RS-19-020, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station

From kanterella
(Redirected from RS-19-020)
Jump to navigation Jump to search
Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station
ML19066A286
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/07/2019
From: Gullott D
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-19-020
Download: ML19066A286 (7)


Text

4300 Winfielcl Road Exelon Generation Warrenvilie. IL 6055 5 630 657 2000 Ofiice RS-19-020 10 CFR 50.46 March 7, 2019 U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374

Subject:

Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station

References:

1. Letter from D. M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission , "Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station ," dated March 7, 2018
2. Letter from D. M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission , "Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station," dated March 7, 2017
3. Letter from D. M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission , "Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station," dated March 7, 2016
4. Letter from D. M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission , "Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station ," dated March 6, 2015 In accordance with 10 CFR 50.46, "Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors," paragraph (a)(3)(ii), Exelon Generation Company, LLC (EGC) is submitting the attached information to fulfill the annual reporting requirements for LaSalle County Station (LSCS), Units 1 and 2. The attachments describe the changes in accumulated peak cladding temperature (PCT) since the previous annual report submitted in Reference 1.

References 1 through 4 contain an Analyses of Record, "Technical Evaluation to Support Introduction of GNF3 Lead Use Assemblies (LUAs) in LaSalle County Station, Unit 2," which is

March 7, 2019 U.S. Nuclear Regulatory Commission Page 2 dated November 2014. As stated in Attachment 1, this Analyses of Record is dated December 2014 rather than November 2014 stated in the four referenced letters.

There are no regulatory commitments contained in this submittal. Should you have any questions concerning this letter, please contact Mr. Jason Taken at (630) 657-3660.

Respectfully, David M. Gullatt Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments:

1) LaSalle County Station, Units 1 and 2 - 10 CFR 50.46 Report
2) LaSalle County Station, Units 1 and 2 - 10 CFR 50.46 Report Assessment Notes cc: NRC Regional Administrator, Region Ill NRC Senior Resident Inspector, LaSalle County Station Illinois Emergency Management Agency - Division of Nuclear Safety

ATTACHMENT 1 LaSalle County Station, Units 1 and 2 10 CFR 50.46 Report PLANT NAME: LaSalle County Station (LSCS), Units 1 & 2 ECCS EVALUATION MODEL: SAFER/PRIME LOCA REPORT REVISION DATE: March 7, 2019 CURRENT OPERATING CYCLES: L 1C18 and L2C17*

ANALYSES OF RECORD

1) General Electric Hitachi (GEH) Calculation 0000-0121-8990-RO, "LaSalle County Station GNF2 ECCS-LOCA Evaluation," GEH Nuclear Energy, January 2012
2) GNF Document Number 002N3086.1, "Technical Evaluation to Support Introduction of GNF3 Lead Use Assemblies (LUAs) in LaSalle County Station, Unit 2," Global Nuclear Fuel , December 2014 Fuel Types: GNF2, GNF3 LUAs Limiting Single Failure: High Pressure Core Spray Diesel Generator Failure Limiting Break Size & Location: Small Break (0.08 ft2) Recirculation Piping Suction Line Break Reference Peak Cladding Temperature (PCT): GNF2: 1540°F GNF3 LUAs: 1550°F
  • LSCS, Unit 2, is currently in refueling outage, LSCS , Unit 2 Reload 17 (L2R 17). Expected startup date for LSCS , Unit 2, Cycle 18 (L2C18) is targeted for March 9, 2019.

Page 1 of 2

ATTACHMENT 1 LaSalle County Station, Units 1 and 2 10 CFR 50.46 Report MARGIN ALLOCATION A. PRIOR LOSS-OF-COOLANT ACCIDENT (LOCA) MODEL ASSESSMENTS 10 CFR 50.46 Report dated March 7, 2012 (See Note 1)

GNF2: L\PCT = 0°F GNF3 LUA: N/A 10 CFR 50.46 Report dated March 7, 2013 (See Note 2)

GNF2: L\PCT = 0°F GNF3 LUA: N/A 10 CFR 50.46 Report dated March 7, 2014 (See Note 3)

GNF2: L\PCT = 0°F GNF3 LUA: N/A GNF2: L'lPCT = -5°F 10 CFR 50.46 Report dated March 6, 2015 (See Note 4)

GNF3 LUA: L'lPCT = 0°F GNF2: L\PCT = 0°F 10 CFR 50.46 Report dated March 7, 2016 (See Note 5)

GNF3 LUA: L\PCT = 0°F GNF2: L\PCT = 0°F 10 CFR 50.46 Report dated March 7, 2017 (See Note 6)

GNF3 LUA: L'lPCT = 0°F GNF2: L'lPCT = 0°F 10 CFR 50.46 Report dated March 7, 2018 (See Note 7)

GNF3 LUA: L'lPCT = 0°F GNF2: 1535°F Net PCT GNF3 LUAs: 1550°F B. CURRENT LOCA MODEL ASSESSMENTS GNF2: I L'lPCT = 0°F Total PCT change from current assessments (See Note 8)

GNF3 LUA: I L'lPCT = 0°F GNF2: I iL'lPCT i =0°F Cumulative PCT change from current assessments GNF3 LUA: I I L'lPCT I = 0°F GNF2: 1535°F Net PCT GNF3 LUA: 1550°F Page 2 of 2

ATTACHMENT 2 LaSalle County Station, Units 1 and 2 10 CFR 50.46 Report Assessment Notes

1) Prior LOCA Model Assessment The referenced letter provided the annual 10 CFR 50.46 report for LSCS, Units 1 and 2, for the 2012 reporting period. The referenced letter reported the introduction of GNF2 fuel into the LSCS , Unit 1, core. A new LOCA analysis of record for GNF2 fuel was performed by General Electric Hitachi (GEH) Nuclear Energy. No Emergency Core Cooling System (ECCS) related changes or modifications occurred at LSCS that affected the assumptions in the GEH GNF2 LOCA analysis.

[

Reference:

Letter from David M. Gullett (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Plant Specific ECCS Evaluation Changes -

10 CFR 50.46 Report," dated March 7, 2012]

2) Prior LOCA Model Assessment The referenced letter provided the annual 10 CFR 50.46 report for LSCS, Units 1 and 2, for the 2013 reporting period. The referenced letter reported the introduction of GNF2 fuel into the LSCS, Unit 2, core. The referenced letter also reported no vendor notifications of ECCS model errors/changes applicable to the GNF2 fuel in LSCS , Units 1 and 2, and reported that no ECCS related changes or modifications occurred at LSCS that affected the assumptions in the GEH GNF2 LOCA analysis for the GNF2 fuel in LSCS, Units 1 and 2.

[

Reference:

Letter from David M. Gui Iott (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station ," dated March 7, 2013)

3) Prior LOCA Model Assessment The referenced letter provided the annual 10 CFR 50.46 report for LSCS, Units 1 and 2, for the 2014 reporting period. The referenced letter reported no vendor notifications of ECCS model errors/changes applicable to the GNF2 fuel in LSCS , Units 1 and 2, and reported that no ECCS related changes or modifications occurred at LSCS that affected the assumptions in the GEH GNF2 LOCA analysis for the GNF2 fuel in LSCS, Units 1 and 2.

[

Reference:

Letter from David M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station," dated March 7, 2014)

Page 1 of 3

ATTACHMENT 2 LaSalle County Station, Units 1 and 2 10 CFR 50.46 Report Assessment Notes

4) Prior LOCA Model Assessment The referenced letter provided the annual 10 CFR 50.46 report for LSCS , Units 1 and 2, for the 2015 reporting period. The referenced letter reported four vendor notifications, Notifications 2014-01 through 2014-04, of ECCS model error/changes. The first notification addressed several code maintenance changes to the SAFER04A model, which resulted in a PCT change of 0°F for GNF2. The second notification corrected a logic error, which affects the ECCS flow credited as reaching the core. Correction of this error resulted in a 0°F PCT change for GNF2. The third notification addressed an error with the imposed minimum pressure differential (lip) for droplet flow above a two-phase level in the core. This error can offer an inappropriate steam cooling benefit above the core two phase level. Correction of this error resulted in a PCT change of -10°F for GNF2. The fourth notification addressed an incorrect pressure head representation when defining the counter current flow limitation (CCFL). Correction of this error resulted in a +5°F PCT change for GNF2.

The referenced letter also reported that no ECCS related changes or modifications occurred at LSCS that affected the assumptions in the GEH LOCA analysis for the GNF2 fuel in LSCS , Units 1 and 2.

Four (4) GNF3 Lead Use Assemblies (LUAs) were loaded into LSCS, Unit 2, during the LSCS, Unit 2, Reload 15 outage (L2R15). Notifications 2014-01through2014-04 were included in the determination of the licensing basis PCT for the GNF3 LUAs.

[

Reference:

Letter from David M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission , "Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station," dated March 6, 2015]

5) Prior LOCA Model Assessment The referenced letter provided the annual 10 CFR 50.46 report for LSCS , Units 1 and 2, for the 2016 reporting period . The referenced letter reported no vendor notifications of ECCS model errors/changes applicable to the GNF2 fuel in LSCS, Units 1 and 2, and reported that no ECCS related changes or modifications occurred at LSCS that affected the assumptions in the GEH GNF2 LOCA analysis of record for the GNF2 fuel in LSCS, Units 1 and 2.

The referenced letter reported no vendor notifications of ECCS model errors/changes applicable to the GNF3 fuel in LSCS , Unit 2, and that no ECCS related changes or modifications occurred at LSCS, Unit 2, that affected the assumptions in the GEH GNF3 LOCA analysis of record for the GNF3 fuel in LSCS, Unit 2. All ATRIUM-10 fuel was removed from LSCS, Unit 1, during the LSCS , Unit 1 Reload 16 (L 1R16) outage prior to startup of LSCS , Unit 1 Cycle 17(L1C17).

[

Reference:

Letter from David M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station," dated March 7, 2016]

Page 2 of 3

ATTACHMENT 2 LaSalle County Station, Units 1 and 2 10 CFR 50.46 Report Assessment Notes

6) Prior LOCA Model Assessment The referenced letter provided the annual 10 CFR 50.46 report for LSCS , Units 1 and 2, for the 2017 reporting period. The referenced letter reported no vendor notifications of ECCS model errors/changes applicable to the GNF2 or GNF3 fuel in LSCS , Units 1 and 2, and reported that no ECCS related changes or modifications occurred at LSCS that affected the assumptions in the GEH LOCA analyses for the GNF2 or GNF3 fuel in LSCS , Units 1 and 2.

The letter also noted that all ATRIUM-10 fuel was removed from LSCS , Unit 2, prior to the start of LSCS , Unit 2, Cycle 17 (L2C17).

[

Reference:

Letter from David M. Gullott (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station ," dated March 7, 2017)

7) Prior LOCA Model Assessment The referenced letter provided the annual 10 CFR 50.46 report for LSCS , Units 1 and 2, for the 2018 reporting period. The referenced letter reported two vendor notifications were produced , 2017-01 and 2017-02 . Notification 2017-01 describes corrections made to the GNF2 lower tie plate modeling and Notification 2017-02 describes corrections made to the fuel rod upper plenum thermal model. Neither of these corrections resulted in a change in PCT for either GNF2 or GNF3.

[

Reference:

Letter from David M. Gullott (Exelon Generation Company , LLC) to U.S. Nuclear Regulatory Commission , "Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station ," dated March 7, 2018)

8) Current LOCA Model Assessment Since the last annual 10 CFR 50.46 report, no vendor notifications of ECCS model errors/changes applicable to the GNF2 fuel in LaSalle County Nuclear Station have been issued. No ECCS related changes or modifications occurred at LSCS that affected the assumptions in the GEH GNF2 LOCA analysis of record for the GNF2 fuel in LSCS , Units 1 and 2.

Additionally, no vendor notifications of ECCS model errors/changes applicable to the GNF3 LUA fuel in LSCS , Unit 2, have been issued. No ECCS related changes or modifications occurred at LSCS , Unit 2, that affected the assumptions in the GEH GNF3 LOCA analysis of record for the GNF3 fuel in LSCS, Unit 2.

Page 3 of 3