, Submittal of Post Accident Monitoring Report Instrumentation2016-04-0808 April 2016 Submittal of Post Accident Monitoring Report Instrumentation SVPLTR 16-0001, Cyber-Security Ms 1 Thru 7 Inspection 2014 405; Notification of Completion of Corrective Actions2016-01-21021 January 2016 Cyber-Security Ms 1 Thru 7 Inspection 2014 405; Notification of Completion of Corrective Actions SVPLTR 15-0070, Core Operating Limits Report for Cycle 24A2015-12-15015 December 2015 Core Operating Limits Report for Cycle 24A SVPLTR 15-0065, Core Operating Limits Report for Cycle 252015-11-16016 November 2015 Core Operating Limits Report for Cycle 25 SVPLTR 15-0059, Core Operating Limits Report, Cycle 242015-10-25025 October 2015 Core Operating Limits Report, Cycle 24 SVPLTR 15-0056, 1, 2 and 3 - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2015-09-0404 September 2015 1, 2 and 3 - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 15-0055, Notification of Readiness for NRC 95001 Inspection2015-08-25025 August 2015 Notification of Readiness for NRC 95001 Inspection SVPLTR 15-0052, Response to Preliminary White Finding2015-08-14014 August 2015 Response to Preliminary White Finding SVPLTR 15-0046, ISFSI - Registration of Use of Casks to Store Spent Fuel2015-07-17017 July 2015 ISFSI - Registration of Use of Casks to Store Spent Fuel SVPLTR 15-0043, Registration of Use of Casks to Store Spent Fuel2015-06-12012 June 2015 Registration of Use of Casks to Store Spent Fuel SVPLTR 15-0034, 2014 Annual Radiological Environmental Operating Report2015-05-14014 May 2015 2014 Annual Radiological Environmental Operating Report SVPLTR 15-0020, Written Position on Preliminary White Finding Discussed in NRC Inspection Report 05000237/2014005; 05000249/20140052015-03-0202 March 2015 Written Position on Preliminary White Finding Discussed in NRC Inspection Report 05000237/2014005; 05000249/2014005 SVPLTR 15-0014, Owner'S Activity Report Submittal Fifth 10-Year Interval 2014 Refueling Outage Activities2015-02-11011 February 2015 Owner'S Activity Report Submittal Fifth 10-Year Interval 2014 Refueling Outage Activities 2023-06-20
[Table view] |
Text
Exelon.
Exelon Generation Company, LLC www.exeloncorp.com NuClear Dresden Nuclear Power Station 6500 North Dresden Road Morris, IL 60450-9765 SVPLTR: #09-0053 10CFR.54 November 12, 2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington D.C. 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249
Subject:
Revised License Renewal Commitment for Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS) Reactor Internal Components
References:
(1) Letter (RS-03-181) from Mr. Patrick R. Simpson (Exelon Generation Company, LLC), to the NRC, "Additional Information for the Review of the License Renewal Applications for Quad Cities Nuclear Power Station, Units 1 and 2 and Dresden Nuclear Power Station, Units 2 and 3," dated October 3, 2003 (2) NUREG 1796, "Safety Evaluation Report Related to the License Renewal of the Dresden Nuclear Power Station, Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2" The purpose of this letter is to inform the NRC that Exelon Generation Company, LLC (EGC) is revising a commitment identified in References (1) and (2) for Dresden Nuclear Power Station (DNPS).
In Reference (1), as a part of EGC's license renewal application for DNPS, and as documented in reference 2, Appendix A, EGC made the following commitment:
An aging management program will be implemented for thermal aging and neutron irradiation embrittlement of Cast Austenitic Stainless Steel (CASS) reactor internal components within the scope of license renewal. A component specific evaluation for the loss of fracture toughness will be included. For those components where the loss of fracture toughness may affect the function of the component, an inspection will be performed as part of the ISI Program.
The commitment included an evaluation that requires the material composition be obtained from certified material test reports (CMTRs). The CMTRs could not be located for the components in question. The purpose of the commitment is to determine the CASS components where a loss of fracture toughness may affect the function of the component and to establish an inspection program for those susceptible components.
The inability to determine material composition from CMTRs affects the ability for EGC to evaluate CASS components for a loss of fracture toughness. Therefore, EGC conservatively assumed that
,/091
November 12, 2009 U.S. Nuclear Regulatory Commission Page 2 of 2 all the components were susceptible and established an inspection program for these components, the same as would be required by the original commitment if an evaluation had concluded there was a loss of fracture toughness that may affect the function of the component.
As a result of the above, EGC is revising Commitment number 10 as documented in Appendix A to Reference 2. The revised commitment is included as Attachment 1 to this letter.
Should you have any questions concerning this letter, please contact Ms. Marri Marchionda at 815-416-2800.
Respectfully, Tim Hanley Site Vice President Dresden Nuclear Power Station
Attachment:
Summary of Regulatory Commitments cc: Regional Administrator - NRC Region III NRC Senior Resident Inspector - Dresden Nuclear Power Station
Attachment 1
SUMMARY
OF REGULATORY COMMITMENTS The following table identifies commitments made in this document. (Any other actions discussed in the document represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.)
COMMIu-ED _________ COMMITMENT TYPE ___
COMMITMENT DATE OR ONE-TIME ACTION PROGRAMMATIC (Yes/No)
(Yes/No)
An aging management program will be 12/20/2009 No Yes implemented for thermal aging and neutron irradiation embrittlement of Cast Austenitic Stainless Steel (CASS) reactor internal components within the scope of license renewal.
A component specific evaluation for the loss of fracture toughness will be included. If material composition cannot be determined, a loss of fracture toughness may be assumed as an alternative to a specific evaluation. For those components where it is assumed or the evaluation has determined a loss of fracture toughness may affect the function of the component, an inspection will be performed as part of the ISI Program