SBK-L-07074, Submittal of 2006 Annual Radioactive Effluent Release Report

From kanterella
Jump to navigation Jump to search
Submittal of 2006 Annual Radioactive Effluent Release Report
ML071220458
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/27/2007
From: St.Pierre G
Florida Power & Light Energy Seabrook
To:
Document Control Desk, NRC/NRR/ADRO
References
FOIA/PA-2010-0209, SBK-L-07074
Download: ML071220458 (2)


Text

o I=PL :nergy FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 Seabrook Station (603) 773-7000 April 27, 2007 Docket No. 50-443 SBK-L-07074 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555-0001 Seabrook Station 2006 Annual Radioactive Effluent Release Report Pursuant to 10CFR 50.36(a)(2) and Technical Specification 6.8.1.4, FPL Energy Seabrook, LLC submits the Annual Radioactive Effluent Release Report for 2006. A copy of the Offsite Dose Calculation Manual (ODCM) is also provided pursuant to Technical Specification 6.13.c. A summary of the changes to the ODCM is included in Enclosure 1, Appendix A.

The following information is provided in the enclosures:

Enclosure 1 Effluent release data as required by Regulatory Guide 1.21 Enclosure 2 Joint frequency distributions of wind speed, wind direction and atmospheric stability Enclosure 3 Radiation dose assessment Enclosure 4 Offsite Dose Calculation Manual (ODCM), Revision 30 Should you have any questions regarding this letter, please contact Peter J. Harvey, Chemistry Department Manager, at (603) 773-7320.

Very truly yours, FPL Energy Seabrook, LLC Gene St. Pierre Site Vice President 400cy an FPL Group company

U.S. Nuclear Regulatory Commission SBK-L-07074/ Page 2 cc: S.J. Collins, NRC Region I Administrator G.E. Miller, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector Robert A. Oliveira, ANI