RS-16-118, License Amendment Request to Utilize the TORMIS Computer Code Methodology

From kanterella
Jump to navigation Jump to search

License Amendment Request to Utilize the TORMIS Computer Code Methodology
ML16281A174
Person / Time
Site: Byron  Constellation icon.png
Issue date: 10/07/2016
From: Gullott D
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-16-118
Download: ML16281A174 (97)


Text

AMON"kw Exelon G Warr Winfield Road Warr Winfield IL 60555 www.exeloneorp.com RS-16-118

10 CFR 50.90 October 7, 2016 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

License Amendment Request to Utilize the TORMIS Computer Code Methodology In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit or early site permit," and 10 CFR 50.59, "Changes, tests, and experiments," paragraph (c)(2)(viii),

Exelon Generation Company, LLC, (EGC) requests amendments to Renewed Facility Operating License Nos. NPF-37 and NPF-66 for Byron Station, Units 1 and 2. This amendment request proposes to revise the Byron Station licensing basis for protection from tornado-generated missiles. Specifically, the Updated Final Safety Analysis Report (UFSAR) will be revised to identify the TORMIS Computer Code as the methodology used for assessing tornado-generated missile protection of unprotected plant structures, systems and components (SSCs) and to describe the results of the Byron Station site-specific tornado hazard analysis. The results from the Byron Station TORMIS analysis will be used to credit unprotected equipment for post-tornado safe shutdown. Of particular note, the Essential Service Water Cooling Tower (SXCT) fans and cells that survive a tornado strike will be credited for Ultimate Heat Sink (UHS) cooling as opposed to the original licensing basis that assumed all the unprotected SXCT fans are damaged by tornado-generated missiles. Note that there are no Technical Specifications changes associated with this request.

The Byron Station TORMIS analysis utilizes a probabilistic approach performed in accordance with the guidance described in the NRC TORMIS Safety Evaluation Report dated October 26, 1983, as clarified by Regulatory Issue Summary (RIS) 2008-14, "Use of TORMIS Computer Code for Assessment of Tornado Missile Protection," dated June 16, 2008. to this letter provides an evaluation of the proposed changes and a summary of the supporting analysis.

The proposed amendment has been reviewed by the Byron Station Plant Operations Review Committee in accordance with the requirements of the EGC Quality Assurance Program.

In accordance with 10 CFR 50.91, "Notice for public comment; State consultation," paragraph (b),

EGC is notifying the State of Illinois of this application for license amendment by transmitting a copy of this letter and its attachments to the designated State of Illinois official.

October 7, 2016 U. S. Nuclear Regulatory Commission Page 2 It should be noted that Byron Station issued Event Notification 51958, dated May 25, 2016, "Discovery of Non-Conforming Conditions During Tornado Hazards Analysis." This Notification Report documents non-conforming conditions in the plant design such that specific Technical Specifications equipment on both units is considered to be inadequately protected from tornado missiles. These conditions are being addressed in accordance with Enforcement Guidance Memorandum 15-002, "Enforcement Discretion for Tornado-Generated Missile Protection Noncomplicance," dated June 10, 2015 and DSS-ISG-2016-01, "Clarification of Licensee Actions in Receipt of Enforcement Discretion Per Enforcement Guidance Memorandum EGM 15-002, "Enforcement Discretion for Tornado-Generated Missile Protection Noncomplicance."

EGC requests approval of the proposed license amendment request within one year of this submittal date; i.e., by October 7, 2017; which meets the timeframe specified in the EGM for addressing tornado missile non-compliances.

There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Joseph A. Bauer at (630) 657-2804.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 7t" day of October 2016.

Respectfully, David M. Gullott Manager Licensing Exelon Generation Company, LLC Attachments:

Evaluation of Proposed Changes -1 TORMIS Results Tables 1-6 -2 TORMIS Results Figures 1-10 -3 Draft Markup of Updated Final Safety Analysis Pages cc:

NRC Regional Administrator, Region III NRC Senior Resident Inspector, Byron Station Illinois Emergency Management Agency Division of Nuclear Safety

ATTACHMENT I Evaluation of Proposed Changes

Subject:

License Amendment Request to Utilize the TORMIS Computer Code Methodology 1.0

SUMMARY

DESCRIPTION 2.0

DETAILED DESCRIPTION

==3.0

TECHNICAL EVALUATION==

3.1

Current Licensing Basis for Tornado Missile Protection 3.2

Ultimate Heat Sink System Overview 3.3

Tornado Missile Concerns at Byron Station Prompting TORMIS Analysis 3.4

TORMIS Methodology and Analysis Results

==4.0

REGULATORY EVALUATION==

4.1

Applicable Regulatory Requirements/Criteria 4.2

Precedent 4.3

No Significant Hazards Consideration 4.4

Conclusions

==5.0

ENVIRONMENTAL CONSIDERATION==

6.0 REFERENCES

1 of 32

ATTACHMENT I Evaluation of Proposed Changes In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit or early site permit," and 10 CFR 50.59, "Changes, tests, and experiments," paragraph (c)(2)(viii),

Exelon Generation Company, LLC, (EGC) requests amendments to Renewed Facility Operating License Nos. NPF-37 and NPF-66 for Byron Station, Units 1 and 2. This amendment request proposes to revise the Byron Station licensing basis for protection from tornado-generated missiles. Specifically, the Updated Final Safety Analysis Report (UFSAR) will be revised to identify the TORMIS Computer Code as the methodology used for assessing tornado-generated missile protection of unprotected plant structures, systems and components (SSCs); and to describe the results of the Byron Station site-specific tornado hazard analysis. The results from the Byron Station TORMIS analysis will be used to credit unprotected equipment for post-tornado safe shutdown. Of particular note, the Essential Service Water Cooling Tower (SXCT) fans and cells that survive a tornado strike will be credited for Ultimate Heat Sink (UHS) cooling as opposed to the original licensing basis that assumed all the unprotected SXCT fans are damaged by tornado-generated missiles. Modifying the UHS licensing basis, and other affected UFSAR sections, will be performed in accordance with 10 CFR 50.59, "Changes, tests and experiments," only after approval of the proposed amendment. Note that there are no Technical Specifications changes associated With this request.

The Byron Station TORMIS analysis utilizes a probabilistic approach performed in accordance with the guidance described in the NRC TORMIS Safety Evaluation Report dated October 26, 1983 (Reference 1), as clarified by Regulatory Issue Summary (RIS) 2008-14, "Use of TORMIS Computer Code for Assessment of Tornado Missile Protection," dated June 16, 2008 (Reference 2). The Byron Station TORMIS analysis was performed by Applied Research Associates, Inc. (ARA) using TORMIS-14, an updated version of the original EPRI NP-2005 (Reference 5) version of the code.

2.0

DETAILED DESCRIPTION The proposed revision to the Byron Station tornado licensing basis is based on the NRC approved methodology as detailed in topical reports: EPRI NP-768, "Tornado Missile Risk Analysis," May 1978 (Reference 3), EPRI NP-769, "Tornado Missile Risk Analysis Appendices," May 1978 (Reference 4) and EPRI NP-2005, "Tornado Missile Risk Evaluation Methodology," August 1981 (Reference 5). These reports address utilization of the TORMIS Computer Code. TORMIS uses a Monte Carlo simulation technique to assess, through a Probabilistic Risk Assessment (PRA) methodology, the probability of multiple missile hits causing unacceptable damage to unprotected safety-significant components at a plant. For each tornado strike, the tornado windfield is simulated, missiles are injected and flown, and missile impacts on structures and equipment are analyzed. These models are linked to form an integrated, time-history simulation methodology. By repeating these simulations, the frequencies of missiles impacting and damaging individual components (targets) and groups of targets are estimated. Statistical convergence of the results is achieved by performing multiple replications with different random number seeds. The statistical confidence bounds of the results can then be estimated using conventional methods.

2 of 32

ATTACHMENT I Evaluation of Proposed Changes Over 27.7 billion TORMIS tornado missile simulations were performed for the Byron Station analysis. Each simulation consists of sampling and flying a missile for a simulated tornado strike on the plant. A total of 2.31 million tornado strikes on the plant were simulated in the TORMIS analysis.

The TORMIS results are estimated frequencies of tornado missile hit and damage, and have the units of yr-1. They represent the modeled-output frequencies of tornado missile hit/damage to a target, or group of targets. There were 153 individual unprotected safety-significant targets modeled in TORMIS as shown in Attachment 1 -1, Table 1, "TORMIS Results by Individual TORMIS Target." The average missile hit and damage frequencies were developed from 60 TORMIS replications.

In summary, the results in Table 2-1 below show that the arithmetic sum of damage frequencies for all target groups affecting the individual units (i.e., Unit 1 plus common components and Unit 2 plus common components) are lower than the acceptable threshold frequency of 1.0E-06 per year established in the Standard Review Plan, Section 2.2.3, "Evaluation of Potential Accidents." The acceptance value of 1.0E-06 per year was endorsed in Reference 8 and Reference 2.

Note that two cases (i.e., initial conditions) specific to the UHS cells were evaluated (i.e., the "l Cell out of Service" case and "2 Cells out of Service" case). These UHS cases are discussed below in Section 3.4.3, "Boolean Logic for the Ultimate Heat Sink." The results in Table 2-1 assume that discretionary missile protection modifications will be installed for the Unit 1 and Unit 2 Refueling Water Storage Tank (RWST) Hatches (i.e., Attachment 1-1, Table 1, Target Numbers 135 and 136). None of the other unprotected safety-significant targets are assumed to have additional tornado missile protection installed.

Table 2-1 Mean Damage Frequency by Unit (With RWST Hatches Protected)

Damage Frequency (yr-')

1 Cell out of Service 2 Cells out of Service Unit I Damage Frequency Sum for all Target Groups 6.68E-07 6.37E-07 Unit 2 Damage Frequency Sum for all Target Groups 7.27E-07 6.97E-07 Additional information regarding the TORMIS analysis results is presented in Section 3.4.4 below.

The current tornado design basis and licensing basis for tornado missile protection is discussed in the following UFSAR sections.

UFSAR Section 3.3, "Wind and Tornado Loadings" UFSAR Section 3.5, "Missile Protection" As noted above, these UFSAR sections will be revised in accordance with 10 CFR 50.59 to incorporate the TORMIS analysis after approval of the proposed amendment. Draft markups of the proposed changes to these UFSAR sections are presented in Attachment 1-3 for information. Note that the UFSAR markups include the presumptive changes that will be made 3 of 32

ATTACHMENT I Evaluation of Proposed Changes to the UHS licensing basis in accordance with 10 CFR 50.59 based on implementation of the TORMIS analysis results.

Other UFSAR sections, impacted by the changes in Sections 3.3 and 3.5, will also be revised in accordance with 10 CFR 50.59 after approval of the proposed amendment; however, are not included with this submittal.

==3.0

TECHNICAL EVALUATION==

The evaluation and description of the Byron Station TORMIS analysis and the associated results supporting the proposed UFSAR changes, is presented below in the following sections.

Section 3. 1, "Current Licensing Basis for Tornado Missile Protection," describes the current tornado missile protection licensing basis.

Section 3.2, "Ultimate Heat Sink System Overview," provides a brief description of the current UHS system description and post tornado cooldown capability.

Section 3.3, "Tornado Missile Concerns at Byron Station Prompting TORMIS Analysis,"

briefly describes the past issues pertaining to Byron Station missile protection which are, in part, prompting this request.

Section 3.4, "TORMIS Methodology and Analysis Results," summarizes the TORMIS methodology, including the use of Boolean Logic. This section also summarizes the analysis results and discusses how compliance with the TORMIS SER (Reference 1) and NRC RIS 2008-14 (Reference 2) requirements are met.

3.1

Current Licensing Basis for Tornado Missile Protection The current licensing basis for tornado missile protection is presented in UFSAR Sections 3.5.3, "Barrier Design Procedures," and 3.5.4, "Analysis of Missiles Generated by a Tornado." Most safety related systems and components are located inside structures designed to protect them from tornado-generated missiles as discussed in UFSAR Section 3.5.3.

UFSAR Section 3.5.4 describes the licensing basis for safety-related components located outdoors. Section 3.5.4 states the following:

"Effects of tornado missiles have been assessed for safety-related components located outdoors. These components are the essential service water cooling towers (Byron only),

the emergency diesel exhaust stacks, diesel ventilating and combustion air intake, diesel crankcase vents, the fuel handling building door, and the main steam safety and relief valve stacks. "

Section 3.5.4 provides a discussion addressing how the existing missile protection (or lack of missile protection) is acceptable.

4 of 32

ATTACHMENT I Evaluation of Proposed Changes Section 3.5.4.1, "Essential Service Water Cooling Tower (Byron)," specifically addresses the tornado missile protection for the SXCTs. It is acknowledged that certain portions of the SXCTs are not tornado missile protected.

3.2

Ultimate Heat Sink System Overview As noted above, based on the results of the Byron Station TORMIS analysis, SXCT fans and cells that survive a tornado will be credited in the UHS cooling capability as opposed to the original licensing basis that assumes all unprotected SXCT fans are damaged by tornado-generated missiles. A brief description of the UHS and associated SXCT fan configuration is provided below to assist in understanding the impact of the TORMIS analysis as it relates to the UHS.

The Byron UHS is a common system for the two Byron Station units and consists of two mechanical draft cooling towers (i.e., OA and OB). Each tower has four cells and each cell has a manually actuated fan (see Attachment 1-2, Figures 1 and 2. Note that Figure 1 is provided for informational purposes and is not controlled as a design document). Two fans in Tower OA are powered from Unit 1, Division 11, and the other two fans are powered from Unit 2, Division 21.

Similarly, two fans in Tower OB are powered from Unit 1, Division 12; and the other two fans are powered from Unit 2, Division 22. Each cell is served by a riser pipe which delivers the return water to the spray header. Each tower basin contains an anti-vortex duct and trash screen for the suction intakes that supply water to the units. Byron Technical Specification 3.7.9, "Ultimate Heat Sink (UHS)," allows one or two SXCT fans to be out of service, depending on the SX pump discharge water temperature.

During a post-tornado cooldown of both units, sufficient UHS cooling capacity must be available to achieve Cold Shutdown (CSD) conditions (i.e., < 200 OF) "...within a reasonable period of time following shutdown, assuming the most limiting single failure," as specified in Branch Technical Position (BTP) RSB 5-1, "Design Requirements of the Residual Heat Removal System," July 1981. UFSAR Section 5.4.7, "Residual Heat Removal System," further clarifies this time to be 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

The design of the Byron Station UHS is based on having a sufficient number of operable SXCT fans to remove the accident/transient heat load. As described in UFSAR Section 9.2.5.3.1, "Ultimate Heat Sink Design Basis," the Byron Station UHS is designed to remove the heat load from one unit experiencing a loss-of-coolant accident (LOCA) coincident with a loss-of offsite power (LOOP) in one unit and the concurrent orderly shutdown from maximum power to cold shutdown of the other unit. The LOCA analysis considers that two SXCT fans may be out of service as allowed by Byron Technical Specification 3.7.9, "Ultimate Heat Sink (UHS)," and a passive electrical failure that results in two additional fans not available to remove the accident heat load. Thus for a LOOP/LOCA event, as few as four SXCT fans have been shown to be acceptable. The peak heat input to the UHS for a post-tornado two unit shutdown event (which assumes a dual unit LOOP) is much less than the peak heat load imposed on the UHS during a LOCA; therefore, fewer SXCT fans are needed for a post-tornado cooldown of both units; i.e.,

either 2 or 3 SXCT fans are needed depending on the case, as discussed below in Section 3.4.3, "Boolean Logic for the Ultimate Heat Sink."

5 of 32

ATTACHMENT I Evaluation of Proposed Changes 3.3

Tornado Missile Concerns at Byron Station Prompting TORMIS Analysis In NRC Inspection Report, "Byron Station, Units 1 and 2, Integrated Inspection Report 05000454/2009004; 05000455/2009004," dated November 5, 2009, Byron Station received a non-cited violation, NCV 05000454/2009004-02; 05000455/2009004-02, for failure to protect the Emergency Diesel Generator (EDG) Diesel Oil Storage Tank (DOST) vent lines from tornado-generated missiles. During the extent of condition review to address this violation, additional safety related pipes vulnerable to tornado-generated missiles were identified (i.e., the Steam Generator Power Operated Relief Valve (PORV) tailpipes, the Main Steam Safety Valve (MSSV) tailpipes, and the Auxiliary Feedwater (AF) Diesel exhaust stacks).

Subsequently, in NRC Inspection Report, "Byron Station, Units 1 and 2, NRC Component Design Bases Inspection; Inspection Report 05000454/2015008; 05000455/2015008 and Notice of Violation," dated July 21, 2015, Byron Station received another non-cited violation, NCV 05000454/2015008-06; 05000455/2015008-06, for failure to evaluate the adverse effects of changing the SXCT Tornado Analysis as described in the UFSAR, Section 3.5.4, "Analysis of Missiles Generated by a Tornado," Revision 14. This revision changed the UFSAR to assume that two SXCT fans survive a tornado strike. As a result of this violation, the UFSAR analysis of record reverted back to the original licensing basis assumption that multiple tornado missile hits could result in the loss of all SXCT fans. An Operability Evaluation was completed and is currently in place to address the concern that CSD cannot be achieved within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> with no SXCT fans available after a postulated tornado event.

On May 25, 2016, Byron Station issued Event Notification 51958, "Discovery of Non-Conforming Conditions During Tornado Hazards Analysis." This Notification Report documents non-conforming conditions in the plant design such that specific Technical Specifications equipment on both units is considered to be inadequately protected from tornado missiles.

These conditions are being addressed in accordance with Enforcement Guidance Memorandum 15-002, "Enforcement Discretion for Tornado-Generated Missile Protection Noncom pl icance, dated June 10, 2015 and DSS-ISG-2016-01, "Clarification of Licensee Actions in Receipt of Enforcement Discretion Per Enforcement Guidance Memorandum EGM 15-002, "Enforcement Discretion for Tornado-Generated Missile Protection Noncom pl icance. "

To resolve the above concerns and close out the Operability Evaluation, Byron Station has decided to pursue NRC approval to utilize the TORMIS Computer Code methodology for assessing tornado-generated missile protection of the Byron Station SSCs. Unprotected targets needed for safe shutdown after a tornado, including the unprotected UHS components, are included in the TORMIS analysis. The results of the TORMIS analysis specific to the post-tornado survival of the SXCT fans will be used to evaluate SXCT capability for safe shutdown after a tornado event. NRC approval of the TORMIS methodology will allow Byron Station to credit sufficient SXCT fans (after a tornado event) and avoid costly modifications to provide tornado missile protection to the necessary equipment. The appropriate sections of the UFSAR will then be modified under the 10 CFR 50.59 process to reflect these results. In addition, as noted in RIS 2008-14, "Once the TORMIS methodology has been approved for the plant and incorporated in the plant licensing basis, it can be used to address additional tornado missile vulnerabilities identified in the future without seeking NRC approval, provided its use is consistent with the approved licensing basis of the plant."

6 of 32

ATTACHMENT 1 Evaluation of Proposed Changes 3.4

TORMIS Methodology and Analysis Results As noted in Section 2.0 above, TORMIS uses a Monte Carlo simulation technique to assess, through a PRA methodology, the probability of multiple missile hits causing unacceptable damage to unprotected safety-significant components at a plant. Over 27.7 billion TORMIS tornado missile simulations were performed for the Byron Station analysis. Each simulation consists of sampling and flying a missile for a simulated tornado strike on the plant. A total of 2.31 million tornado strikes on the plant were simulated in the TORMIS analysis.

The TORMIS results are estimated frequencies of tornado missile hit and damage. They represent the modeled-output frequencies of tornado missile hit/damage to a target, or group of targets. There were 153 individual unprotected safety-significant targets modeled in TORMIS.

The average missile hit and damage frequencies were developed from 60 TORMIS replications.

The TORMIS results for the 153 individual safety-significant targets are presented in -1, Table 1, "TORMIS Results by Individual TORMIS Target."

3.4.1 Target Hit and Damage Frequency Target missile hit frequencies, shown in Attachment 1 -1, Table 1, reflect the frequency of at least one tornado missile hitting a target over a period of one year. For very large targets, tornado-generated missiles are likely to hit the target for almost every tornado strike and hence the missile hit frequency may approximately equal the tornado strike frequency for such targets.

As the target size reduces, as the target is shielded by other structures, or if only one surface of the target is exposed, the missile hit frequency reduces accordingly. In general, tornado missile hit frequencies are dependent on many geometrical factors as well as missile types, numbers, and proximity. The degree to which the elevation of the target is above the elevation of the nearby missile sources can also be a critical factor.

The damage frequencies, shown in Attachment 1 -1, Table 1, reflect the modeling of damage in TORMIS. For many targets there is a notable reduction in the damage frequency from the hit frequency. The term "target damage" is used in a general sense to mean any damage (or "loss of function") criteria caused by a tornado missile hitting the target. Target damage is not necessarily the same as target hit, but hit can equal damage for fragile equipment. The accepted (i.e., built-in) TORMIS penetration, spall, and perforation equations were used to evaluate damage for selected targets. Missile impact and velocity exceedance was also used to evaluate damage for several targets.

It should be noted that the damage frequency values for the Division 1 and Division 2 MEER ventilation system exhaust openings for each unit (i.e., Attachment 1-1, Table 1, Target Numbers 137, 138, 141 and 142) assume some amount of acceptable tornado missile damage.

The MEER exhaust openings were modeled in TORMIS using the pipe penetration feature to determine the missile damage frequency. When using the pipe penetration feature, exhaust system components (e.g., HELB and/or fire dampers) within the wall opening may be impacted such that the exhaust path is blocked due to physical damage or debris accumulation.

Necessary equipment, such as instrument inverters and battery chargers, are contained in the MEERs; therefore, manual action is relied on to restore ventilation. The associated manual actions entail simple activities to open doors (to provide an exhaust path) and restart supply fans.

7 of 32

ATTACHMENT I Evaluation of Proposed Changes Structural response damage (i.e., velocity exceedance) can be evaluated within TORMIS using the results from offline structural response calculations. For the Byron Station TORMIS analysis, a finite element analysis was performed to provide the required missile damage threshold velocity for each missile type to cause unacceptable damage to the following targets:

  • Diesel Auxiliary Feed Pump (DAFP) exhaust pipes
  • DAFP exhaust cover plates
  • Power Operated Relief Valve (PORV) tailpipes
  • UHS riser pipes System flow analyses were performed to determine the acceptance criteria (critical area) for crimping damage. Finite element analysis was used to determine the critical impact velocity required to crimp the pipe or cover plate to its critical area for eight of the TORMIS missiles.

The results from the finite element analysis were then used to develop critical velocities for the other Byron Station TORMIS missiles. For these selected targets, damage is evaluated by comparing the missile velocity to the damage threshold velocity for the particular missile type and target group. If the missile velocity meets or exceeds the damage threshold velocity, it is scored as damage. The following conservatisms were applied when determining the damage threshold velocities:

  • In general, the finite element analysis missile models were built to be conservatively strong and rigid. Conversely, target models were built to be conservatively weak to maximize the degree of potential crimping.
  • The threshold velocity for missiles causing damage to the DAFP exhaust pipes, DAFP exhaust cover plates, UHS riser pipes, and PORV tailpipes were input into TORMIS as 90%

of the critical velocities calculated in the finite element analysis.

Note that, if the individual target damage frequencies in Attachment 1-1, Table 1 were summed, the sum total would exceed the acceptable threshold of 1.0E-06 per year. This is primarily due to the damage frequency of a limited number of targets, individually, approaching 1.0E-06 per year. This is shown graphically in Attachment 1-2, Figure 3, "Individual Target Hit and Damage Frequencies." To address this issue, Boolean combinations of targets were developed to aid in summarizing the results and understanding the effects of system redundancies. This approach yielded acceptable results. Note that the Boolean Group Number and associated Target Group name (i.e., 38 groups), assigned to each of the 153 individual targets, are shown on -1, Table 1. A description of the Boolean Logic approach is provided below.

3.4.2 Boolean Logic Approach Boolean Logic is applied to targets to account for redundancy in the structural or system design or TORMIS modeling of a component as multiple targets. With redundancy in the design, the system function could be met even with one or more individual targets damaged by postulated tornado missiles. The logic is applied to each TORMIS simulated tornado to determine if the missile damage results in a loss of function of the target group. For components/systems that have been modeled with multiple targets or with two failure modes, the Boolean Logic is used to eliminate over counting of the loss of function. For example, the unprotected PORV tailpipes are evaluated for two separate failure modes: 1) pipe penetration and 2) crimping due to 8 of 32

ATTACHMENT I Evaluation of Proposed Changes velocity exceedance. A TORMIS tornado simulation that results in either penetration of the tailpipe opening or velocity exceedance (i.e., unacceptable damage of the tailpipe) would result in loss of PORV function. For the TORMIS tornado simulations where both pipe penetration and velocity exceedance occur, the PORV function is lost when the first missile hit occurs and the second missile hit just results in additional damage. Thus, the Boolean Logic is used to count these two failures as a single loss of PORV function when determining the damage frequency for that PORV target group.

Hit and damage frequencies for groups of targets evaluated in TORMIS are commonly combined using Boolean operators (U and fl) to aid in summarizing the results and understanding the effects of the system redundancies. The union (U) operator means that if any one of the targets is damaged in a tornado, the system is assumed to fail. The intersection (n) operator means that all the intersected components must be damaged in a tornado strike for the system to fail. Combinations of union and intersection operators can be put together to describe multi-component system failure logic for plant systems and subsystems.

The 153 individual targets were grouped together according to target type and/or function. -1, Table 2, "Average Hit and Damage Frequency (per year) for Target Groups, presents the missile hit and damage frequencies for the target groups as previously defined in -1, Table I (i.e., the frequency values for each of the 38 groups in Table 2, are simply the sum of the individual target frequencies for those targets assigned to each group as shown in Table 1). These values are plotted in Attachment 1-2 Figure 4, "Target Group Hit and Damage Frequencies."

Note that the damage frequencies for each of the UHS Cell groups (i.e., Groups number 2-9) approach or exceed 1.0E-06 per year. However, these union (U) calculations do not consider any redundancy between the 8 cells that comprise the UHS. Section 3.4.3 below, discusses a more rigorous approach to the Boolean Logic developed using the TORSCR code to account for the redundancy of the cells within the UHS. TORSCR is a FORTRAN computer code that is used to post-process TORMIS output files. Its primary function is to compute Boolean combinations of target hit and damage probabilities over multiple targets. Note that the TORSCR post-processing computer code and use of the Boolean Logic approach was previously approved by the NRC for Limerick Generating Station (References 9 and 10).

3.4.3 Boolean Logic for the Ultimate Heat Sink For the TORMIS analysis results regarding the UHS, success is defined as 3 of 8 cells surviving for the "one cell out of service" case; or 2 of 8 cells surviving for the "2 cells out of service" case.

The number of cells that may be initially out of service is dependent on the outside air wet bulb temperature and number of operating units. The UHS post-tornado cool down analysis credits the surviving cells and shows that CSD is achieved within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following a unit shutdown due to a tornado. Each case also assumes a worst case single failure of an electrical bus that results in the loss of power to two additional SXCT fans. The station will establish administrative controls to ensure the assumed initial conditions in the post-tornado UHS cooldown analysis are met; i.e., the administrative controls will specify the number of SXCT fans required to be operable based on outside environmental conditions.

9 of 32

ATTACHMENT I Evaluation of Proposed Changes The Boolean Logic for the UHS was created based on minimum tower requirements. The basis for success/failure of the UHS includes the following considerations and assumptions:

1. One or two cells are assumed at random to be out of service for maintenance
a. Use of the word "cells" includes the fan blades, fan motors, gearbox oil level gauges, inspection hatches, and personnel hatches as identified for Target Groups 2-9 in -1, Table 1.
b. All cells are equally likely to be out of service.
2. Two Paired cells are assumed to have failed from a random electrical bus failure. Paired cells are as follows:
a. Electrical Room 131Z (Division 11 power): UHS cells A and B
b. Electrical Room 231Z (Division 21 power): UHS cells C and D
c. Electrical Room 132Z (Division 12 power): UHS cells E and F
d. Electrical Room 232Z (Division 22 power): UHS cells G and H
3. Assuming that considerations 1 and 2 affect different cells (e.g., cells randomly out of service are not affected by the random electrical failure) results in 4 or 5 cells available to support cooling function of the UHS. This assumption is conservative since the cells randomly out of service could also be affected by the random electrical room failure.
4. The UHS will perform its design function with at least 3 of the remaining 5 cells surviving for the 1 cell out of service case or 2 of 4 remaining cells surviving in the 2 cells out of service case based on outside air wet bulb temperature and the number of operating units.
5. The TORMIS analysis conservatively assumes that a failure of any of the 8 riser pipes results in the failure of all cells in the UHS.
6. Missile perforation to either of the anti-vortex boxes and trash screens results in failure of all cells in the UHS.

This logic was then implemented in the TORMIS post-processor TORSCR using the following procedure:

1. Conservatively, assume that the UHS cells with the lowest probability of tornado missile damage are the cells that are either out of service for maintenance or have failed from random electrical failure.
a.

From Attachment 1 -1, Table 2, the 4 cells with the lowest damage frequencies in ascending order are cells E, B, F, and G. As such:

i.

For I cell out of service:

1. Cell B is assumed to be randomly out of service for maintenance, and
2. Cells E and F are assumed to be out of service because Electrical Room 132Z experienced random electrical failure.

10 of 32

ATTACHMENT I Evaluation of Proposed Changes ii.

For 2 cells out of service

1. Cells B and G are assumed to be randomly out of service for maintenance, and
2. Cells E and F are assumed to be out of service because Electrical Room 132Z experienced random electrical failure.
b. The 4 cells with the highest damage frequencies are cells A, C, D, and H.
2. With the cells of highest damage frequency conservatively identified in Step 1 above (i.e.,

cells G, A, C, D and H), the 8 finest-grain, mutually exclusive, and collectively exhaustive listing of failure events affecting the survival of the UHS are defined as shown in -1, Table 3, "Individual Failure Events Considered in UHS Boolean Sample Space."

3. Based on the 8 failure events defined in Step 2, the sample space shown in -1, Table 4, "Space of 256 Possible Failure Combinations of UHS," was constructed to identify the possible outcomes for the UHS tornado missile events.

Considering all possible combinations of the eight individual events shown in Attachment 1-1, Table 3 results in a total of 28 (256) total combinations to consider. The survival/failure outcome for each possible combination is given in the second and third to last columns of the table. Each of the combinations with "Survive" in the columns titled "l Cell Out of Service" or "2 Cells Out of Service" results in that case surviving. Likewise a "Fail" value in these columns results is that condition failing.

a. For 1 cell out of service, 24 combinations lead to 3 or more cells surviving and the remaining 232 combinations result in less than 3 cells surviving. Failure of the UHS is therefore failure of 3 of 5, 4 of 5, or 5 of 5 of the remaining cells.
b. For 2 cells out of service, 46 combinations lead to 2 or more cells surviving and the remaining 210 combinations result in less than 2 cells surviving. Failure of the UHS is therefore failure of 3 of 4, or 4 of 4 of the remaining cells.
4. The sample space discussed in Step 3 above was then implemented in the TORMIS post-processor TORSCR in order to evaluate the probability of each of the 256 event combinations. All event combinations listed in the sample space are implemented in TORSCR using the Boolean intersection (n) operator, which is interpreted as "AND." For example, combination number 53 can be expressed in words as the frequency that "Event fails AND Event 2 survives AND Event 3 survives AND Event 4 survives AND Event 5 fails AND Event 6 fails AND Event 7 survives AND Event 8 survives." Implementation of this logic into TORSCR required updating of the Boolean subroutine, increasing dimensions for variables related to the number of events, and recompilation of the source code.

The final column of Attachment 1-1, Table 4 shows the frequencies for each of the event combinations. This table also shows that the sum of these frequencies leading to failure in the 1 cell out of service case is 1.73E-07 per year, and the sum of these frequencies leading to failure in the 2 cells out of service case is 1.42E-07 per year. These results reflect averaging over the 60 TORMIS replications completed for the plant that considered both outage and non-outage missile scenarios.

3.4.4 TORMIS Analysis Results The final results for the damage frequency for all Byron Station target groups, utilizing the Boolean Logic approach, are presented in Attachment 1-1, Table 5, "Mean Damage Frequency (per Year) for Byron Station Target Groups." A summary of the damage frequency results for 11 of 32

ATTACHMENT I Evaluation of Proposed Changes each unit and for all target groups (i.e., the composite site) is shown below in Table 3.4.4-1.

Note that the results show the arithmetic sum of damage frequencies for targets affecting the individual units (i.e., Unit 1 plus common components and Unit 2 plus common components) and the composite site. Note that each individual unit damage frequency is lower than the acceptable threshold frequency of 1.0E-06 per year established in the Standard Review Plan, Section 2.2.3, "Evaluation of Potential Accidents," and Reference 8. However, the composite site damage frequency is slightly over this limit; i.e., 1.61 E-06 per year and 1.58E-06 per year for the "l Cell out of Service" case and "2 Cells out of Service" case, respectively.

Table 3.4.4-1 Mean Damage Frequency Damage Frequency (yr')

1 Cell out of Service 2 Cells out of Service Unit 1 Damage Frequency Sum for all Target Groups 9.13E-07 8.83E-07 Unit 2 Damage Frequency Sum for all Target Groups 9.66E-07 9.36E-07

  • Composite Site Damage Frequency for all Target Groups 1.61 E-06 1.58E-06
  • Composite site damage frequency values are provided for information only.

As noted, the individual units meet the acceptance criterion of 1.0E-06 per year; however, there is little margin. Note that the acceptance criterion is applied on a unit-specific basis as documented in the NRC Safety Evaluation for use of the TORMIS methodology at the Donald C.

Cook Nuclear Plant; i.e., in a letter from J. F. Stang (NRC) to R. P. Powers (Indiana Michigan Power Company), "Donald C. Cook Nuclear Plant, Units 1 and 2 Issuance of Amendments,"

dated November 17, 2000 (Reference 12).

Based on these results, Byron Station is considering modifications to install missile protection for the Unit 1 and Unit 2 RWST Hatches (i.e., Attachment 1 -1, Table 1, Target Numbers 135 and 136). These targets were initially included in the TORMIS model; however, if missile protection is installed for these targets, margin would be improved and the final damage frequency results would be reduced as shown in Table 3.4.4-2 below. Please note that EGC assumes that NRC approval to use the TORMIS methodology at Byron Station will not be contingent on installation of the above noted modifications. The unit-specific damage frequency values noted in Table 3.4.4-1 above, meet the acceptance criteria assuming no missile protection modifications for any target groups; therefore, the subject modifications are considered discretionary and would provide additional margin.

Table 3.4.4-2 Revised Mean Damage Frequency (With RWST Hatches Protected)

Damage Frequency (yr-')

1 Cell out of Service 2 Cells out of Service Unit 1 Damage Frequency Sum for all Target Groups 6.68E-07 6.37E-07 Unit 2 Damage Frequency Sum for all Target Groups 7.27E-07 6.97E-07

  • Composite Site Damage Frequency for all Target Groups

I 1.12E-06 1.09E-06

  • Composite site damage frequency values are provided for information only.

12 of 32

ATTACHMENT TACHMENT I Evaluation of Proposed Changes 3.4.6 Compliance with the NRC Safety Evaluation Report (SER) Acceptance Criteria In Reference 1 (i.e., the TORMIS SER), the NRC stated that licensees using the EPRI approach (i.e., the TORMIS methodology) must consider the following points and provide the following information:

1. Data on tornado characteristics should be employed for both broad regions and small areas around the site. The most conservative values should be used in the risk analysis or justification provided for those values selected.
2. The EPRI study proposes a modified tornado classification, F'-scale, for which the velocity ranges are lower by as much as 25% than the velocity ranges originally proposed in the Fujita, F-scale. Insufficient documentation was provided in the studies in support of the reduced F'-scale. The F-scale tornado classification should therefore be used in order to obtain conservative results.
3. Reductions in tornado wind speed near the ground due to surface friction effects are not sufficiently documented in the EPRI study. Such reductions were not consistently accounted for when estimating tornado wind speeds at 33 feet above grade on the basis of observed damage at lower elevations. Therefore, users should calculate the effect of assuming velocity profiles with ratios Vo (speed at ground level) / V33 (speed at 33 feet elevation) higher than that in the EPRI study. Discussion of sensitivity of the results to changes in the modeling of the tornado wind speed profile near the ground should be provided.
4. The assumptions concerning the locations and numbers of potential missiles presented at a specific site are not well established in the EPRI studies. However, the EPRI methodology allows site specific information on tornado missile availability to be incorporated in the risk calculation. Therefore, users should provide sufficient information to justify the assumed missile density based on site specific missile sources and dominant tornado paths of travel.
5. Once the EPRI [TORMIS] methodology has been chosen, justification should be provided for any deviations from the calculational approach [i.e., from the original EPRI methodology].

The following information summarizes how the Byron Station TORMIS analysis satisfies the above criteria.

1. Data on Tornado Characteristics Employed to Identify Byron Station Sub-Region A site-specific analysis has been performed to generate a tornado hazard curve for Byron Station and a data set for the TORMIS analysis. The National Oceanic Atmospheric Administration (NOAA) Storm Prediction Center Severe Weather Database was used to identify a homogenous sub-region around the station. Tornadoes have been mapped for a large region and statistical tests have been performed to identify a suitable sub-region. The sub-region tornado occurrence rate, EF-scale intensities, path length, width, and direction variables have been analyzed for use in the TORMIS analysis.

The analysis examines both broad and small regions around the site and provides justification for the final sub-region selected. Two Hundred Twenty-five (225) 1 0 latitude-13 of 32

ATTACHMENT I Evaluation of Proposed Changes longitude blocks and 25 3' blocks were analyzed to determine a homogeneous sub-region and to assess variation of risk within the sub-region. A tornado hazard curve for Byron Station was developed and the EF-scale wind speeds were used in this analysis in accordance with NUREG/CR-4461, Revision 2 (Reference 6).

A total of 3,289 tornadoes were reported in the 64 year period (i.e., 1950-2013), producing an average of 51.4 per year. The mean unadjusted occurrence rate is:

v = 771toA = 3.11 E-04 tornadoes I square mile I year In this equation, il = 3,289 tornadoes, to = 64 years, and A = 165,059 square mile A correction for annual reporting trend is part of the TORMIS methodology. The adjusted occurrence rate to reflect the sub-region reporting trends is 3.58E-04 tornadoes I square mile I year.

2. Tornado Wind Speed Intensity The 1983 SER calls for the use of the F scale of tornado intensity in terms of assigning tornado wind speeds to each intensity category (F1-F5). However, the NRC has adopted the EF scale and confirmed in previous discussions on TORMIS that the EF scale could be used in place of the F scale. The use of the EF scale is consistent with the recently endorsed positions of NRC Regulatory Guide 1.76 that are based on NUREG/CR-4461, Revision 2 (Reference 6).
3. Characterization of Tornado Wind Speed as a Function of Height Above Ground Elevation The TORMIS simulations were performed with the TORMIS rotational velocity Profile 3, which has increased near ground wind speeds over Profile 5, which was used in the 1981 EPRI TORMIS reports (see Attachment 1-2, Figure 5, "Tornado Rotational Wind Velocity Profiles"). Therefore, the Byron Station runs were made with higher near ground wind speeds than in the EPRI study. The sensitivity study was conducted by running the original EPRI profiles (i.e., Profile 5). All 60 replications that contributed to the target group results in Attachment 1 -1, Table 2 were run and compared to the Profile 3 results Boolean group by Boolean group. Note that Figure 5 is a scan of Figure 11-12(b) from Reference 5.

The comparison showed that differences in results were negligible for missile hit (see -2, Figure 6, "Plot of Frequencies with Profile 5 versus Profile 3"). Some sensitivity was observed for targets with very low damage frequencies (i.e., <1.OE-08);

however, differences were negligible when aggregated over the target groups. Hence, the use of Profile 3 produces results comparable to Profile 5.

4. Missile Characterization and Site-Structure Models A detailed plant survey was performed during an outage to quantify the number of potential missiles. The Byron missile survey walkdown was performed by ARA using ARA's plant walkdown procedures. The survey walkdown uses a systematic, documented process to provide input on what missiles are in each missile zone, the minimum and maximum injection heights for all missiles by missile type, the building characteristics for structures in 14 of 32

ATTACHMENT I Evaluation of Proposed Changes the missile zone, and pictures of the missiles and buildings surveyed. This information was developed into the plant modeling inputs for the TORMIS analysis. The mean number of potential missiles simulated for EF5 tornadoes was 238,874, including structural failure missile sources. This number also includes additional missiles in several zones to conservatively anticipate future conditions. The missiles consist of both zone missile and structure origin missiles. The missiles are distributed throughout the plant based on the missile survey. Tornadoes from any direction that strike the plant will interact with numerous missiles within 2500 feet of the targets.

The plant site is described by specifying the geometry, location, and material properties of the structures/components and the location of potential missile sources. Missile sources (buildings, houses, storage areas, vehicles, etc.) are modeled to a distance of approximately 2500 feet in all directions from safety-significant targets. This distance is based on a sensitivity study performed in the original TORMIS research (References 3 and 4). The sensitivity study concluded that missiles beyond 2000 feet did not need to be considered in the risk assessment. This value has been increased to 2500 feet in modern TORMIS analyses to be conservative. This process includes the development of missile origin zones around the plant (shown in Attachment 1-2, Figure 7, "Zone Layout for Byron Station TORMIS Analysis") and surveying the types and quantities of missiles in each zone. The Byron Station missiles include the standard TORMIS missiles in EPRI NP-769 (Reference 4), including structural sections, pipes, wood members, other construction materials, and an automobile category. For each set, the cross-sectional geometry and the missile aspect ratio (Ud) are deterministic.

The structure-origin missiles represent the maximum number of missiles produced given destruction of the buildings. The number of missiles produced from this total inventory depends on the wind speeds (i.e., EF scale) experienced by the building. For example, light damage might be expected in 100 mph winds, while catastrophic failure might occur in 200 mph winds. Research performed in the development of the HAZUS wind model (Reference 7) is used to determine the number of missiles available for each building type for each wind speed level considered in the TORMIS runs. When specific wind fragilities of building components are known, the calculated building fragilities are used to produce the number of available missiles in place of the HAZUS functions.

The HAZUS vulnerability models are based on detailed 3-D modeling of buildings and simulated hurricane winds. For each simulated storm, the wind pressures are estimated over the building envelope. The wind load is then computed for each component and compared to the component resistance. Component failures occur when the load exceeds the resistance. This simulation process is repeated for all components as the storm is tracked by the building for each time step. Internal pressurization of the structure is modeled when the envelope is breached by a missile or a failed opening (window or door).

Table 3.4.5-1 below summarizes the wind speed missile functions, defined at the wind speeds for which TORMIS is typically run to produce missile fragilities in support of License Amendment Requests with the Enhanced Fujita scale wind speeds from the HAZUS research. The damage state for each building type was selected based on sufficient failure to produce structural component missiles. This criteria corresponds to "Damage State 4-Destruction" for all building types except manufactured buildings, where Damage State 3 was determined to be sufficient to produce significant structural missiles.

15 of 32

ATTACHMENT 1 Evaluation of Proposed Changes Table 3.4.5-1 HAZUS Damage State Exceedence Probabilities for EF-Scale Mid-Point Wind Speeds Build#ig TIpe Hazard Dannage Stare Enhanced Wind Speed Onph)

EFO EF1 1

EF:

EF3 EFf EF5 65-85 86-110 1.11-135 136-16i 166-200 2 00- 230 Trailer, Mannfactured Bldg 3

0.01 0.03 0.54 096 1.00 1.00 Wood Framel'Modnlar 4

0.00 0.01 0.12 0.75 0.99 1.00 Masonry Franne 4

0.00 0.01 0.03 035 1.00 1.00 Pre Engr Steel France 4

0.00 0.00 0.02 0.32 0.85 0.98 Engineered France 4

0.00 0.00 0.00 0.03 0.50 0.90 A stochastic missile modeling approach was used to model the numbers of potential missiles at the plant during outage and non-outage conditions. All the postulated missiles at Byron Station were treated as minimally restrained in which each sampled missile is injected near the peak aerodynamic force, thus maximizing the transport range and impact speed and, consequently, the missile hit and damage frequency. A summary of the total missile populations used in TORMIS is given in Table 3.4.5-2 below.

Table 3.4.5-2 Number of Byron Station TORMIS Simulated Missiles (Stochastic Model)

EF'Scate ZoPle origin Sid whore origin ToWJfessBes (Aff Sources) min hfafan h4" hfiin 1&"

A&%

Ain Mean Max EM 32940 37,751 44,173 1586 1,652 1,714 34,639 39,403 45,844 EE2 32,940 37,751 44,179 12,602 13,534 14,386 46,938 51,285 57JO7 EF3 32,940 37,751 44,179 76,343 81,826 8,574 113,073 119,577 128,372 Elv4 32,940 37,751 44,179 155,214 162,8'2.2 17215&J 5

200,571 215 AI EF5 32,940 37,751 44,17-9 193,496 201,173 229,750 238,,874 M401

5. Deviations from the Original EPRI Methodology.

The Byron Station TORMIS analysis was performed by Applied Research Associates, Inc.

(ARA) using TORMIS_14, an updated version of the original EPRI NP-2005 (Reference 5) version of the code.

The TORMIS code is a legacy FORTRAN computer code that has been ported to modern computers and compilers and has had bug fixes and other enhancements since 1981. The updates and enhancements made to TORMIS since 1981 are documented in ARA TORMIS reports and Code Manuals. These changes include: porting the legacy code from mainframe to minicomputer to PC computers, post processing data routines, updates to the random number generation, ensure aerodynamic function of box/beam for C/t greater than 4 to match Figure 3-8 of Reference 4 and replace the exponential tip loss function with an equivalent polynomial (i.e., replaced the exponential function in Equation 3.10 in 16 of 32

ATTACHMENT 1 Evaluation of Proposed Changes Reference 4 with the Hoerner suggested polynomial); enhanced output options; and addressing compiler differences and numerical round-off issues in various functions from the legacy code. All code changes have been checked and verified through comparisons to the preceding version.

Also included in the updates were the replacement of the original mainframe based random number generator with a machine-independent algorithm and re-dimensioning of the code to allow larger numbers of targets and missiles.

The TORMIS code verification includes duplications and comparison to each preceding TORMIS version as well as the original TORMIS Sample Problem in EPRI NP 2005 (Reference 5). These statistical comparisons show that the basic TORMIS code calculational approach produces comparable results to that of the original version.

An enhanced method for evaluating missiles passing through openings, such as pipe penetrations in reinforced concrete walls was used for the Byron Station analysis. This method uses a screening of missile impact conditions to screen-out missile impacts that can obviously not pass through an opening. The screening is done in the processing of the missile impact data without modifying the TORMIS physics engine in the IMPACT subroutine. This calculation approach for pipe penetration type targets was introduced as an option in previous versions of TORMIS and was used in several analyses prior to the Byron Station analysis. This approach provides an additional output option that is conservative for estimating the probabilities of missiles passing through small openings in concrete barriers. Both the TORMIS hit probability and the pipe penetration probability is reported for all such targets where the screening approach is used. The results for individual targets are given in Attachment 1-1, Table 1.

The aforementioned deviations from the original EPRI Methodology were previously discussed in a letter from J. Todd Conner (DTE Energy Company) to the NRC, "Proposed License Amendment to Revise the Fermi 2 Licensing Bases for Protection from Tornado-Generated Missiles," dated January 11, 2013. This proposed license amendment was subsequently approved by the NRC in Fermi 2 Amendment 197, dated March 10, 2014.

There was also a single change made to the code of a purely "software" nature, which was not related to the approved TORMIS physics engine and calculation approach; i.e., the dimensioned number of possible missile types was increased to 24 for evaluation of damage from missile velocity exceedance and pipe penetration pass through. This change was made, verified and exactly reproduces previous TORMIS outputs.

In addition, it should be noted that:

  • TORSCR_MF was updated to accommodate up to 40,000 tornadoes (up from 15,000) to be evaluated for each TORMIS replication.
  • TORSCRMFBNSUnion was created to implement the Boolean failure logic for the Byron Station UHS. It uses the same calculation code as TORSCR_MF, but with an updated Boolean subroutine that includes the combinations necessary to account for redundancy within the Byron Station UHS.

17 of 32

ATTACHMENT I Evaluation of Proposed Changes TORSCR IVIF BNS 256 was created to implement the updated Boolean failure logic for the Byron ~-Station UHS. The UHS failure logic was updated to require 3 of 5 remaining fans in the UHS to survive instead of 2 of 4 fans. It uses the same calculation code as TORSCR_MF, but with an updated Boolean subroutine that includes the 256 possible combinations of 8 mutually exclusive, collectively exhaustive events to account for redundancy within the Byron Station UHS.

3.4.6 Compliance with NRC RIS 2008-14 Criteria Subsequent to the original NRC TORMIS SER (Reference 1), the NRC issued Regulatory Issue Summary 2008-14 (Reference 2) to inform licensees of the NRC's experience with shortcomings identified in submitted licensee TORMIS analyses. The RIS specifically identified items licensees should address to confirm the TORMIS methodology and computer code have been properly applied and implemented. This issues identified in the RIS are presented below.

1.

Licensees did not fully satisfy the first four points identified in the SER approving the TORMIS methodology. Examples include the following:

a.

not providing adequate justification that the analysis used the most conservative value for tornado frequency

b. not including the entire TORMIS missile spectrum defined for use in the TORMIS computer code as appropriate for the plant
c.

not providing adequate explanation for the number and adequacy of tornado simulations and histories

d.

not providing sufficient information regarding the development and use of area ratios

2. Licensees did not fully address the fifth point identified in the SER and explain how the methodology was implemented when the parameters used differed from those specified in the TORMIS methodology. Examples include the following:
a.

inappropriately limiting the number of targets modeled

b.

failing to address missile tumbling when modeling targets

c.

failing to properly consider and use the variance reduction techniques and parameters specified by TORMIS

d.

taking credit for nonstructural members

e.

failing to consider risk significant, non-safety-related equipment

3. Licensees used the TORMIS methodology to address situations for which the methodology was not approved Examples include the following.
a.

proposing the elimination of existing tornado barriers

b. proposing Technical Specifications (TS) changes
c.

proposing plant modifications 18 of 32

ATTACHMENT I Evaluation of Proposed Changes Byron Station considered these observations in the development of the TORMIS analysis and addressed each of them as shown below.

1. a. Justification for Tornado Frequency.

To meet the regulatory requirements for modeling tornado risk, TORMIS uses a statistical approach that considers both broad regions and small areas around the plant. A basic sub-region data set for Byron Station is identified and analyzed. The sub-region data is analyzed to produce the tornado input files needed in TORMIS. Tornado hazard curves are developed using a TORMIS-derived code called TORRISK TORRISK is a specialized version of TORMIS that produces tornado hazard curves distinct from the missile risk analysis features of TORMIS. The TORRISK hazard curves provide control points to ensure that the TORMIS simulations track the Byron Station site-specific hazard curve and are conservative for missile risk analysis.

The tornado frequency value conservatively considers regions around the plant and corrects for reporting trend and tornado classification error and random encounter errors, per the TORMIS methodology (References 3, 4, and 5). The developed tornado hazard curve for Byron Station is conservative when compared to NRC Region I criteria given in NUREG/CR-4461, Revision 2 (Reference 6). A comparison of Byron Station hazard curve (i.e., the "BGS TORMIS Plant" curve) and NUREG/CR-4461 (i.e., the "BGS NUREG EF Point" curve) is shown in Attachment 1-2, Figure 8, "TORMIS Simulation of Byron Station Tornado Hazard for Plant Safety Envelope."

I.b. Spectrum of Missile Considered:

The Byron Station study included the missile spectrum (26 missile aerodynamic subsets) developed for use in TORMIS. A total of 24 missiles were used for Byron Station, including two plant specific missiles. The two plant specific missile types included the precast concrete roof deck panels found on several buildings and the concrete roof pavers located on top of the Turbine Building. The existing metal siding missile was also modified to be plant specific based on the characteristics of the insulated metal siding on the exterior of the Turbine Building.

1. c. Justification for the Number and Adequacy of Tornado Simulations:

A replication approach was used for the simulations. A total of 60 complete TORMIS replications were run with different random number seeds and missile populations. A total of 462 million missile simulations were performed for each replication, for a total of 27.72 billion missile simulations over all 60 replications. The standard deviations (a) of these replications were computed and the standard error (E) in the aggregate mean probability (p) was computed from E = aNn. The 95% confidence bounds in the mean probability were conservatively approximated by p +/- 2-F-. -2, Figure 9, "Target Group Hit and Damage Frequency with Confidence Intervals," plots the two-sided 95% confidence intervals. As an example, the running 95%

two-sided confidence bounds for Group 32 are illustrated in Attachment 1-2, Figure 10, "Convergence Plot for Damage Frequency for Target Group 32 (U2 IVISSV 4)," to 19 of 32

ATTACHMENT I Evaluation of Proposed Changes demonstrate that reasonable statistical convergence had been obtained with 60 replications.

1. d. Use of Area Ratios:

No area ratios have been used as a method to adjust the TORMIS outputs for small targets, based on a ratio of hit probabilities from a large target or surface. A variance reduction approach is available in TORMIS and was used for Byron Station that allows for increasing the volume or size of small targets explicitly within the code. TORMIS applies the input variance reduction weight (ka) in the TORMIS scoring equation. These adjustments are used within TORMIS for the single missile impact probability. They are not used to "ratio down" the multiple missile impact probabilities following a TORMIS simulation. Ratioing down the results at the end of TORMIS is not technically acceptable and can lead to an underestimation of the multiple missile risk.

2.a. Inappropriately Limiting of the Number of Targets Modeled:

The Byron Station TORMIS model includes plant components, identified as necessary to safely shutdown the plant and maintain a shutdown condition, located in areas not fully protected by missile barriers designed to resist impact from design basis tornado missiles.

The Byron Station TORMIS analysis includes 153 potential missile targets (see -1, Table 1).

A number of unprotected targets were reviewed and not included in the Byron Station TORMIS model based on the following criteria:

1. Alternate protected systems or components are available to perform the required function, or
2. Analysis or evaluation to show that a postulated tornado missile impact will not result in the loss of a safe shutdown function.

The following are examples of the equipment not included in the Byron Station TORMIS model with associated justification as documented in an engineering evaluation.

Unprotected safety related components associated with providing river makeup water to the SXCTs are not included in the TORMIS model. The essential service water (SX) makeup pumps are located in the River Screen House which is not protected against tornado missiles. For the case of a tornado impacting the river screen house, the non-safety related onsite deep well pumps are used to provide makeup water (as discussed in UFSAR Section 9.2.5.3.1, "Ultimate Heat Sink Design Basis," and Byron Station Technical Specification 3.7.9, "Ultimate Heat Sink (UHS"). Missile protected check valves are installed in the SX makeup lines to prevent back flow from the SXCT basins to the river screen house. The TORMIS model includes the deep well pump enclosures as a target.

  • The unprotected non-safety related Condensate Storage Tanks (CST) and piping from the CSTs to the AF pumps located in the Turbine Building are not included in the Byron TORMIS model. The safety related essential service water system is used as 20 of 32

ATTACHMENT 1 Evaluation of Proposed Changes the backup suction source for the AF pumps if the CSTs or piping from the CSTs are damaged during a tornado event.

  • The unprotected portion of the safety related Emergency Diesel Generator (EDG) exhaust stacks are not included in the TORMIS model. To prevent loss of diesel availability due to exhaust stack damage, a rupture disc pressure relief device is installed on each diesel exhaust line. This relief device is located inside a missile protected structure.

Each EDG engine is provided with a crank case breather vent line that is routed to the outdoors. Where the lines penetrate the auxiliary building the vent lines could be damaged by tornado missiles blocking the crank case vent path. Design analysis has been completed and demonstrates that the crankcase vent lines can be blocked without adversely affecting the ability of the associated EDG to perform its design function.

The Diesel Oil Storage Tanks (DOST) and EDG Day Tanks contain vent lines which provide a path to allow the tanks to fill and drain without developing excessive internal pressure or vacuum. The vent lines could be crimped by tornado missiles blocking the vent path at the point where they penetrate the auxiliary building. In the event the normal tank vent is blocked, an adequate alternate vent path for the DOSTs and EDG Day Tanks is provided by the DOST overflow lines and the piping that connects the air spaces of the DOSTs and EDG Day Tanks. These alternate vent paths are located inside the auxiliary building and are properly protected from tornado missiles.

  • The normal fill path to the DOSTs is from either the 125,000-gallon or 50,000-gallon, Category II outdoor oil storage tanks utilizing gravity flow. The 125,000-gallon and 50,000-gallon oil storage tanks are not protected from tornado missiles. The outside fill connection is also not protected from tornado missiles. The DOSTs are designed to provide adequate fuel supply for 7 days of post-accident load operation.
  • The AF Pump Diesel Engine Day Tanks contain vent lines which provide a path to allow the tanks to fill and drain without developing excessive internal pressure or vacuum. The vent lines could be crimped by tornado missiles blocking the vent path at the point where they penetrate the auxiliary building. For the Unit 1 AF Pump Diesel Engine Day Tank, if the normal vent path is completely blocked, an adequate alternate vent path would be provided by the tank overflow line to the 1 C DOST. For the Unit 2 AF Pump Diesel Engine Day Tank, a tornado protected alternate vent path was installed. These alternate vent paths are located inside the auxiliary building and are properly protected from tornado missiles.

As discussed in the Section 3.5.2 of the original Byron Station Safety Evaluation Report (SER), although the fuel-handling building is designed to be tornado missile resistant, the rollup freight door which is a large opening in the building is not capable of resisting tornado-missile impact. A tornado or tornado missile could destroy the door and may allow a relatively lightweight missile of large area, such as a steel panel or the door itself to travel inside the fuel-handling building. However, the spent fuel pool is sufficiently far from the door that any resulting tornado missile and debris could not enter the spent fuel pool and cause damage to the spent fuel assemblies or block 21 of 32

ATTACHMENT I Evaluation of Proposed Changes coolant flow. This is due to the low trajectory that the missile would have to follow through the door and toward the fuel pool. Further, it would then be required to turn 900 in order to enter the fuel pool.

An unprotected six inch vent pipe runs from the top of each RWST into the Fuel Handling Building. The loss of RWST vent function (i.e., a missile hit completely crimps the vent and prevents air from entering the tank) has been analyzed to show no adverse impact on the RWST pressure boundary function. The pumps that draw suction from the RWST have been evaluated to show adequate Net Positive Suction Head is available without the vent function.

  • The underground pipe tunnels from the RWSTs to the Auxiliary Building have an outdoor access shaft and hatch. The hatch cover is W thick steel plate that is not designed as a missile barrier. An evaluation determined that no equipment required for safe shutdown would be damaged by tornado missiles that enter the hatch and travel down the access shaft into the pipe tunnel.
  • The SXCT contains non-safety related level transmitters and local staff gauges that provide indication of the water level in the SXCT basins. SXCT basin level indication is not a required function for safe shutdown from a tornado.
  • The deep well pump enclosure covers have a 2-1/2" vent pipe. Damage to the vent pipe would not impact operation of the well water pumps.
  • Doors and ventilation openings between the Auxiliary Building and the Turbine Building below Elevation 451' are protected from tornado missiles by the concrete slabs, various Turbine building concrete walls, and large equipment located on elevations 426' and 401' of the Turbine Building.

It is also worthy to note that other targets were considered and include, for example, buildings that are expected to fail in a tornado and produce missiles (i.e., missile source targets) and buildings that are not assumed to fail during a tornado (such as reinforced concrete structures or heavy steel frames). Targets can be stacked on the top of one another to create, for example, a missile source on top of a safety-significant reinforced concrete building. For each target, the material type and strength are specified for each surface of the target, which is generally modeled as a prismatic box shape. These missile source targets are identified based on the site plans and aerial photos as well as plant walkdowns. Potential missiles generated by missile source buildings are estimated based on the site walkdown and building break-up models.

Missile shielding targets are buildings and other structures that are assumed to not fail in the tornado and provide missile shielding to the safety significant targets. Plant components modeled as shielding targets (also referred to as blockage) are constructed of reinforced concrete that is at least 1 foot thick, or clad with steel plate that is at least one inch thick. For example, the concrete superstructure of the UHS is modeled as a series of missile shielding targets.

TORMIS target worksheets were completed for each safety-significant target. These worksheets are used to document the location, dimensions, material properties, 22 of 32

ATTACHMENT I Evaluation of Proposed Changes references, and special modeling considerations for each of the safety-significant targets.

Each worksheet also includes copies of the photos taken during the target walkdown and three-dimensional CAD representations of the targets as modeled for TORMIS. -1, Table 6, "Sequential Numbering of Safety-Significant, Shielding and Missile Source Targets," contains a list of all of the safety-significant, shielding, and missile source targets included in the Byron Station TORMIS model. Also shown in the table is the target group to which each of the safety-significant targets belongs.

2. b. Consideration of Missile Tumbling:

All safety-significant targets (with the exception of pipe penetrations) were modeled to allow for tumbling missile hits (i.e., offset hits) in accordance with the TORMIS technical reports (References 3, 4, and 5). Pipe penetration targets were not increased in size to reflect tumbling missiles since offset missiles cannot result in penetration of a small opening in a concrete wall.

EPRI TORMIS Report NP-769 (Reference 4) discusses consideration of finite missile size in modeling targets in Section 4.2.3. Since TORMIS tracks the missile as a point, missiles that just miss a target are actually likely to have hit the target by virtue of an "offset" hit.

The analysis in Reference 4 shows that each safety target dimension should be increased by L/8 for each free face or direction, where L is the mean length of the missiles. Each shielding target can be increased by U4 in each free direction. Thus, if a safety target has two free faces in the X direction, its actual X dimension, would be increased by L/8 x 2.

This increase in target size accounts for the potential near misses (which are actually "offset" hits) that are not treated in TORMIS.

The determination of the appropriate offset hit dimension is an iterative process because a TORMIS model of a given plant needs to be run with its plant description and actual missile inventory. This was accomplished for Byron Station by creating a TORMIS model of the plant with an offset hit dimension of 1.5 feet per free edge.

The Byron Station TORMIS analysis conservatively did not increase the size of missile shielding targets for offset hits. This approach produces a conservative result in compliance with the RIS comment on "tumbling missiles."

2.c. Use of Variance Reduction Techniques:

Due to the very large simulation/replication sizes, no variance reduction techniques were used for tornado wind speed, tornado offset, tornado direction, tornado orientation, missile type, missile injection height, missile impact orientation, or trajectory termination. Variance reduction techniques were used for missile zone population and target size (ka by target surface).

2.d. Inappropriate Credit for Non-Structural Members:

The Byron Station TORMIS analysis did not take credit for missile resistance for non-structural members.

23 of 32

ATTACHMENT 1 Evaluation of Proposed Changes 2.e. Failure to Consider Risk Significant, Non-Safety-Related Equipment.,

Plant walkdowns were performed in support of the TORMIS analysis. Risk-significant targets (both safety-related and non-safety-related) were considered. One hundred fifty-three (153) unprotected targets were ultimately identified and are included at the TORMIS analysis target set. Also see discussion under Item 2.a.

3. a. Using TORMIS for the Elimination of Existing Tornado Barriers TORMIS is not being used to propose the elimination of tornado barriers.

3.b. Using TORMIS to Propose TS Changes TORMIS is not being used to propose TS changes.

3.c. Using TORMIS for Plant Modifications TORMIS is not being used to design new plant equipment modifications.

==4.0

REGULATORY EVALUATION==

4.1

Applicable Regulatory Requirements/Criteria The TORMIS methodology was developed to estimate the probability of tornado missile impact and damage to nuclear power plant SSCs. The proposed change to utilize the TORMIS Computer Code for assessing tornado-generated missile protection of unprotected plant SSCs, is consistent with this methodology and the requirements and acceptance criteria specified in the below documents:

  • Electric Power Research Institute Report EPRI NP-768, "Tornado Missile Risk Analysis," May 1978 (Reference 3)
  • Electric Power Research Institute Report EPRI NP-769, "Tornado Missile Risk Analysis - Appendices," May 1978 (Reference 4)
  • Electric Power Research Institute Report EPRI NP-2005 Volumes, I and 2, 'Tornado Missile Risk Evaluation Methodology," August 1981 (Reference 5)
  • NRC Standard Review Plan (SRP) (i.e., NUREG-0800), Section 2.2.3, "Evaluation of Potential Accidents," Revision 2, July 1981 Specific information regarding TORMIS approval and acceptance criteria is contained in the following documents.

NRC TORMIS Safety Evaluation Report The TORMIS methodology (References 3, 4 and 5) has been reviewed and accepted for nuclear power plant tornado missile risk analyses, as documented in the NRC Safety 24 of 32

ATTACHMENT 1 Evaluation of Proposed Changes Evaluation Report (SER) Electric Power Research Institute (EPRI) Topical Reports Concerning Tornado Missile Probabilistic Risk Assessment (PRA) Methodology, dated October 26, 1983 (ML080870291) (Reference 1). The NRC SER concluded that:

"... the EPRI methodology can be utilized when assessing the need for positive tornado protection for specific safety-related plant features. "

The SER also states that licensees using the EPRI approach (i.e., the TORMIS methodology) must consider five specific points and provide the appropriate information. This information is provided in Section 3.4.5 above.

NRC Memorandum on Use of Probabilistic Risk Assessment in Tornado Licensing Actions NRC Memorandum from Harold R. Denton to Victor Stello, "Position of Use of Probabilistic Risk Assessment in Tornado Licensing Actions," dated November 7, 1983 (ML030020331), endorsed the acceptance criteria stated in NUREG-0800, Section 2.2.3. The memorandum states:

"Therefore, the guidance in SRP Section 2.2.3 is applicable to tornado missiles. This guidance, which we will use in our probabilistic tornado reviews, states that an expected rate of occurrence of potential exposures in excess of the 10 CFR 100 guidelines of approximately 10-6 per year is acceptable if, when combined with reasonable qualitative arguments, the risk can be expected to be lower. "

NRC Regulatory Issue Summary 2008-14 The NRC subsequently issued Regulatory Issue Summary (RIS) 2008-14, "Use of TORMIS Computer Code for Assessment of Tornado Missile Protection," dated June 16, 2008. This RIS provided additional guidance on the use of TORMIS for assessing nuclear power plant tornado missile protection. The RIS states that:

"The TORMIS methodology is approved for situations where (1) a licensee identifies existing plant SSCs that do not comply with the current licensing basis for positive tornado missile protection of the plant and (2) it would require costly modifications to bring the plant into compliance with the current licensing basis. "

In addition, the RIS identified specific items licensees should address to confirm the TORMIS methodology and computer code have been properly applied and implemented. This information is presented in Section 3.4.6 above. The RIS also reconfirms that the guidance in SRP Section 2.2.3 is applicable to tornado missiles.

25 of 32

ATTACHMENT I Evaluation of Proposed Changes 4.2 Precedent The NRC previously approved use of the TORMIS methodology for use at the following facilities:

I This amendment is documented in a letter from T. J. Wengert (NRC) to J. H. Plona (DTE Electric Company), "Fermi 2 Issuance of Amendment Re: Revise the Fermi 2 Licensing Basis Concerning Protection from Tornado-Generated Missiles," dated March 10, 2014 (Reference 11).

In this amendment, the NRC specifically approved a number of deviations from the original EPRI methodology (see References 3, 4 and 5). These deviations are similar to the deviations utilized in the Byron Station TORMIS analysis as discussed in Section 3.4.5, Item 5, above. Of particular note, the NRC stated that following:

"An enhanced method was used for evaluating missiles passing through openings such as pipe penetrations in concrete walls, in addition to the standard TORMIS hit probability for such targets. This provides supplemental outputs intended to cover special cases of missiles going through wall openings. "

Donald C. Cook Nuclear Plant. Units 1 and 2 This amendment is documented in a letter from J. F. Stang (NRC) to R. P. Power (Indiana Michigan Power Company), "Donald C. Cook Nuclear Plant, Units 2 and 2 Issuance of Amendments," dated November 17, 2000 (Reference 12).

In this amendment, the NRC explicitly acknowledged that the acceptance criterion established in SRP 2.2.3 of 10-6 per year is applied on a unit-specific basis.

Limerick Generating Station, Units 1 and 2 The use of TORSCR to post-process TORMIS output files and application of the Boolean Logic approach is documented in Technical Report NUS-4507, "Limerick Generating Station Ultimate Heat Sink Extreme Wind Hazard Analysis," dated March 1984 (submitted in Reference 9). This report was accepted by the NRC in NUREG-0991, Supplement No. 3, "Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2," dated October 1984.

In NUREG-0991, Supplement 3, Section 9.2.5, "Ultimate Heat Sink," the NRC documented approval of the Probabilistic Risk Assessment (PRA) analysis results addressing UHS missile protection. The details of the NRC review are contained in Supplement No. 3, Appendix 0, "Technical Evaluation Report, Limerick Generating Station Ultimate Heat Sink Extreme Wind Hazard Analysis," conducted by the National Bureau of Standards on behalf of the NRC. In summary, Appendix 0 concurred with the results presented in Technical Report NUS-4507.

26 of 32

ATTACHMENT I Evaluation of Proposed Changes NUS-4507 was developed by NUS Corporation and Applied Research Associates. NUS-4507, Chapter 2, "Definition of Plant Damage States," describes using TORSCR and a Boolean Logic approach to define the "plant damage states." Section 2.1, "Introduction," states the following:

"The purpose of this section is to define those combinations of targets for which the code TORSCR will estimate the frequency. Thus a plant damage state of interest is an identification of a specific combination of spray pond networks, feeder pipes and cooling towers such that damage to each of the elements constitutes a failure to coo/ ESW and RHRSWII In Section 2.2, "The Plant Damage States," two damage states; i.e., "T" and "V," are defined.

"Damage state V.* At least three out of four spray networks and both cooling towers are damaged. This is failure to provide a heat sink for the ESWS and RHRSWS when both units are operational, "

"Damage state T.* All four spray networks and the Unit 1 cooling tower is damaged. This is failure to provide a heat sink for the ESWS and RHRSWS when only Unit I is operational.

Section 2.2 then notes:

"These two plant damage states, T and V, define the combinations of damage targets that are used as the basis for the probabilistic calculation performed using TORMIS-L and TORSCR. It NUREG-0991, Supplement No. 3, Section 9.2.5, makes the following concluding statement:

"We have reviewed our consultant's TER [Technical Evaluation Report, Appendix 0] and concur with the findings that the estimate of the probability of exceeding 10 CFR Part 100 limits owing to wind effects on the spray pond and the cooling towers will not exceed IE-6 per year. "

4.3

No Significant Hazards Consideration In accordance with 10 CFR 50.90, "Application for amendment of license, construction permit or early site permit," and 10 CFR 50.59, "Changes, tests, and experiments," paragraph (c)(2)(viii),

Exelon Generation Company, LLC, (EGC) requests amendments to Renewed Facility Operating License Nos. NPF-37 and NPF-66 for Byron Station, Units 1 and 2. This amendment request proposes to revise the Byron Station licensing basis for protection from tornado-generated missiles. Specifically, the Updated Final Safety Analysis Report (UFSAR) will be revised to identify the TORMIS Computer Code as the methodology used for assessing tornado-generated missile protection of unprotected plant structures, systems and components (SSCs) and to describe the results of the Byron Station site-specific tornado hazard analysis. The results from the Byron Station TORMIS analysis will be used to credit unprotected equipment for post-tornado safe shutdown. Of particular note, the Essential Service Water Cooling Tower (SXCT) fans and cells that survive a tornado strike will be credited for Ultimate Heat Sink (UHS) cooling as opposed to the original licensing basis that assumed all the unprotected SXCT fans are damaged by tornado-generated missiles. Modifying the UHS licensing basis, and other affected UFSAR sections, will be performed in accordance with 10 CFR 50.59, "Changes, tests and 27 of 32

ATTACHMENT 1 Evaluation of Proposed Changes experiments," upon approval of the proposed amendment. Note that there are no Technical Specifications changes associated with this request.

The Byron Station TORMIS analysis utilizes a probabilistic approach performed in accordance with the guidance described in the NRC TORMIS Safety Evaluation Report dated October 26, 1983, as clarified by Regulatory Issue Summary (RIS) 2008-14, "Use of TORMIS Computer Code for Assessment of Tornado Missile Protection," dated June 16, 2008.

According to 10 CFR 50.92, "Issuance of amendment," paragraph (c), a proposed amendment to an operating license involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not:

(1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) Create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) Involve a significant reduction in a margin of safety.

EGC has evaluated the proposed change for Byron Station, using the criteria in 10 CFR 50.92, and has determined that the proposed change does not involve a significant hazards consideration. The following information is provided to support a finding of no significant hazards consideration.

Criteria

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The NRC TORMIS Safety Evaluation Report states the following:

"The current Licensing criteria governing tornado missile protection are contained in

[NUREG-0800] Standard Review Plan (SRP) Section 3.5.1.4, [Missiles Generated by Natural Phenomena] and 3.5.2 [Structures, Systems and Components to be Protected from Externally Generated Missiles]. These criteria generally specify that safety-related systems be provided positive tornado missile protection (barriers) from the maximum credible tornado threat. However, SRP Section 3.5.1.4 includes acceptance criteria permitting relaxation of the above deterministic guidance, if it can be demonstrated that the probability of damage to unprotected essential safety-related features is sufficiently small. "

As permitted by these SRP sections, the combined probability will be maintained below an allowable level, i.e., an acceptance criterion threshold, which reflects an extremely low probability of occurrence. SRP Section 2.2.3, "Evaluation of Potential Accidents,"

established this threshold as approximately 1.0E-06 per year if, when combined with reasonable qualitative arguments, the realistic probability can be shown to be lower. The 28 of 32

ATTACHMENT 1 Evaluation of Proposed Changes Byron Station analysis approach assumes that if the sum of the individual probabilities calculated for tornado missiles striking and damaging portions of safety-significant SSCs is greater than or equal to 1.0E-06 per year per unit, then installation of tornado missile protection barriers would be required for certain components to lower the total cumulative damage probability below the acceptance criterion of 1.0E-06 per year per unit. Conversely, if the total cumulative damage probability remains below the acceptance criterion of 1.0E-06 per year per unit, no additional tornado missile protection barriers would be required for any of the unprotected safety-significant components.

With respect to the probability of occurrence or the consequences of an accident previously evaluated in the UFSAR, the possibility of a tornado impacting the Byron Station site and causing damage to plant SSCs is a licensing basis event currently addressed in the UFSAR.

The change being proposed (i.e., the use of the TORMIS methodology for assessing tornado-generated missile protection of unprotected plant SSCs), does not affect the probability of a tornado strike on the site; however, from a licensing basis perspective, the proposed change does affect the probability that missiles generated by a tornado will strike and damage certain safety-significant plant SSCs. There are a defined number of safety-significant components that could theoretically be struck and damaged by tornado-generated missiles. The probability of tornado-generated missile hits on these "important" systems and components is calculated using the TORMIS probabilistic methodology. The combined probability of damage for unprotected safety-significant equipment will be maintained below the acceptance criterion of 1.0E-06 per year per unit to ensure adequate equipment remains available to safely shutdown the reactors, and maintain overall plant safety, should a tornado strike occur. Consequently, the proposed change does not constitute a significant increase in the probability of occurrence or the consequences of an accident based on the extremely low probability of damage caused by tornado-generated missiles and the commensurate extremely low probability of a radiological release.

Finally, the use of the TORMIS methodology will have no impact on accident initiators or precursors; does not alter the accident analysis assumptions or the manner in which the plant is operated or maintained; and does not affect the probability of operator error.

Based on the above discussion, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

The impact of a tornado strike on the Byron Station site is a licensing basis event that is explicitly addressed in the UFSAR. The proposed change simply involves recognition of the acceptability of using an analysis tool (i.e., the TORMIS methodology) to perform probabilistic tornado missile damage calculations in accordance with approved regulatory guidance. The proposed change does not result in the creation of any new accident precursors; does not result in changes to any existing accident scenarios; and does not introduce any operational changes or mechanisms that would create the possibility of a new or different kind of accident.

29 of 32

ATTACHMENT I Evaluation of Proposed Changes Therefore, the proposed change will not create the possibility of a new or different kind of accident than those previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No.

The existing Byron Station licensing basis regarding tornado missile protection of safety-significant SSCs assumes that missile protection barriers are provided for safety-significant SSCs; or the unprotected component is assumed to be unavailable post-tornado. The results of the Byron Station TORMIS analysis have demonstrated that there is an extremely low probability, below an established regulatory acceptance limit, that these "important" SSCs could be struck and subsequently damaged by tornado-generated missiles. The change in licensing basis from protecting safety-significant SSCs from tornado missiles, to demonstrating that there is an extremely low probability that safety-significant SSCs will be struck and damaged by tornado-generated missiles, does not constitute a significant decrease in the margin of safety.

Therefore, the proposed change to use the TORMIS methodology does not involve a significant reduction in the margin of safety.

Based on the above, EGC concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92, and accordingly, a finding of "no significant hazards consideration" is justified.

4.4

Conclusions The conservatisms utilized in the TORMIS analysis provides high confidence that the Byron Station mean damage frequency values for each unit are conservatively high and "the risk can be expected to be lower," consistent with the acceptance criteria stated in SRP Section 2.2.3.

The TORMIS methodology has been determined by the NRC (Reference 1) to be conservative with respect to missile risk analysis, provided "the tornado wind velocity ranges assumed in the calculations are defensible given the present state of the art" and "the assumptions concerning the locations and numbers of potential missiles present at the site are plausible." The first provision has been addressed by developing a site-specific tornado wind hazard curve, which considers both local and regional variations in tornado risk. A series of conservative adjustments were then made to the tornado data consistent with the TORMIS methodology.

The second provision has been met by performing a detailed site survey, and conservatively applying the results of that survey to all future operating periods. The site survey was conducted during a plant outage, which increased the numbers of potential missiles at the site.

There are many additional aspects of the TORMIS modeling and inputs that ensure bounding and conservative results.

In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered, by operation in the proposed manner, (2) such activities will be conducted in compliance with the site licensing basis and Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

30 of 32

ATTACHMENT 1 Evaluation of Proposed Changes

==5.0

ENVIRONMENTAL CONSIDERATION==

EGC has evaluated this proposed operating license amendment consistent with the criteria for identification of licensing and regulatory actions requiring environmental assessment in accordance with 10 CFR 51.21, "Criteria for and identification of licensing and regulatory actions requiring environmental assessments." EGC has determined that these proposed changes to utilize the TORMIS Computer Code as the methodology used for assessing tornado-generated missile protection of plant structures, systems and components (SSCs), meet the criteria for a categorical exclusion set forth in paragraph (c)(9) of 10 CFR 51.22, "Criterion for categorical exclusion; identification of licensing and regulatory actions eligible for categorical exclusion or otherwise not requiring environmental review," and as such, has determined that no irreversible consequences exist in accordance with paragraph (b) of 10 CFR 50.92, "Issuance of amendment." This determination is based on the fact that these changes are being proposed as an amendment to the license issued pursuant to 10 CFR 50, "Domestic Licensing of Production and Utilization Facilities," which changes a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, "Standards for Protection Against Radiation," or which changes an inspection or a surveillance requirement, and the amendment meets the following specific criteria:

(i)

The amendment involves no significant hazards consideration.

As demonstrated in Section 4.3, "No Significant Hazards Consideration," the proposed change does not involve any significant hazards consideration.

(ii)

There is no significant change in the types or significant increase in the amounts of any effluent that may be released offsite.

The proposed change does not result in an increase in power level, does not increase the production nor alter the flow path or method of disposal of radioactive waste or byproducts. It is expected that all plant equipment would operate as designed in the event of an accident to minimize the potential for any leakage of radioactive effluents.

The proposed changes will have no impact on the amounts of radiological effluents released offsite during normal at-power operations or during the accident scenarios.

Based on the above evaluation, the proposed change will not result in a significant change in the types or significant increase in the amounts of any effluent released offsite.

(iii)

There is no significant increase in individual or cumulative occupational radiation exposure.

There is no change in individual or cumulative occupational radiation exposure due to the proposed change. Specifically, the change to utilize the TORMIS Computer Code as the methodology used for assessing tornado-generated missile protection of plant SSCs has no impact on any radiation monitoring system setpoints. The proposed action will not change the level of controls or methodology used for processing of radioactive effluents or handling of solid radioactive waste, nor will the proposed action result in any change in the normal radiation levels within the plant.

31 of 32

ATTACHMENT I Evaluation of Proposed

Therefore, in accordance with 10 CFR 51.22, paragraph (b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.

6.0 REFERENCES

1. NRC Safety Evaluation Report, "Electric Power Research Institute (EPRI) Topical Reports Concerning Tornado Missile Probabilistic Risk Assessment (PRA) Methodology,"

dated October 26, 1983 (ML080870291)

2. NRC Regulatory Issue Summary 2008-14, "Use of TORMIS Computer Code for Assessment of Tornado Missile Protection," dated June 16, 2008 (ML080230578)
3. Electric Power Research Institute Report EPRI NP-768, "Tornado Missile Risk Analysis," May 1978
4. Electric Power Research Institute Report EPRI NP-769, "Tornado Missile Risk Analysis - Appendices," May 1978
5. Electric Power Research Institute Report EPRI NP-2005 Volumes, I and 2, 'Tornado Missile Risk Evaluation Methodology," August 1981
6. NUREG/CR-4461, Revision 2, "Tornado Climatology of the Contiguous United States, (PNNL-15112, Rev 2)," Ramsdell and Rishel, 2007
7. FEMA (2007), "Multi-hazard Loss Estimation Hurricane Model, HAZUS MH MR3 Technical Manual"
8. NRC Memorandum from Harold R. Denton to Victor Stello, "Position of Use of Probabilistic Risk Assessment in Tornado Licensing Actions," dated November 7, 1983 (ML080870287)
9. Letter from J. S. Kemper (Philadelphia Electric Company) to A. S. Schwencer (NRC),

"Limerick Generating Station, Analysis of Tornado Missile Effects on Ultimate Heat Sink (SSER Open Issue No 2)," dated March 22, 1984

10. NUREG-0991, Supplement No. 3, "Safety Evaluation Report related to the operation of Limerick Generating Station, Units 1 and 2," dated October 1984.
11. Letter from T. J. Wengert (NRC) to J. H. Plona (DTE Electric Company), "Fermi 2 Issuance of Amendment Re: Revise the Fermi 2 Licensing Basis Concerning Protection from Tornado-Generated Missiles," dated March 10, 2014
12. Letter from J. F. Stang (NRC) to R. P. Powers (Indiana Michigan Power Company), "Donald C. Cook Nuclear Plant, Units 1 and 2 Issuance of Amendments," dated November 17, 2000 32 of 32

ATTACHMENT 1-1 TORMIS Results Tables 1-6 BYRON STATION UNITS 1 AND 2 Docket Nos. 50-454 and 50-455 Renewed Facility Operating License Nos. NPF-37 and NPF-66

Table I TORMIS Results by Individual TORMIS Target (Page I of 4)

Group Number Target Group Target Number Description Failure Mode Crimping Type jifissile Hit Damage I

UHS Riser Pipes I

UHS Riser Pipe

Coll H

lower Perforation N/A 73711-08 5.74E-10 2

UHS Riser Pipe

Coll H

upper V > Vdam Riser Pipe 2.41 E-08 0.00E+00 2

UHS Fan H 3

Cooling Tower Fan Motor - Cell H Missile Hit N/A L71E-06 1.71E-06 4

Gear Box Oil Level Gauge - Coll H Missile Hit N/A 7,66E-08 7.66E-08 5

Personnel Hatch -- Cell H Perforation N/A 1.7113-07 5.68E-10 6

Fan Inspection Hatch - Cell H Perforation N/A 9.66E-08 1.12E-09 7

Fan - Cell H Missile Hit N/A 4.88E-08 4.88E-08 I

UHS Riser Pipes 8

UHS Riser Pipe

Cell G

lower Perforation N/A 1.28E-07 5.45E-09 9

UHS Riser Pipe

Cell G

upper V > Vdam Riser Pipe 5.64E-08 0.00E+00 3

UHS Fan G 10 Cooling Tower Fan Motor - Cell G Missile Hit N/A 3.82E-07 3.82E-07 I I Gear Box Oil Level Gauge - Cell G Missile Hit N/A 8.98E-08 8,98E-08 12 Personnel Hatch -- Coll G Perforation N/A 4.32E-08 4.78E-10 13 Fan Inspection Hatch - Cell G Perforation N/A 2.21E-08 4.09E-10 14 Fan - Cell 0 Missile Hit N/A 5.01E-08 5.01E-08 I

UHS Riser Pipes 15 UHS Riser Pipe

Cell F - Lower Perforation N/A 1.53E-07 4.77E-09 16 UHS Riser Pipe

Cell F - Upper V > Vdam Riser Pipe 7.28E-08 0.00E+00 4

UHS Fan F 17 Cooling Tower Fan Motor - Cell F Missile Hit N/A 4.03E-07 4.03E-07 18 Gear Box Oil Level Gauge - Cell F Missile Hit N/A 5.7513-08 5.75E-08 19 Personnel Hatch -- Cell F Perforation N/A 2.95E-08 3.01E-09 20 Fan Inspection Hatch - Cell F Perforation N/A 9.57E-09 3.52E-10 21 Fan - Cell F Missile Hit N/A 4.25E-08 4.25E-08 I

UHS Riser Pipes 22 UHS Riser Pipe

Cell E

Lower Perforation N/A 4.22E-08 3.26E-09 23 UHS Riser Pipe

Cell E

Upper V > Vdam Riser Pipe 2.78E-08 0.00E+00 5

UHS Fan E 24 Cooling Tower Fan Motor -- Cell E Missile Hit N/A 2.52E-07 2.52E-07 25 Gear Box Oil Level Gauge - Cell E Missile Hit N/A 6.65E-08 6.65E-08 26 Personnel Hatch -- Cell E Perforation N/A 3.6213-08 4.36E-09 27 Fan Inspection Hatch - Coll E Perforation N/A 7.69E-09 6.08E-10 28 Fan - Cell E Missile Hit N/A 4.54E-08 4.54E-08 I

UHS Riser Pipes 29 UHS Riser Pipe - Cell D - Lower Perforation N/A 1.2113-07 8.89E-09 30 UHS Riser Pipe -- Cell D -- Upper V > Vdam Riser Pipe 6.07E-08 0.00E+00 6

UHS Fan D 31 Cooling Tower Fan Motor -- Cell D Missile Hit N/A 7.38E-07 7.38E-07 32 Gear Box Oil Level Gauge - Cell D Missile Hit N/A 5.82E-08 5.82E-08 33 Personnel Hatch -- Cell D Perforation N/A 1.99E-08 1.29E-09 34 Fan Inspection Hatch - Cell D Perforation N/A 7.93E-08 1.7813-08 35 Fan - Cell D Missile Hit N/A 6.23E-08 6.23E-08 1

UHS Riser Pipes 36 UHS Riser Pipe

Cell C -- Lower Perforation N/A 1.1913-07 7.72E-09 37 UHS Riser Pipe

Cell C - Upper V > Vdam -r Riser Pipe 6.5113-08 0.00E+00

finnm TORMIS Results by Individual TORMIS Target (Page 2 of 4)

N Groupr umber Target Group Targ beer t

Nu Description Failure Mode Crimping Type Missile Hit Damage 7

UHS Fan C 38 Cooling Tower Fan Motor - Coll C Missile Hit N/A 8.65E-07 8.65E-07 39 Gear Box Oil Level Gauge - Coll C Missile Hit N/A 6.44E-08 6.44E-08 40 Personnel Hatch -- Coll C Perforation N/A 1.25E-08 1.97E-09 41 Fan Inspection Hatch - Coll C Perforation N/A 9.9113-08 1.90E-08 42 Fan - Coll C Missile Hit N/A 5.78E-08 5.78E-08 I

UHS Riser Pipes 43 UHS Riser Pipe -- Coll B -- Lower Perforation N/A 1.81E-07 1.16E-08 44 UHS Riser Pipe - Coll B - Upper V > Vdam Riser Pipe 7.39E-08 0.00E+00 8

UHS Fan B 45 Cooling Tower Fan Motor - Coll B Missile Hit N/A 3.04E-07 3.04E-07 46 Gear Box Oil Level Gauge - Coll B Missile Hit N/A 3.IIE-08 3.IIE-08 47 Personnel Hatch -- Cell B Perforation N/A 7.31E-08 5.83E-09 48 Fan Inspection Hatch - Coll B Perforation N/A 1.09E-07 2.29E-08 49 Fan - Coll B Missile Hit N/A 6.27E-08 6.27E-08 I

UHS Riser Pipes so UHS Riser Pipe

Cell A --Lower Perforation N/A 2.16E-07 1.38E-08 51 UHS Riser Pipe

Cell A -- Upper V > Vdam Riser Pipe 9.62E-08 0.00E+00 9

UHS Fan A 52 Cooling Tower Fan Motor -- Cell A Missile Hit N/A 9.90E-07 9.90E-07 53 Gear Box Oil Level Gauge - Cell A Missile Hit N/A 4.52E-08 4.52E-08 54 Personnel Hatch -- Cell A Perforation N/A 9.22E-08 6.36E-09 55 Fan Inspection Hatch - Cell A Perforation N/A 1.36E-07 2.39E-08 56 Fan - Cell A Missile Hit N/A 8.04E-08 8.04E-08 10 UHS Anti Vortex Screen 57 Anti-Vortex Trash Screen

South Side Perforation N/A 4.43E-07 2.2513-08 58 Anti-Vortex Trash Screen

North Side Perforation N/A 5J0E-07 2.11E-08 I I UHS Room 232Z 59 Air Intake Louver on UHS Electrical Room

SouthWest Perforation N/A 1.17E-08 3.08E-09 12 UHS Room 132Z 60 Air Intake Louver on UHS Electrical Room

SouthEast Perforation N/A 4.24E-07 4.93E-08 13 UHS Room 231Z 61 Air Intake Louver on UHS Electrical Room

NorthWest Perforation N/A 5.24E-08 8.96E-09 14 UHS Room 131Z 62 Air Intake Louver on UHS Electrical Room

NorthEast Perforation N/A 2.38E-09 9.75E-11 15 U1 DAFP 63 Diesel Auxiary Feed Pump Exhaust Ul

Pipe V > Vdam DAFP Pipe 4.91E-06 3.62E-10 64 Diesel Auxiary Feed Pump Exhaust Ul

Cover Plate V > Warn DAFP Cover Plate 4.13E-06 3.15E-07 16 U2 DAFP 65 Diesel Auxiary Feed Pump Exhaust U2

Pipe V > Warn DAFP Pipe 5.29E-06 2.19E-10 66 Diesel Auxiary Feed Pump Exhaust U2

Cover Plate V > Vdam DAFP Cover Plate 4.59E-06 3.76E-07 17 Ul PORV 67 Ul - SE PORV Tailpipe - crush V > Vdam PORV 5.98E-07 3.56E-10 68 Ul - SE PORV Tailpipe -PP Pipe Penetration N/A 4,90E-07 3.05E-10 18 Ul PORV 69 Ul - SE PORV Tailpipe - crush V > Vdam PORV 2.04E-07 1.57E-11 70 Ul - SE PORV Tailpipe -PP Pipe Penetration N/A 2.25E-07 1.99E-10 19 Ul PORV 71 Ul - SW PORV Tailpipe - crush V > Vdam PORV 4.03E-07 8.64E-11 72 Ul - SW PORV Tailpipe - PP Pipe Penetration N/A 1.92E-07 8.07E-10 20 Ul PORV 73 Ul - SW PORV Tailpipe - crush V > Vdam PORV 1.41E-06 1,34E-10 74 Ul - SW PORV Tailpipe - PP Pipe Penetration N/A 1.66E-07 1.72E-10 21 U2 PORV 75 U2 - NE PORV Tailpipe - crush V > Vdam PORV 3.87E-07 9.58E-11 76 U2 - NE PORV Tailpipe - PP Pipe Penetration N/A 2.77E-07 5.07E-I I 22 U2 PORV 77 U2 - NE PORV Tailpipe - crush V > Vdam PORV 1,25E-06 3.90E-10 78 U2 - NE PORV Tailpipe - PP Pipe Penetration N/A 6.311-07 6.611-11

Table 1 TORMIS Results by Individual TORMIS Target (Page 3 of 4)

Group Number 79 Target Group Numhe Description Failure Mode Crimping 7)pe Missile Nit Damage 23 U2 PORV U2 - NW PORV Tailpipe - crush V > Vdam PORV 5.37E-07 1.06E-10 80 U2 - NW PORV Tailpipe - PP Pipe Penetration N/A 1.58E-07 3.22E-10 24 U2 PORV 81 U2 - NW PORV Tailpipe - crush V > Vdam PORV 7.47E-07 2.79E-10 82 U2 - NW PORV Tailpipe - PP Pipe Penetration N/A 2.23E-07 1.96E-10 25 UI MSSV 83 U1 - SE MSSV Tailpipe Group - PP 1 Pipe Penetration N/A 6,66E-07 5.11E-10 84 UI - SE MSSV Tailpipe Group - PP 2 Pipe Penetration N/A 5.50E-07 2.29E-10 85 UI - SE MSSV Tailpipe Group - PP 3 Pipe Penetration N/A 5.23E-07 2.03E-10 86 U1 - SE MSSV Tailpipe Group - PP 4 Pipe Penetration N/A 7.35E-07 4.89E-10 87 UI - SE MSSV Tailpipe Group - PP 5 Pipe Penetration N/A 6.36E-07 4.71E-11 26 U1 MSSV 88 UI - SE MSSV Tailpipe Group - PP 1 Pipe Penetration N/A 3.48E-07 2.03E-10 89 UI - SE MSSV Tailpipe Group - PP 2 Pipe Penetration N/A 3.61E-07 2.78E-11 90 UI - SE MSSV Tailpipe Group - PP 3 Pipe Penetration N/A 3.34E-07 3.51E-11 91 U1 - SE MSSV Tailpipe Group - PP 4 Pipe Penetration N/A 2.89E-07 3,01E-11 92 UI - SE MSSV Tailpipe Group - PP 5 Pipe Penetration N/A 3.02E-07 1.08E-11 27 U1 MSSV 93 Ul - SW MSSV Tailpipe Group - PP 1 Pipe Penetration N/A 1.69E-07 2.72E-10 94 UI - SW MSSV Tailpipe Group - PP 2 Pipe Penetration N/A 1.69E-07 2.26E-09 95 Ul - SW MSSV Tailpipe Group - PP 3 Pipe Penetration N/A 1,97E-07 2.46E-09 96 UI - SW MSSV Tailpipe Group - PP 4 Pipe Penetration N/A 1.68E-07 2.46E-10 97 UI - SW MSSV Tailpipe Group - PP 5 Pipe Penetration N/A 1.71E-07 5.52E-10 28 Ul MSSV 98 UI - SW MSSV Tailpipe Group - PP 1 Pipe Penetration N/A 1.68E-07 9.86E-11 99 Ul - SW MSSV Tailpipe Group - PP 2 Pipe Penetration N/A 1.53E-07 2.20E-10 100 Ul - SW MSSV Tailpipe Group -PP 3 Pipe Penetration N/A 1.67E-07 1.48E-10 101 U1 - SW MSSV Tailpipe Group - PP 4 Pipe Penetration N/A 1.58E-07 1.20E-10 102 Ul - SW MSSV Tailpipe Group - PP 5 Pipe Penetration N/A 1.80E-07 1.72E-10 29 U2 MSSV 103 U2 - NE MSSV Tailpipe Group - PP 1 Pipe Penetration N/A 3.46E-07 8.57E-11 104 U2 - NE MSSV Tailpipe Group - PP 2 Pipe Penetration N/A 3.68E-07 1.99E-10 105 U2 - NE MSSV Tailpipe Group - PP 3 Pipe Penetration N/A 3.72E-07 7.89E-11 106 U2 - NE MSSV Tailpipe, Group - PP 4 Pipe Penetration N/A 2.87E-07 3.14E-11 107 U2 - NE MSSV Tailpipe Group - PP 5 Pipe Penetration N/A 2.78E-07 1.68E-10 30 U2 MSSV 108 U2 - NE MSSV Tailpipe Group - PP I Pipe Penetration N/A 5.63E-07 1.22E-10 109 U2 - NE MSSV Tailpipe Group - PP 2 Pipe Penetration N/A 6.64E-07 5.36E-10 110 U2 -NE MSSV Tailpipe Group -PP 3 Pipe Penetration N/A 7.83E-07 1.58E-10 111 U2 -NE MSSV Tailpipe Group -PP 4 Pipe Penetration N/A 6.98E-07 7.IOE-11 112 U2 - NE MSSV Tailpipe Group - PP 5 Pipe Penetration N/A 8.35E-07 2.58E-10 31 U2 MSSV 113 U2 - NW MSSV Tailpipe Group - PP 1 Pipe Penetration N/A 1.52E-07 3.15E-10 114 U2 - NW MSSV Tailpipe Group - PP 2 Pipe Penetration N/A 1.65E-07 1.98E-10 115 U2 - NW MSSV Tailpipe Group - PP 3 Pipe Penetration N/A 1.72E-07 9.65E-I I 116 U2 - NW MSSV Tailpipe Group - PP 4 Pipe Penetration N/A 1.56E-07 7.61E-1 I 117 U2 - NW MSSV Tailpipe Group - PP 5 Pipe Penetration N/A 1.60E-07 9.04E-11

Table I TORMIS Results by Individual TORMIS Target (Page 4 of 4)

Group Number Target Group Target Number Description Failure Mode Crimping Ty pe Missile Ifil Damage 32 U2 MSSV 118 U2 - NW MSSV Tailpipe Group - PP I Pipe Penetration N/A 2.01E-07 4.32E-10 119 U2 - NW MSSV Tailpipe Group - PP 2 Pipe Penetration N/A 1.97E-07 1.68E-10 120 U2 - NW MSSV Tailpipe Group - PP 3 Pipe Penetration N/A 2.03E-07 1.13E-10 121 U2 - NW MSSV Tailpipo Group - PP 4 Pipe Penetration N/A 2.14E-07 1.46E-10 122 U2 - NW MSSV Tailpipe Group - PP 5 Pipe Penetration N/A 2.20E-07 5.06E-10 33 Deepwall Enclosures 123 Deopwall Enclosure ill Span N/A 1.46E-05 4.09E-09 124 Deepwoll Enclosure #2 Spall N/A 1.11E-05 2.16E-08 14 UHS Room 131Z 125 Div I I Embedded Conduits in South Wall of Aux Bldg Perforation N/A 3.33E-05 3.22E-09 13 UHS Room 231Z 126 Div 21 Embedded Conduits in South Wall of Aux Bldg Perforation N/A 3.00E-05 2.45E-09 12 UHS Room 132Z 127 Div 12 Embedded Conduits in South Wall of Aux Bldg Perforation N/A 1.20E-05 1.57E-09 I I UHS Room 232Z 128 Div 22 Embedded Conduits in South Wall of Aux Bldg Perforation N/A 1.64E-05 2.90E-09 129 Cable Vault 2H2 -- Div 22 Spall N/A 3.60E-06 1.16E-08 12 UHS Room 1322 130 Cable Vault 1112 - Div 12 Spall N/A 3.05E-06 3.59E-09 13 UHS Room 231Z 131 Cable Vault 2G1 --Div 21 Span N/A 3.04E-06 5.08E-09 14 UHS Room 131Z 132 Cable Vault I G I -- Div I1 Spall N/A 3.14E-06 1.08E-08 I I UHS Room 232Z 133 Cable Vault 2.12

Div 22 SPOU N/A 1.70E-06 5.44E-10 12 UHS Room 132Z 134 Cable Vault IJ2

Div 12 Spall N/A 1.18E-06 6.64E-10 34 U1 RWST Hatch 135 Unit I RWST Hatch Missile Hit N/A 2.45E-07 2.45E-07 35 U2 RWST Hatch 136 Unit 2 RWST Hatch Missile Hit N/A 2.39E-07 2.39E-07 36 UI L-Line Wall Targets 137 Ul Division 2 MEER Opening Pipe Penetration N/A 1.60E-06 3.48E-09 138 UI Division I MEER Opening Pipe Penetration N/A 1.56E-06 6.43E-08 139 UI Control Room HVAC Intake Opening Pipe Penetration N/A 7.22E-07 4.00E-10 37 U2 L-Line Wall Targets 140 U2 Control Room HVAC Intake Opening Pipe Penetration N/A 7.30E-07 1.50E-09 141 U2 Division I MEER Opening Pipe Penetration N/A 1.64E-06 6.00E-08 142 U2 Division 2 MEER Opening Pipe Penetration N/A 1.67E-06 8.87E-09 39 Div 11 and 21 Conduits in Non-ESF Room 143 Conduits in Non-ESF Switchgear Room - Segment I Perforation N/A 1.63E-09 1.71E-11 144 Conduits in Non-ESF Switchgear Room - Segment 2 Perforation N/A 3.18E-09 9.92E-12 145 Conduits in Non-ESF Switchgear Room - Segment 3 Perforation N/A 4.28E-08 3.64E-10 146 Conduits in Non-ESF Switchgear Room - Segment 4 Perforation N/A 3.13E-07 4.62E-10 147 Conduits in Non-ESF Switchgear Room - Segment 5 Perforation N/A 2.24E-06 1.21E-10 148 Pipe East of Non-ESF Room Opening - Segment I Perforation N/A 1.56E-05 1.80E-10 149 Pipe East of Non-ESF Room Opening - Segment 2 Perforation N/A 1.95E-05 4.42E-10 36 UI L-Line Wall Targets 150 Pipe East of UI Division 2 MEER Opening Perforation N/A 4.94E-05 1.63E-09 151 Pipe East of U I Division I MEER Opening Perforation N/A 3.85E-05 1,03E-09 37 U2 L-Line Wall Targets 152 Pipe East of U2 Division I MEER Opening Perforation N/A 3.87E-05 1.62E-09 153 Pipe East of U2 Division 2 MEER Opening Perforation N/A 4.99E-05 2.30E-09 Zero entries mean no successful hits or damages in the simulations.

Table 2 Average Hit and Damage Frequency (per year) for Target Groups Group Number Target Group Failure Logic Missile Flit Damage 1

UHS Riser Pipes 1 U 2 U 8 U 9 U 15 U 16 U 22 U 23 U 29 U 30 U 36 U 37U43U44 U50U51 1.41E-06 5.60E-08 2

UHS CeE H 3 U 4 U S U 6 U 7 2.07E-06 1.83E-06 3

UHS Ce11 G IOU 11 U 12 U13 U14 5.79E-07 5.15E-07 4

UHS Cell F 17 U 18 U 19 U 20 U 21 5.39E-07 5.04E-07 5

UHS Cell E 24 U 25 U 26 U 27 U 28 4.06E-07 3.68E-07 6

UM CeRD 31 U 32 U 33 U 34 U 35 9.42E-07 8.67E-07 7

UHS Cell C 38 U 39 U 40 U 41 U 42 1.08E-06 9.96E-07 8

UHS Cell B 4S U 46 U 47 U 48 U 49 5.73E-07 425807 9

UHS CeUA 52 U 53 U 54 U S5 U 56 131E-06 1.13E-06 10 UHS Anti Vortex Screen 57 U S8 9.40E-07 436E-08 11 UHS Room 232Z 59 U 128 U 129 U 133 2.13E-05 1.81808 12 UHS Rcom 132Z 60 U 127 U 130 U 134 1.64E-05 5.51E-08 13 UHS Rcom 2312 61 U 126 U 131 327E-05 1.65E-08 14 UHS Room 131Z 62 U 125 U 132 3.62E-05 1.41E-08 15 U1 DAFP 63 U 64 855E-06 3.16E-07 16 U2 DAFP 6S U66 933E-06 3.77E-07 17 U1 PORV 1 67 U 68 1.08E-06 6.61E-10 18 U1 PORV 2 69 U 70 4.28E-07 2.14E-10 19 U1 PORV 3 71 U72 595807 8931`10 20 U1 PORV 4 73 U74 1.57E-06 3.06E-10 21 U2 PORV 1 7S U 76 6.61E-07 1.46E-10 22 U2 PORV 2 77 U 78 1.87E-06 4-571=10 23 U2 PORV 3 79 U 80 694E-07 429E-I0 24 U2 PORV4 81 U 82 9.64E-07 4.758.10 25 Ul MSSV 1 83 U 84 U 85 U 86 U 87 3.00E-06 1.48E-09 26 Ul MSSV 2 88 U 89 U 90 U 91 U 92 1.62E-06 3.07E-10 27 U1 MSSV 3 93 U 94 U 95 U 96 U 97 8.70E-07 5.79809 28 Ul MSSV4 98 U 99 U 100 U 101 U 102 823E-07 759810 29 U2MSSV 1 103 U 104 U 105 U 106 U 107 1.63E-06 5.63810 30 U2 MSSV 2 108 U 109 U 110 U 111 U 112 3.39E-06 1.15E-09 31 U2MSSV3 113 U 114 U 115 U 116 U 117 7.97E-07 7.76810 32 U2MSSV4 118 U 119 U 120 U 121 U 122 1.02E-06 136E-09 33 DeepmeR Enclosures and Associated Conduits 60 U 62 U 123 U 124 U 125 U 127 U 130 U 132 U 134 U 143 U 144 U 145 U 146 U 147 U148U149 1.00E-04 9.64E-08 34 Ul RWST Hatch 135 2.45E-07 2.45E-07 35 U2 RWST Hatch 136 239E-07 2.39E-07 36 U1 L-Line WaR Targets 137 U 138 U 139 U 150 U 151 8.57E-05 7.08E,08 37 M-line Wall Targets 140 U 141 U 142 U 1S2 U 1S3

&63E-05 7.42E-08 38 Div 11 and 21 Conduits in Non-ESF Room 143 U 144 U 145 U 146 U 147 U 148 U 149 3.65E-05 1.60E-09

Table 3 Individual Failure Events Considered in UHS Boolean Sample Space Event D

friar reaKre Logic One w more uaigae coo pon aft of Cel H fags by and niss&. Note 1

that faire of ekehical r oan 2322 is a separate event as its failure 3 U 4 U 5 U 6 U 7 affiecks Cep G and H.

One or more unique components of Cal D fi& by and missile. Note 2

that fialme of electrical room 2312 is a separate event as its ful re 31 U 32 U 33 U 34 U 35 meets Cells C and D.

One or move u 'I

components of Cel C fa is by wnd missile. Note 3

that f alwe, of elechical room 2312 is a separate event as its fame 38 U 39 U 40 U 41 U 42 affects Cells C and D.

Electrical ream 2312 (nclw*g embedded coochid5 and cable vaukil 4

fats by and missile leads to f Aze of Cels C and D.

bI U 126 U 131 One or move unique conVoneals of Cel A, auehbdimig electricalroam 5

131Z (ixhmft embedded c

and cable faults), fal by and 52 U 53 U 54 U 55 U 56 U 62 U 125 U 132 rnssiie..

6 Either anti-vartea box or any of the 19 riser pipes fi~ by vriod masstle. 1U2U8U9U15U16U22U23U29U30U36U37U43 u 44 u SD u 51 u 57 u 58 7

Bechical room 232Z (ncl xrmg embedded conduits and cable vaulsl 59 U 128 U 129 U 133 his by wind mssille leads to falum of Cells G and H.

One or mode unique comWaeats of Cel G fads by wind nassile. Note 8

that f Lilwe of electrical rom 2322 is a separate event as its fame 10 U I I U 12 U 13 U 14 affects Cells G and H.

Table 4 Space of 266 Possible Failure Combinations of UHS (Page 1 of 6)

OWN M

Table 4 Space of 256 Possible Failure Combinations of UHS (Page 2 of 6) 1EM M Emma M

Table 4 Space of 256 Possible Failure Combinations of UHS (Page 3 of 6) cow" ration Nun*or Fan H Fan D Fan C Room 2312 (Fails C i D)

Fan A (with Room 1312) e Risers and 2 Anti vortex Roan 232C (Falls G a H)

Fan G 1 Cell Out of Service Case 2 Gells Qut o~ Setvfae Case Frequency (yell) 66 0

i 0

1 0

0 1

0 Fail Fail 0.40E+00 67 0

l 0

1 D

0 D

1 Fail Survive 9.10E-12 68 0

1 0

0 1

0 0

Fai I Fai I 1.41E-09 69 0

1 0

0 1

0 1

1

0 Fail Fail 2.38E-11 70 0

1 0

0 1

0 0

1 Fail Survive 5.34E-09 71 0

1 0

0 0

1 1

0 Fail Fail 0.00E+00 72 0

1 0

0 0

1 0

1 Fail Fail 3.00E-10 73 0

1 0

0 0

0 1

1 Fail Survive 0.00E+00 74 0

0 1

1 1

0 0

0 Fall Fail 9.85E-11 75 0

0 1

1 0

1 0

0 Fall Fall O.00E+00 75 0

0 1

0 0

1 0

Fail Fail O.DOE+00 77 0

0 1

1 0

0 O

1 Fail Survive 1.42E-11 78 0

0 1

0 1

1 0

0 Fail Fail 6.03E-10 79 0

0 1

0 1

0 1

0 Fail Fail 6.90E-13 80 0

0 1

0 1

0 0

1 Fail Survive 6.94E-09 81 0

0 1

0 0

i 1

0 Fai I Fail 0.00+00 82 0

0 1

0 0

1 0

i Fail Fail 640E-10 83 0

0 i

0 0

0 1

1 Fail Survive 7.98E-11 84 0

0 0

1 1

1 0

0 Fail Fail 3.36E-11 85 0

0 0

1 1

0 1

0 Fail Fail O.00E+00 86 0

0 0

1 1

0 0

1 Fail Fail 145E-11 87 0

0 0

1 0

1 1

0 Fai I Fail 0.00E+00 88 0

0 0

1 0

1 0

1 Fall Fall 7.54E-14 89 0

0 0

1 0

0 1

1 Fai I Fail D-OOE+00 90 0

0 0

0 1

1 1

1 0

Fail Fail O.00E+00 91 0

0 0

0 1

1 0

1 Fail Fail 5.83E-10 92 0

0 0

0 1

0 1

1 Fail Survive 0.00E+00 93 0

0 0

0 0

1 1

1 Fail Fail 0-00E+00 94 1

1 1

1 0

0 0

0 Fail Fail D.00E+00 95 1

1 1

0 1

1 0

0 0

Fail Fail 2.OBE-09 1

1 1

0 0

1 0

0 Fai l Fail

&79E-11 97 1

1 1

0 0

0 1

0 Fai I Fai I 116E-12 90 1

1 0

0 0

0 1

Fail Fail 9.34E-10 99 1

1 0

1 1

0 0

0 Fail Fait 169E-12 100 1

1 0

1 0

i 0

0 Fail Fail O.00E+00 S[}1 1

1 0

1 0

0 1

0 Fail Fail 0.00E+00 102 1

1 0

1 0

0 0

1 1

Fail Fail 2-OOE-15 103 1

1 0

0 1

i 0

0 Fail Fail JOIE-10 UK 1

0 0

1 0

1 0

Fail Fail O_DOE+00 ID5 1

1 0

0 1

0 0

1 Fai I Fai I 679E-10 106 1

1 0

0 0

i 1

0 Fail Fail 0.00E+00 107 1

1 0

0

1 0

0 1

Fail Fai I 7.99E-11 108 1

1 0

0 0

0 1

1 Fail Survive 0.00E+00 109 0

1 i

1 0

0 0

Fail Fail 125E-12 110 1

0 r

1 0

1 0

0 Fail Fail 0.00E+00 111 1

0 1

1 0

0 1

0 Fail Fail 0.00E+00 112 1

0 1

1 0

0 0

1 Fail Fail O.00E+00 113 I0 1

0 1

1 0

0 Fail Fail 213E-10 114 1

0 1

0 1

0 1

0 Fail Fail 0.00E+00 115 0

1 0

1 0

0 1

Fail Fail 109E-09

Table 4 Space of 256 Possible Failure Combinations of UHS (continued)

(Page 4 of 6)

Combination Number Fan H Fan D Fan C Room 2312 (Falls C &

D)

Fan A (wit}

Room 1312) 8 Risers and 2 ATV8 Vortex R4uom 2322 (Fails G

& H)

Fan G 1 Cdl Out of Service Case 2 Cells Out of Service Case FreWenvy (yn`'~

116 1

0 1

0 0

1 1

0 Fai I Fall 0.00E+00 117 1

0 1

0 0

1 0

1 Fail Fail 9.445E-11 118 1

0 1

0 0

0 1

1 Fail Survive 1.01E-11 119 1

0 0

1 1

1 0

0 Fall Fail 0.00E+00 120 1

0 0

1 1

0 1

0 1

Fai I Fai 1 0.00E+00 121 1

0 0

1 1

0 0

1 Fai I Fai I O.O(E+00 122 1

0 0

1 0

1 1

0 Fail Fail O.00E+00 123 1

0 0

1 0

1 0

1 Fail Fail 0.00E+00 124 1

0 0

1 0

0 1

1 Fall Fail 0.00E+00 125 1

0 0

0 1

1 1

0 Fai I Fail 0.00E+400 126 1

0 0

0 1

1 D

1 Fail Fail 4.60E-11 127 1

0 0

0 1

0 1

1 Fail Survive 0.00E+00 128 1

0 0

0 0

1 1

1 FafI Fail O.00E+00 129 0

1 i

I 1

0 0

0 Fail Fail 1.76E-12 130 0

1 1

1 0

1 0

0 Fail Fail O.00E+OD 131 0

1 1

1 0

0 1

0 Fail Fail O.00E+OD 132 0

1 1

1 0

0 0

1 Fail Survive 3.28E-12 133 0

1 1

0 1

1 0

0 Fail Fail 3.59E-10 134 0

1 i

0 1

0 1

0 Fail Fail L76E-11 135 0

1 1

0 1

0 0

1 Fai I Fail 2.15E-09 136 0

1 1

0 0

1 1

1

0 Fail Fail 0.00E+00 137 0

1 1

0 0

1 0

1 Fall Fail L60E-10 138 0

1 1

0 0

0 1

1 Fail Fail O.00E+W 139 0

1 0

1 1

1 0

0 Fail Fail L12E-11 140 0

1 0

1 1

0 1

0 Fail Fail O.00E+00 141 0

1 0

1 1

0 0

1 Fail Fail 1.68E 13 142 0

1 0

1 0

1 1

0 Fail Fail QO(E+00 143 0

1 0

1 0

1 0

1 Fai I Fall 3.37E-11 144 0

1 0

1 0

0 1

1 Fail Fail QO(E+OD 145 0

1 0

0 1

1 1

0 Fai I Fail O.00E+OD 146 0

1 0

0 1

i0 1

Fail Fail 5.41E-10 147 0

1 0

0 1

0 1

FaiI Fail O.O(E+00 148 0

1 0

0 0

1 1

i Fail Fail OLOOE+OD 149 0

1 0

1 1

1 1

0 0

Fail Fail OUOQE+OD 150 0

0 1

1 1

0 1

0 Fail Fail O.00E+OD 351 0

0 1

1 1

0 0

1 Fail Fail 0.00E+00 152 0

0

?

1 0

1 0

Fail Fail O.00E+OD 153 0

0 1

1 0

1 0

1 Fail Fail O.00E+OD 154 0

0 1

1 0

0 1

Fail Fail 0.00E+0D 155 0

0 1

0 1

1 1

0 Fall Fail O.00E+OD 156 0

0 2

0 1

1 0

Fail Fail 137E-10 157 0

0 1

0 1

0 1

Fait Fail O.00E+00 358 0

0 i

0 0

1 1

1 Fail Fail aOOE40D 159 0

0 0

1 1

11 0 Fail Fail QO(E+OD 160 0

0 0

1 1

1 0

Fail Fail 0.00E+00 161 0

0 0

1 1

0 1

1 Fail Fail O.00E+00 162 0

0 0

1 0

1 1

1 Fail Fail OAXE+OD 163 0

0 0

0 1

1 1

Fail Fail O.00E+00 164 1

1 1

1 0

0 0

Fail Fail O.00E+00 165 1

1 1

0 1

0 0

Fail Fail CLOOE40D

Table 4 Space of 256 Possible Failure Combinations of UHS (Page 5 of 6)

Cocnbinadon Number Fan H Fan D Fan C Room 2312 (Fails C i

0)

Fen A (whh R000m 131Z) 9 Risen and 2 And Vodex Room 2322 (Fails G

& H)

Fan G i Ceit out of 5srvlce Case 2 Cells Out of Service Case Frequency (ye')

166 1

1 1

1 O

0 1

0 Fail Fail O-00E+00 167 1

1 1

I 0

0 0

Fail Fall 0.00E+00 168 1

1 1

0 1

1 0

0 Fail Fail 1.67E-12 169 1

1 1

0 1

0 1

1

0 Fall Fail 0.00E+0O 170 1

1 1

0 1

0 0

1 1

Fail Fall 4.37E-10 171 1

1 1

0 0

1 1

0 Fail Fail O.DOE+00 172 1

1 1

0 0

1 0

i Fall Fail 1.80E-11 173 1

1 1

0 0

0 1

1 Fall Fail O-00E+00 174 1

1 0

1 1

1 0

0 Fail Fall MOOE+00 175 I 1

1 0

1 1

0 1

0 Fall Fall 0.00E+00 176 1

1 0

1 1

0 0

1Fall Fail 2.50E-11 177 1

1 0

1 0

1 1

0 Fall Fail 0.00E+00 178 1

1 0

1 0

1 0

i Fail Fail 0.00E+00 179 1

1 0

1 0

0 1

1 Fail Fail O-OOE+00 180 1

1 0

0 1

I 1

0 Fall Fail 0.00E+00 181 1

1 0

0 1

i 0

1 Fail Fail 0.00E+00 182 1

1 0

0 1

0 1

1 Fail Fail 0.00E+00 1B3 1

1 0

0 0

i 1

1 Fail Fail 0.00E+00 SSA 1

0 1

1 1

1 0

0 Fail Fai I 0.00E+00 IBS 1

0 1

1 1

0 1

0 Fail Fail 0.00E+0E}

186 1

0 1

1 1

0 0

i Fall Fail 0.00E+00 187 1

0 1

1 0

1 1

0 Fail Fail 0.00E+00 188 1

0 1

1 0

1 0

1 Fall Fai I 0.00E+00 189 1

0 1

1 O

0 1

1 Fail Fail 0.00E+00 190 1

0 1

0 1

1 1

0 Fail Fail 0.00E+00 191 1

0 1

0 1

1 0

1 Fail Fai I L07E-11 192 1

0 1

0 1

0 1

1 Fail Fail 0.00E+00 193 1

0 1

0 0

1 1

1 Fai I Fai 1 0.00E+00 194 1

0 0

1 1

1 1

0 Fail Fai I O-00E+00 195 1

0 0

1 1

1 0

1 Fail Fail O.00E+OQ 196 1

0 0

1 1

0 i

Fail Fail 0.00E+00 197 1

0 0

1 0

1 1

1 Fail Fail O-00E+00 198 1

0 0

0 1

1 1

Fail Fail 0.00E+00 199 0

1 1

1 1

1 0

0 Fall Fail 0.00E+00 200 0

1 1

I 1

0 1

0 Fail Fail 0_DOE+00 201 0

I 1

1 0

0 1

Fail Fail 4.46E-11 202 0

2 1

0 i

i 0

Fail Fail 0.00E+00 203 0

1 i

1 0

1 0

Fail Fail 0.00E+00 204 0

1 I0 0

1 1

Fail Fail O.DOE+00 205 0

1 0

1 1

0 Fail Fail 0.00E+0E}

206 0

1 0

1 1

0 Fail Fail 8.59E-17 207 0

i 0

1 0

1

=

Fail Fail 0.00E+00 208 0

1 0

0

?

Fail Fail 0.00E+00 2D9 Q

1 0

I 1

i 1

0 Fail Fail 0.00E+00 210 Q

1 Q

1 1

0 1

Fail Fall 0.00E+00 211 0

1 0

1 1

0 1

1 Fai I Fail 0.00E+00 212 0

2 Q

1 0

i1 i Fail Fail 0.00E+00 213 Q

1 0

0 1

1 1

Fail Fai!

0.00E+0O 214 0

0 1

1 1

i 0

Fail Fail 0.00E+00 215 0

0 I

1 1

0 I

Fail Fail O.00E+OD

Table 4 Space of 256 Possible Failure Combinations of UHS (Page 6 of 6)

Con"na ion Number Fan H Fan 0 Fan C Room 2312 (Fails C &

0)

FanA

( oith Room 1312) 8Risers and 2 Anti Vortex Room 2322 (Fails G

& H)

Fan G 1 Crll Out of Service rat 2 Cells Ctut of Service Case Frequency (ye')

216 0

0 1

1 1

0 1

1 Fail Fail 0.00E+00 217 0

0 11 0

1 1

1 Fai I Fall 0.00E+00 218 0

0 1

0 1

1 1

1 Fail Fail O.ODE+00 219 0

0 0

1 1

1 1

1 Fail Fail 0.00E+00 220 I

1 1

1 1

0 0

Fail Fail 0.00E+00 221 1

1 1

1 1

0 1

0 Fail Fall 0.00E+00 222 1

1 1

1 0

0 1

Fail Fail 0.00E+00 223 1

1 1

1 0

1 1

0 Fail Fail QOOE00 224 1

1 1

1 0

1 0

1 Fail Fail QOOE+00 225 1

1 1

1 0

0 1

1 Fail Fail 0.00E+00 226 1

1 1

0 1

1 1

0 Fail Fail O.ODE+00 227 1

1 1

0 1

1 0

1 Fail Fail 6.17E-14 228 1

1 1

0 1

0 1

1 Fail Fail O.ODE+00 229 1

1 1

0 0

1 1

1 Fail Fail O.00E+OO 230 1

1 0

1 1

1 1

0 Fail Fail 0.00E+00 231 1

1 0

1 1

1 0

1 Fail Fail 0.00E+00 232 1

1 0

1 1

0 1

1 Fail Fail O.ODE+00 233 1

1 0

1 0

1 1

1 Fail Fail O.00E+00 234 1

1 0

0 1

1 1

i Fail Fail O.00E400 23S 1

0 1

1 1

1 1

0 Fall Fail 0.00E+00 235 1

0 1

1 1

1 0

1 Fail Fail 0.00E+00 237 1

0 1

1 1

0 1

1 Fail Fail 0.00E+00 238 1

0 1

1 0

1 1

1 Fail Fail D.00E+00 239 1

0 1

0 1

1 1

1 Fail Fail 0.00E+00 240 1

0 0

1 1

1 1

1 Fail Fail 0.00E+00 241 0

1 1

1 1

1 1

0 Fail Fail 0.00E+00 242 0

1 1

1 1

1 0

1 Fail Fail O.ODE+00 243 0

1 1

1 1

0 1

1 Fail Fail 0.00E+00 244 0

1 1

1 0

1

1 1

1 Fail Fail O.ODE+00 245 0

1 1

0 1

1 1

1 Fail Fail O.00E+00 246 0

1 0

1 1

1 1

1 Fail Fail O.00E+00 247 0

0 1

i 1

1 1

1 Fail Fail QO(E+OD 248 1

1 1

i 1

1 1

0 Fail Fail GLOUE+00 249 1

1 1

1 1

1 0

i 1

Fail Fai I 0.00E+00 250 F

1 1

1 0

1 i

Fail Fail D_00E+00 251 1

1 1

0 1

1 1

Fail Fail O.00E+00 252 1

I 1

0 1

i f

1 Fail Fail QOOE+00 253 1

1 0_

1 i

1 1

Fail Fail 400E+0O 254 i

0 1

1 1

1 Fail Fail O.00E+W 255 0

1 1

1 1

1 1

1 Fail Fail 0.00E+0E]

256 1

1 1

1 i

1 1

Fail Fail OLODE+00 Arnnrrai Frequencyof Failure fori Cell Out of Service Case

or5of5FOns Failing)

Fall L73E-07 Annu4 Fregueng oaf Failure far z

4utof $&VI a Case 13 ar 4 of 4 Fans FWft)

Fail L4XV

Table 5 Mean Damage Frequency (per Year) for Byron Station Target Groups Target Identified by BGS Corresponding Target Groups Target Group Approach Source Table for Dania Frequency Darns Fre uencv (yr') by Case I Cell Out of Service 2 Cells Out ofService UHS Riser Pipes Ultimate Heat Sink (UHS) 3 or 4 of 8 cells assumed to be out of service. 2 are out of service for random electrical failure and I or 2 are out of service for maintenance, W ith I fan out of service for maintenance, 3 of the remaining 5 fans need to sun ive to ensure success of UHS. UHS failure based on >=3 of 5 remaining fans damaged by tornado rnis silos. With 2 fans out of service for maintenance, 2 of the remaining 4 fans need to survive to ensure success of UHS. UHS failure based on - 2 of4 reniaining fans darnaged by tornado missiles. Details of approach documented in Section 2.32.

Table 2-6 1.73E-07 1.42E-07 UHS Anti VortexBoxes & Trash Screens UHS Fan Motor and Power Feeds UHS Fan Gear Box Oil Gauges UHS Personnel Hatches UHS Inspection Hatches UHS Fan Blades UHS Electrical Room Louvers Embedded Conduits in South Wall of Auxary Building Underground Cable Vaults Diesel AuxFW Pump Exhausts Ul DAFP Boolean Union over separate targets for exhaust pipe and cover plate. Separate damage frequencies computed for each unit.

Table 2-4 3.16E-07 U2 DA FP 3.77E-07 PORV Tailpipes Ul PORV I Boolean Union overseparate targets modeled for

crimping and pipe penetration pass through. Separate damage ftequencies; computed for each PORV on each unit.

Table 24 6.61E-10 Ul PORV2 2.14E-10 Ul PORV3 8.93E-10 Ul PORV4 3.06E-10 U2PORVI 1.46E-10 U2PORV2 4.57E-10 U2PORV3 4.29E-10 U2PORV4 4.75E-10 MSSVTadpipes UIMSSVI Boolean Union over-5 MSSVs on each respective Main Steamlire.

Separate damage fiequencies computed for each set of 5 MSSVs on each unit.

Table 2-4 1A8E-09 Ul MSSV2 3.07E-10 Ul MSSV3 5.79E-09 Ul MSSV4 7.59E-10 U2MSSVI 5.63E-10 U2 MSSV2 1.15E-09 U2MSSV3 7.76F-10 U2 MSSV4 1.36E-09 DeepwellEnclosuies Deepwell Enclosures, Electrical Rooms 13 IZ and 132Z, and related conduits Boolean union of Deep well Pump OA and Deep well Pump OB Table 2-4 9.645-08 RWST Hatches Ul RWST Hatch Missile hit probability on single target representing the RWST hatch for each unit.

Table 2-3 2.45E-07 U2 RWST Hatch 239E-07 Ul New Targets Ul MEERDiv 2 Opening Arithmetic sum of missiles passing through equivalent pipe penetration and perforating the pipe blocking the opening Table 2-3 5.11E-09 Ul MEER Div I Opening 6.53E-08 Ul CR HVAC Intake Opening Missiles passing through equivalent pipe penetration 4,ODE,10 U2 New Targets U2 CRHVAC Intake Opening Missiles passing through equivalent pipe penetration Table 2-3 1.50E-09 U2 MEERDiv I Opening Arithmetic sum of missiles passing through equivalent pipe penetration and perforating the pipe blocking the opening 6.16E-08 U2 MEER Div 2 Opening 1.12E-08 Conduits in Non-ESF Room Div 11 and 21 Conduit behind Opening Boolean union over all conduit segments behind opening Table 2-4 1.60E-09 Arithmetic Sum over all Unit I Target Groups (includes UHS) 9.13E-07

&83E-07 Ariflunefic Sum over all Unit2 Target Groups (includes UHS) 9.66E-07 9.36E-07 Arithmetic Sum over all Target Groups 1.61E-06 L58E-06

Table 6 Sequential Numbering of Safety-Significant, Shielding and Missile Source Targets (Page 1 of 7)

TaRUU T=Vt;l Bps TWO G" 3OZWIR TXVtllescr+ %"

~..

i UHS Cel H Rorer Pipes UHS Barr Pipe CeUH beret F

2 UHS Roa

CeUH mm 3

M CeIlH Fan and Associated Coot Tower Fan Moat Cal H 3

4 Campouem Gear Sac OiLevel Gnome - CelH 4

3 Persom el Hatch CeIR 5

6 Fan hsp Kdw HaIrh - Cel H 6

7 Fan - CAR 7

9 IU-HS CeIlG Rorer Pipes UPS Riser Pipe Cel G barer 9

9 UIS Riser Pipe Cel G mplw 9

10 GHS Ce11G Fan and As mawd Coaig Tower Fan Maw Gel G 10 11 Gampooents Gear Boe OiLLeael Gwgp - Gel. G 11 12 PasomelHatrh OdG 12 13 Fan Ikon Hatch - Cel G 13 14 Fan-Cel G 14 15 UHS C.eIlF Riser Pipes LM Riser Pipe Cel F - L wer is 16 UHS Riser Pipe CeiF - Ugw 16 17 UHS Cel F Fan and Assoc'eatied Cooing T=er Fan MoW Cel F 17 is Gear Boa Of Level Gap - CelF is 19 PermoelHntch Cel F 19 20 Fan bspectian Hatch - CelF 20 21 Fan - Cel F 21

2)

IUM Cel1E Riser P;m UHS Riser Pipe CelE Loeerer 22 23 UM Riser Plpe CelE UPPIE 23 24 UM Cel E Fan andA.ssocaad CooTag Tam Fan Molar -- Cel E 34 25 Ca v"I is Gear Bare Wad Glee - CeIE 25 26 PerseumlElatch CelE 26 27 Fan bcspectim Hatch - Cel £ 27 29 Fan - CeIE 29 29 UHS Cel D Riser Pipes UHS RbuPie COUD - Lower 39 30 UHSRJserPpeCeIDVWu 30 31 VHS CeIlD Fan and Associated Cooing Toewwer Fan Mole CeI D 31 33 Caine nam Gear Boer OHevel Gnnge - CelD 32 33 Persamal Haack Cel D 33 34 Fan 3eapection Hatch - Cel D 34 35 Faa-C.elD 3~

36

[r'H5 CellC Riser Pipes LM Riser Pipe Cel C Lawer 36 37 UHS Riser PVe - Cel C-Umer 37 39 L,US Cel C Fan and 4ssocated Coolug TosNer Fan Maw Cel C 39 39 Gear Bon OilL d Caage - Cel C 39 40 Persamel Halrh Cell C 40 41 Fan 3rspetAw Hatch - Cel C 41

42)

Fan-CdC 42

Table 6 Sequential Numbering of Safety-Significant, Shielding and Missile Source Targets (Page 2 of 7) 10RUS WZ TKW (Naga Ttttwt r 43 LTHS CelB Riser Pipes URS Riser Pipe Cell B Lower 43 44 UHS Riser Pipe Cell B UWer 44 45 UHS Cell B Fin snd Associated Coma Tower Fan MMM CeIl B 45 46 Cattilmevts Gear Baa 08 Letel Gauge - Cell B 46 47 Pelsomiel Hatch CeIl B 47 48 Fin Inspectim Hatch - CeIl B 48 49 Fan - CeIl B 49 50 UHS CeIlA Riser Pipes UHS Riser Pipe CeIlA Lower 54 51 UHS Riser Pipe CeH A Upper 51 52 UHS CeH A Fan and Associated Coohng Tooter Fin Motor CellA 52 53 cotlwwm Gear Bas 031 Les-el Gauge - CellA 53 54 PP*amel Hatch Cell A 54 55 Fan Iaspectim Hatch - Cell A 55 56 Fan-Cell A 56 57 Ana-Vaztea Bm Trash Screens e

Anti-Vcrtemx Trash Seen Somth Side 57 58 And-Vag Trash Screen North Side 58 59 UHS Eleancal Roam 2321Z Air Intake Lome: an LM Electrical Roam South - West

Q 59 6D UHS Electrical Roam 1322 Air Intake Lvmw an UHS Becttral Roam South - East Opemag 60 61 UHS Electrical Roam 23IZ Air Iatalae Louver on UF3S El knacal Room Nadi - Vest

noz<

61 62 UHS Electrical Roam 131Z Ar inmlte Loaner an L°HS Electrical Roots Natth - East Opening 62 63 Ul Diesel AmAary Feed Pmnp Diesel Amairy Feed Pump Echamt Ul Laver paatim 63 64 E haum DieselA

Feed Punip Exhaust Ul UWff padon.

64 65 U2 Diesel Awry Feed P1nnp Diesel Aumrp Feed Pump Eahaint U2 Loww pm um 65 66 Emha115r; DieselAudary Feed Pm3p Eatmust U2 Upper 66 67 Ul PORI' 1 (SE)

Ul - SE PORV Tripe I - crutsh 67 68 Ul - SE PORN TaalQipe 1-PP 68 69 Ul PORV 2 (SE)

Ul - SE PORV Tai*e 2 - crush 69 70 UI - SE PORV Ta.49pe 2 -PP 70 71 Ul PORV 3 (S)

UI - Soil PORV Ta*ipe I - crush 71 72 Ul - SW PORT T

1 - PP 72 73 U1 PCRV 4 (SW)

UI - SW PORE' Ta**e 2 - crash 73 74 Ul - SW PORV TmVipe 2 - PP 74 75 U2 PORV I (AE)

U2 - NE PORV TwVp 1-crush 75 76 U2 - NE PORV TmVfw I - PP 76 77 U2 PORV 2 (rim U2 - NE PORV Tame 2 - crush 77 78 U2 - NE PORV T

2 - PP 78 79 U2 PORV 3 (N%D

[T? - NW PORV Tiilpw 1-aush 79 0

U2 - NW PORV Tz4xpe 1 - PP 80 81 U2 PORV 4 (1;M U2 - N-W PORV Tai W 2 - crush 81 92 U2-NW PORV F

, -PP KI 93 U1 NSW. CrnW I (SE)

Ul - SE XISSV Tame C %W 1-PP 1 K

84 Ul - SE 1iSSV Tao* Group 1-PP 2 84 85 Ul - SE 3iSSV Tame Crate 1-PP 3 85 86 Ul - SE !iSSV Tame Cintip 1-PP 4 86 87 Ul - SE xiSSV LaibE Grow 1 - PP 5 87 88 L1 bSSV G"W 2 (SE)

Ul - SE NISSV Tailpipe Group 2 - PP 1 as 89 Ul - SE NISSV Tailpipe Cr W 2 - PP 2 89 90 Ul - SE NISSV Ta4*e Crotiv 2 - PP 3 90 91 Ul - SE _'ASSV Tailpipe Croup 2 - PP 4 91 92 Ul - SE -NISSV TmViFe Grotip 2 - PP 5 92 93 UI ? ISS5ti Croup 3 (SW)

Ul - SW MSS-Tailpipe Craw 1 - PP 1 93 94 Ul - SW Iesv Taipipe QU% I - PP 2 94 95 Ul - SW MSS-Ta*ipe Qv% 1 - PP 3 95 96 Ul - SW NLSSZr Tame QvW I - PP 4 96 97 Ul - SW M35fr T 1 - PP 5 97

Table 6 Sequential Numbering of Safety-Significant, Shielding and Missile Source Targets (Page 3 of 7)

TORUN TWA L4 0 98 U1 MSS-V Grays 4 (SUD U1 - SW MSSV Ta** Grote 2 - PP 1 9S 99 Ul - SW MSSV Tak* Grote 2 - PP 2 99 100 UI - SW MSSV Tailpipe Group 2 - PP 3 100 101 UI - SW MSSV Tame Group 2 - PP 4 101 102 U1 - SW MSSV Ta

Group 2 - PP 5 103 103 U2 MSSV Group 1 ( E)

U2 - NE MSSV Tailpipe Group 1 - PP 1 103 IN U2 - NE MSSV Ta pipe Grote 1 - PP 2 104 105 U2 - NE MSSV Tat*ipe Gram 1-PP 3 105 106 U2 - NE MSSV Tainpe Grata 1 - PP 4 106 107 U3 - NE MSSV Tatllripe Grote 1-PP 5 107 108 U2 MSSV Grote 2 (WE)

U2 - NE MSSV Taflpipe Grata 2 - PP 1 108 109 U2 - NE MSSV Tailpipe Grata 2 - PP 2 109 110 U3 - NE MSSV Ta apipe Group 2 - PP 3 110 111 U2 - NE MSSV Ta.Bnipe Group 2 - PP 4 111 112 U3 - NE MSSV Ta

Croup 2 - PP 5 113 113 U2 MSSV Group 3 ('NUD U2 - NW MSSV Ta1pipe Grow i - PP 1 113 114 U2 - NW MSSV Ta:Uv* Grata 1 - PP 2 114 115 U2 - NW MSSV Tame Grant 1 - PP 3 115 114 U2 - NW MSSV Tape Group 1-PP 4 116 117 U2-NW MSSV T 1-PP5 117 118 U2 MSSV Croup 4 (RED U2 - NW MSSV Ta** Grote 2 - PP 1 118 119 U2 - NW MSSV Ta*npe Grote 2 - PP 2 119 IN U2 - NW MSSV Tarluipe Croup 2 - PP 3 120 121 U2 - NW MSSV Ta*ipe Grote 2 - PP 4 121 I"

U2 - NW MSSV Tailpipe Group 2 - PP 5 12?

123 Deeuorefi Eaclw-tues Deepwell Eiacbsure #1 123 124 Dee

ell Encbsure #2 124 125 Div 11 Embedded Conduits m South Wal of A" Bkk 1:25 126 Embedded Coaduis Div 21 Embedded Conduits m South Wal of Aux Bid° 126 127 Div 12 Embedded Cond"s in South W"a3l of Am Bide 127 128 Div

) Embedded Condiricsn South AValofAmBid--

128 1299 Cable Vauk 2H2 Div 2')

12.0 130 Cable Vauk 1112 Div 12 130 131 Cable Vaults C=able Vauk 2GI Div 21 131 132 Cable Vault 1GI Div 11 133 133 Cable Vault 272 -- Div 22 133 134 Cable Vauk 132 Div 13 134 135 RW ST Hatches Unit 1 RWST Hatch 135 136 I.; ut 2 RW ST Hatch 136 137 Div 12 MEER Ul Dkision 2 I+lEER Cgnuing 137 138 Disc I1 NEER Ul Dh*ion I MFER Open 138 139 MCR Makeup Air hnake 1:1 1 I Ccmm1Room HVAC hnalse Opening 13P 144 MCR Make

Ai Intake-1172 V2 Control Roam HVAC Zurale Openiiz 140 141 Disc 31 MEEK U2 Dk-aion I N=R Openmg 141 142 Dev "? 3=

U2 Dais= 2 MEER Own=

1421 143 Coa&iti in Na-ESF Switchpear Rimm - Setert 1 143 144 Courb n Nom ESF Sw bchpear Roth - Sew 3 144 145 Coed= n Nan-ESF Sw&-h-aaar Roos - Segmer 3 145 146

'ion-ESF Sw*idwear Room Cand.T

in Na ESF Svr&h,ar Room - Se

nt 4 1.36 147 Conduce in Naa ESF Sw tchr-ar Room - Sezmm 5 14; 148 Rive East ofNon-£SF Roam-Open' Fj - Sent 1 148 149 Pine East of?Noa-£SF Roam O

- :Seetnent ?

149 150 Div 12 MEEK RkLe East of Ul Dkkion 2 MEER Openmz 150 151 DR* 11 MEER Pte East of Ul DkWm I MEEK Openkg 151 152 Div 21 WER Pin East of U2 Dk&m I M£ER Openmg 153 153 Div 22 hLMR Pipe Fast of U2 Di lie

2 hMM 153

Table 6 Sequential Numbering of Safety-Significant, Shielding and Missile Source Targets (Page 4 of 7)

TORMS Twpt#

154 RGS Topt Gromp TOOM Target XUscrk"ia I..kv 1""

1 1.w Uisssie Shiakfin-Targets Reserved 1 155 Reserid i

156 Reserved 3

157 Reserved 4

158 Reserved 5 5

159 Reserved 6

16D Reserved 7 7

161 Reserved 8 9

162 Unit I RWST 9

163 Unit 2 IMST 10 164 DAYPNorth 11 165 DAFPEast 12 IM DAFP SaA 13 167 DAFPNar*2 14 168 DAR EasC 15 169 D.AF.D Souib-1 16 170 UHS South Shield Wit Low 17 171 LES North Sh[eH Wall low 19 172 Ce]IH Weil Cokmnbkxkap it 173 Cel G West Cokinin bkyckap 30 174 Cell F West Cab= bbdmp 21 175 Cell E West Colinn blockage 22 176 Cel D Fjw Cobann bwJmp 23 177 Cell C East Cohmm bockap 24 178 CellB East Cohmmbockap 25 179 CeIA East Cebmabockap 26 ISO Tmbine BUg 37 III Hearer Bag 29 182 A-.L,;B& Center 29 113 Fuel.BAg' 30 194 Ul Aim BHg E 31 1.85 Ul Aim Bldg W 3-1 136 U-) Aim Bldg E 33 197 U-1 Aim BMg W 34 its Ul Re

Bldg 35 lay U2 Rezow Bldg 36 190 Ul Sahty Valve Rom SE 37 191 161 Safety Val m Romn SE Upper 39 192 U1 safiny Valve Rocan Sw 39 193 Ul Safetr Valve Rzom SW Ugu 40 194 U2 Safety/

RoomNE 41 t95 U2 Safety Vake Room NE U"u 42 196 U21 Safiq Valve Roo mNW 43 197 U2 Safety Valve Rim N%'UWu 44 199 UHS lr:ppu FE South 45 199 uHS Una PIN ardL 46 20D UES E]ectzkal Ama South 47 201 UH S Electrxal Area North 49 2M UHS Riser Barrier NJ 49 203 UHS Riser 8

3 so 204 UHS Riser Baider -2\\3 51 205 UHS fter Bamer'_'\\ 4 52 206 UHS Riser Barrier 51 207 LES Rkku Barrier S2 54 209 VHS Riser Banier S3 55 209 UHS ]LserBanierS4 56 210 UHS Imefer Wall 1 57 211 UHS inwiOr wait -1 56

Table 6 Sequential Numbering of Safety-Significant, Shielding and Missile Source Targets (Page 5 of 7)

TOE" T>tt~t f RCS Ttt Wt t+ vvp TOR" Towt D"Cdfdn I""

T....,.

212 Missfla Shier Tamer conmtuvd UHS Interior Wa113 59 213 UHS Interwr Wal4 60 214 UHS Iutetiar Was 5 61 215 UHS Interior Wald 62 216 UHS Interior WaD 7 63 217 UHS Interw Wall 8 64 218 UHS Fan Barrier 1 65 219 UHS Fan Barrier 2 66 220 UHS Fan Bawer 3 67 "I

1 UHS Fan Banier 4 68 2?

1 UHS Fan Barrier 5 6?

21-3 UHS Fan Bawer 6 70 214 UHS Fan Ranier 7 71 225 UHS Fan Bamu 8 72 2-16 UHS So ugh Banier S wa1 73

'517 UHS Sowth Bawer N waR 74 118 UHS South Barrier Roof 75 22 UHS South Barrier Inner wall 76 230 UHS Noah Barrier S waU 77 231 UHS North Barrier N wag 78 232 UHS North Barrier Roof 79 233 UHS North Bawer Inver wa3 90 234 UHS A'est Wa2l Loa 81 235 UHS East Wa +Law S2 236 MS Pipe near sandhi room S3 237 MS Pipe between conks roaan and HELB 1 84 238 MS Pore after HELD 2 S5 239 MS Pipe before RE

5 86 240 MS Pipe After HELB 6 87 241 In frost of cable roam S8 242 In front of FM

2 and 3 S9 243 Gap between HELB tareetr 90 244 In fr= of U2 airintake and HELB and 6 91 45 Missije Source Targets Zl Trar-er Grt w 1 1

246 Zl 3Yat3

Gmtm 2 2

247 New Service BiaZdin-3 24$

Gateharse (1&4F) 4 249 Old S eniic e B nidns 3

250 Radaaste Bm-1do 6

251 Rt?censi

But7div' 252 Receamz Bui'cing Warebouse S

253 Botrlad Gas Storage 9

254 Z4 Pua4kowe 1 10 255 Z4 P'.kouie 2 1 i 256 Z3 Pnmpkowe 3 13 357 Waste Treatment Buddn-13 258 StUbstatiM 14 259 Z5 ESewash Statism 15 260 Aban&nedFacfat_v?biodenance Storage 16 361 1:1 CAF 17 362 UHS Guard Wakway Smxture.,top of stairway IS 263 ISFSI Buskins 19 364 NS'A'P Training Bufidmg 20 265 Z12 Warehouse 1 2i 366 Zl" Warehowe 2 22 267 Sw9ch}ard'_4iantenawe BuMm; 23 Is Switchyard Relay House 24 Is Vehicle Stura_pe and Warehosrse 25 270 EPA Wasn Stara,ze 26

Table 6 Sequential Numbering of Safety-Significant, Shielding and Missile Source Targets (Page 6 of 7)

TORUM Tarlpt#

BGS Topt Grov TORUMTWvtD"CdF6" T.W.

271 Mismi Sorarte Tarpts conr,'nuod Cbtd* Sback 27 272 Z15 W

3 29 273 Se"p Treattoent 29 274 Z16 Warebme 4 30 275 Z16 Warebouse 5 31 276 Pn-F=y Fac&Y n

In mWersbect 33 272 TRi*gRUI&

M 275 ZIS Mmd 35 W

Zia Tmiler 36 281 zis Camopy 37 232 Training BWWRg Section 1 39 293 Training Boil ing Section 2 39 234 Ttairmg BmiliagMaktacamce Lab 0

W Z20 Shed 41 236 Z21 Rai Car Shed 42 297 Nbcoowave Tower SuAffing 41 238 Z27 Ward Shack 44 M

Z2S Bash 45 2%

Z2S Sbed 46 291 Z29 H=e 47 Z30 Tlailer 48 M

Z31 Ckwd Sbaa 49 V4 Z31 CanWy 50 M

Z32 Tbaip-T 51 296 Circ Water Pmoophme n

M vi CO*g T

Stairs 53 298 LI Cooft Tower Stairs 54 299 ZP Bain and Sbad Structures 30D 234 Home 11 56 301 MdABu6ftg 57 3M.

Thim Shed 58 303 13-1 CAF 59 304 Umit I TurW* Deck 60 305 Umit 2 Tbibine Dent 61 306 TWA* BHg West Wit" 1 62 307 Torb i

  • B HI E ass r W A"71 63 309 Tuttine Bldg Sauth Wall 64 309 acdi Wall 65 310 T8 Rod Deck M

311 U-1 RB Cla&bg 67 3.12 U2 RE CbMag 69 313 U1 CAF Transition 69 314 1;2 CAF Transition 70 315 QoftactocsFacility 71 316 im Em. Sbop 72 317 Heat er Bay Roof 73 AS TSC 74 319 TB Roa[Paven Section 1 75 320 TSC Re'Pavers 71 321 EK Sbop Rod Nven 77 322 TB RodPaven Section 2 79 323 TB RoofPavers Sectim 3 79 324 TBRodFavers Sectioa4 so 325 TB Roof Paven Section 5 Si 326 TB Roof Pa7. ers Se

m 6 V

327 TB RodPavez-z Section 7 23 328 TB Roof Pater Section 9 339 TB RoofPaverz Sectito 9 14 85 330 TB R

Section 10 26

Table 6 Sequential Numbering of Safety-Significant, Shielding and Missile Source Targets (Page 7 of 7)

TORUU Txpt#

a"T.vt co" 10=W TWrD*-$

331

]hiss Some Tager cad Camamackl EbSEgg 3?

333 D mk m dReadyR;om Is 333 UMk 2 Tesft ofce 39 333 CachnTOM I Ra og 90 333 Co ft Tom 2 Ramkg 91 336 CO*g'Tower I 7bp 92 33' C:ooLug TOWN Tap 2 93 335 CWft Toter I Stm 94 339 Coo* Tower 2 9tm 95 3=0 Acid Tait Ram 96 3=1 Tutee MUM West Wal3 97 342 TWbiae Bu1dg'9G'est Aral 3 98 343 UAS GundLwa 99

ATTACHMENT 1-2 TORMIS Results Figures 1-10 BYRON STATION UNITS I AND 2 Docket Nos. 50-454 and 50-455 Renewed Facility Operating License Nos. NPF-37 and NPF-66

Figure 1 SX System Diagram I

I got -------------

=31

10NMR OA

TONER OB

i

1 I

I

I~

I I

U A FAN

06 KM

UC FAN

CID FM

9E AAN

t7F FAN

00 K4w

UM FAN

~ ~

7O

I I ------------ I

(DIVISION 11)

(DIVISlO~1 21 bH1lsltyN 12

x

I i aw rU '~Mw MU i x

I

j

(DIVISION 22)

i +a : ww Mu GW Mu f I I

Lk

p

-- T

I a

OB SX f$X PF+ I 1fUIPI34 EqP3

467 570

1 WU PP

b.

RIVER

aaxisan tic y, ~ I RIVER BiO

Nf

ii::x1[ to

R.rMIr,T;

C!;Xtr.;tn

~ix!'.T31 OMK1~ 1A 8?OPi1lti

T:r~

SX Grp Suitt xw-fmm W & W Tow 9tictlmtia 3~tO+id/

+xis a 1:35C1i5A 9lawdol~n 1434

9c4r I a. sx PP

Is sx PP

-A

~,,

Unit 2 l=niE ? ~ `

Loads

CtBCI

As 8!Q7 $91itiA

-xx'~~9 2A SX Pp

26 sx PP iM:a 1S+I-nis

IS7R@i'd

1S1C11a0

iffirtt1~B s

s

gE 1~~.td7!*, t 1; 1PkV2,JSW

1~ROSIstd

Y

1.7C1+T@I i*X1d9A

195478

15x031

r'ti

!,x t gft

Riadre lACkO

ri+i

n.

ie

~.Rt~z3 19X: CeA

x !f

!QF l.OINNt

T1Y>rw F ftfrfl l~r'- 2A

  • F ~ B&MM,

AF FP

r r

tsix t rC Gsa :.cooilr lAF0JG,..*7A

,.Aar 3,,?aM

1e

F ro v~frr

.w23

~.

t~x~~a

t5k~tia8 as CsorW t::xClQ

~

}'

Cal it

~c7 Micc nr i

97FMS L

2ani

~~~

r ry r' o-et oirn

r

T SJ-? 0+1})

~

h.it itl-1 rnfjl 95Xm? 43i irr TO I i'~

r i.iRl~i

~'

^ZA

,~:x,c,

23xrCG

afttrn iantl I

kFd

A TORM R

pbr on

ATMM Su Train Q ipi~rt

s Trdn supply

B Train RMurn

SX-1 $ m P1 pin Aug-22,2D% Rev 30 FOR TRAIAPIRG LME ONLY

Figure 2 Aerial Photograph of the Byron Station UHS Physical Layout khL

Figure 3 Individual Target Hit and Damage Frequencies IIIIIIIII IIII III II~IIIII~IIIIIII 1111111 I IIII11111111111111~IIIIIIIIIIIIIIIIIIIIIIIIIIItIIIIIIHIIIIIIIIIIIIIIIIIIIIllll1111111111111111111~11111111

~.11!IIIIII IIIIIVIII111111111IIIIII 1111111 I IIIIIIIIIII IIIIIIIII11111IIIIllllllllllllllilllllllllllllllllllllllll~llll1111111111I IIIII1111~8i11111111111!

~I',III~~llllll~lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllilll!IIIIIIIIIIIIIIIII',IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII'JIIIIIIIIIIIIII ll'Ill llllllllllllllllllllllllll1111111IIIIIIIIIIIIIIIIIIIII111111111111ItllllllllllllllllllllllllllllllllllllllllllllllllllllllllIIII~IIIIIhillIIIII

Figure 4 Target Group Hit and Damage Frequencies

Figure 5 Tornado Rotational Wind Velocity Profiles z (it)

ISO tO do 0

f G as 2 4 1 Legen d 1

it I ~ ~' ~ '

i I

Cr 10. X40 20 4

a G,, A QJS 6

0104 (025 "Prapa,riwd vslwas 0

10

tj~v (Mppt)

(b) RntationaT Velocity

L E-05

1. E-06 Ln W

'a LE-07 L. a

.0

1. E-0$

C C LE-09 L

U.

1. E-10 Figure 6 Plot of Frequencies with Profile 5 versus Profile 3 M

~ r RETEM

i Damage Frequency

~Rit

~iiil

Sil#Illi11111ICI
~:

111 II1111111IIrlll ~I1111 I I

~

~sr='e3 rw~*w G t

.iw Gi !

I wrrwt~tw.wr t rirw~anr*~irii:ii~~.~.iriliiil{i~.i~w~~::ii wwwrrnm I

G~11GGIIIrnn~iii~TiYi w~ioni

~~IwIIdii~?iinI

~Ir11iIlI~

IM Qiw

~I4t1 iii III1N11 IvllAl p

w.w

.wwr~ir~ni' ui~

w.iiii

~wwwullr~r.rr~i tww~

wI t n ~i.=~

~~//.tlt rlrll/~lll~tll tt114/~

t M#

11 141//Ottlt~t.t 111 iw:*:.'Giro r~~i~llII~Irri~llf

..n.--nSiwi I~ett II

.w. I111 Ti"'.Tiri~:::@ Ili wwi""ri'Sr"3:i:ii

"~'Cin~

ii~3C7'"' ~"w7r:C~ii riliiriii'~i nwtiiil

~I*=t~llll..~4~

~~~r1111~1*t!/#III I~~/

~~r~l~ll IIrlllll I~MIII~I!1111 Irllllll~Irlillll~I1111111 I~~1111

~I

,~

  • r+ir

.~._*

w:~iiR::;ii..ir.~;r+~ii:;iwirwr~iZ';:Giwir~.iaiCi;.

rr_r!~*nrri.rr..rrlw.,.a~.wr_rro*.~rrr*_r w.*.

l:iiuu wrw`iw4w~gill Ci`

iiiiiii/iiii~wit/wii'iiii nl i~ ~~mii~ Io111 mm~lmn mlismil Imi m r1111111llllp~Irlllll~~Irllllll~I1111111=Irl 1111 11~I~

I~IItllit#t~~

V A4 1 11~~

wrrrr~.r.

v

~l wwww awiwat t iiii~iu'~`~IIilinoliIiBull

~~***~i*Iiii iaiimI ww .wwrr.n=

t~>*>f

~1Iir

Irl#11

~G~rUI ~AMw t44~

>siH#

  1. .I~r11tlHll.t.#

111 tI/1IIIIInr~

III rwrrwr viol

mail momini rr*u*iia._rw.**.~s_

.rw~ilwi..rarrrr.wr~w>srrrirri..

lilll

wIIII IrIrurllItl~! X11'

    1. tt#trnn~.. Its###li ~iail~ilnlnl~tttt~l#Htnnl#t#nlrntul awsr..n

.!m ~.*w__rr*.*I~~~~wlar

~w.iarss:rwrwrrwwn..r..

4~~ts*//tnttttws4~

anu 4~t~4tettnl4twttotnlui

=

_IrIInllIiI~IlilltIrqII~Ilrll

.i*ism.~rwni'"'~-^ii:;ii:rnir~~~*_-~:::

a_rw***..~r.Sia~.iisr*n~wnrwww~r.*a.~~rs*+a.~r~riwiii rI 'are!

_r/.lA~_~wlwlpwlrpl~t~/tw~~wrji~ij.~ii 1111l~t<t1tltl~!//ttl#1~1.4!ln111~41

~~ NI{1

/111U1~INlll~~rlNII~I~11111~N1II~~I!I E-10 LE-09 LE-08 I. E-07 LE-06 LE-05 Frequency With Frofi}e 3 (defatAt)

I.

  • Target Group Results ---wl;i tine L E-11 L E-11

Figure 7 Zone Layout for Byron Station TORMIS Analysis

Figure 8 TORMIS Simulation of Byron Station Tornado Hazard for Plant Safety Envelope

~t wwwwwwiw~w r~aNal~s~wlrw~~r~rw*awr~

www~~www~rwi~ww~w~w ~A~~will~fwww wrI~~wwwnw ~iwrwww~w~Iirw~w~iw~wMwiww~~wwr~,w MONO NNEW MEMM SOMME iw ~wwiwiII wwwuwa~ ww~wa ~w ~wwtw iw wwr~wrw~

wi~wrw~w~www~wrww~w~~ tarnwiwww~wwwrww~I EMMONS IINN/MNIMMENMEMON"WE NESS/

I mono M1111111,1111111 r~sl~w~rs~srr

..~ ~nlwlrr

r

~ '

. t'ti

r~~r~i~l~s~

I~wwwwww

~l lw~.1~w~

sllra~

$......KWiI...

www~~~~wwww~~sww rw~wtr~wn~w~iww~

.ate................

one lemon 11111 11 01111 INN

Figure 9 Target Group Hit and Damage Frequency with Confidence Intervals Target Group Confidence Intervals for Missile Hit 1.00E-03 L

1.00E-04 L

a~ a

1.00E-05 a~

rr a~

1.00E-06 Ad 1.00E-07 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 BGS Target Group Mean = Center Line I Mean - 2

  • Std Err I Mean + 2
  • Std Err Target Group Confidence Intervals for Damage 1.00E-05 1.00E-06 L

M a~

a, 1.00E-07 CL v 1.00E-08 c

a, Er 1.00E-09 L

U.

W '

M 1.00E-10 E

M 0 1.00E-11 1.00E-12 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 BGS Target Group Mean = Center Line 0 Mean - 2

  • Std Err i Mean + 2
  • Std Err

LODE-04 LOOE-05 LOOE-06 F

IL

L DOE-07 LODE-09 LOOE-10 LOOE-11 Figure 10 Convergence Plot for Damage Frequency for Target Group 32 (1.12 MSSV 4)

Hit Convergence Over All Replications 50

61)

_0 OF W.

waftioU 10

20

30

40

so 60 TORMIS Replication Nun dw

  • U2 MSSV 4 -Running Mean - Mean - 2 Std Err - Mean + 2 Std Err LOOE-12

i .-I __ --1--

j

i 10

20

30

40 TORMIS Replication Number

  • U2 MSSV 4 -Running Mean -Mean - 2 Std Err -Mean+ 2 Std Err Damage Convergence Over All Replications LOOE-04 LOGE-O5 LOOE-06 V

LODE-07 LOGE-W LOOE-09 LODE-10 LODE-U LOOE-12

ATTACHMENT 1-3 Draft Markup of Updated Final Safety Analysis Report Pages BYRON STATION UNITS I AND 2 Docket Nos.60-454 and 50-455 Renewed Facility Operating License Nos. NPF-37 and NPF-66 REVISED UFSAR PAGES 3.3-1 through 3.3-5 3.5-11 3.5-21 through 3.5-28 3.5-33 3.5-34 3.5-48 3.5-49

3.3 WIND AND TORNADO LOADINGS 3.3.1 Wind Loadings 3.3.1.1 Design Wind Velocity A design wind velocity of 85 mph, based upon a 100-year mean recurrence interval, is used in the design of Seismic Category I structures.

For Category II structures a design wind velocity of 75 mph is used, based upon a 50-year mean recurrence interval.

The vertical velocity distribution and gust factors employed for the wind velocities are based on Table 5 of Reference 1 for exposure Type C.

3.3.1.2 Determination of Applied Forces The dynamic wind pressures are converted to an equivalent static force by considering appropriate pressure coefficients. The applied forces were derived in accordance with the provisions of Table 7, Reference 1, using external pressure coefficients, Cp of 0.8 and -0.5 for windward and leeward walls respectively, and

-0.7 for side walls and roofs.

For structural shapes other than rectangular appropriate pressure coefficients are used in accordance with Reference 2.

3.3.2 Tornado Loadings 3.3.2.1 Applicable Design Parameters The following are the parameters for the design-basis tornado (Reference 3) :

Tangential velocity: 290 mph Translational velocity: 70 mph Radius of maximum rotational velocity from center of tornado: 150 feet Pressure drop at the center of vortex: 3 psi Rate of pressure drop: 2 psi/sec.

Load Factor Since the postulated tornado loading is an extreme environmental 3.3-1

condition with a very low probability of occurrence, a load factor of 1.0 is used.

3.3-21a

3.3.2.2 Determination of Forces on Structures The Category I structures which have wind tornado loads, Op5..j bc-Is JI-s tornado generated missiles, and/or combination of these loads addressed in their design are as follows:

a. containment building,
b. auxiliary building,
c. fuel handling building,
d. main steam tunnel,
e. auxiliary feedwater tunnel,
f. essential service water-.cooling tower (Byron),
g. essential cooling pond (Braidwood),
h. deep well enclosures (Byron),
i. lake screen house substructure (Braidwood),
j. isolation valve room, and
k. essential service water discharge (Braidwood).

Several individual essential service water cooling tower comnonents (Byron) not fully orotected from tornado aenerated missiles are addressed in the -probabilistic tornado missile risk analysis (TORMIS) described in Byron only Section 3.5.5.

3.3-2.2.1 Transformation of Tornado Winds Into Effective All tornado wind pressure and differential pressure effects are considered as static loads since the natural period of building structures and their exposed structural elements is very short compared to the rate of variation of the applied loads.

The effects of the design-basis tornado are translated into forces on structures with the use of a tornado model (Reference

4) that incorporates parameters defined in Subsection 3.3.2.1.

The tornado model considers a velocity distribution based on the following equations:

v (r) = v. r + vt, for

< 1

(3.3-1)

R, Rc v (r) = vc Rc + vt, for r >! 1

(3.3-2) r

RC 3.3-2

where:

v(r)

= wind velocity at radius r, r

= distance from the center of the tornado, VC

= maximum tangential velocity, RC

= distance from the center of the tornado, to the locus of the maximum wind velocity, and Vt

= translational velocity.

The distribution of the pressure drop with the radius from the tornado is as follows:

p

3. 0 (1 - 0.5 (r/ R j2], for r < 1

(3.3-3)

RC p (r) = 1.5 (RC /r )2, for r > 1 (3.3-4)

RC where:

p(r) = pressure drop in psi.

The tornado velocity is converted into an equivalent static pressure using equations given in ANSI A-58.1-1972 (Reference 1).

Neither a "gust factor" nor any change in velocity with height is considered. Figure 3.3-1 shows the variation in wind velocity and differential pressure as per Equations 3.3-1, 3.3-2, 3.3-3, and 3.3-4. Figure 3.3-2 shows the windward and leeward wind pressure components of the tornado.

The load combination equation used for tornado load and tornado generated missiles is Wt = 448 psf + Wm. Figure 3.3-3 shows the resulting surface pressure when the effect of tornado wind and pressure drop components are added together.

The load combination equations as per SRP Section 3.3.2 using load parameters of UFSAR Section 3.3 are as follows:

1.

Wt

= W" i.e., Wt = 265 psf

2.

Wt

= WP i.e., Wt = 432 psf

3.

Wt

= WP = Wm

4.

Wt = Ww +.5 WP i.e.,

Wt = 340.1 psf 3.3-3

REVISION 2 - DECEMBER 1990

5.

Wt = WW + Wm

i.e., Wt = 265 psf + Wm

6. Wt = Ww +. 5 WP + Wm

i.e., Wt = 340.1 psf + Wm.

The equation (Wt = 448 psf + Wm) used in design is more conservative than the SRP equations above.

3.3.2.2.2 Venting of the Structure Venting of concrete structures is not relied upon to reduce the differential pressure loadings. However, all siding and roof decking of the Turbine Building above the floor at elevation 451 feet 0 inch is designed and detailed to blow off at tornado pressures exceeding 105 psf. Above this pressure only bare framework is considered to be exposed to design-basis tornado loads.

3.3.2.2.3 Tornado Generated Missiles The characteristics and spectrum of tornado generated missiles for the design-basis tornado are found in Subsection 3.5.1.4.

The characteristics and spectrum of tornado generated missiles considered in the probabilistic

i tornado missile risk analysis

_LTQRDLT_5J_ _des cribed in Byron -p-pJ!_y.-aeEt--1`

on'3.5.5 are found in Reference 5. The procedures used for designing for the impactive dynamic effects of a point load resulting from tornado generated missiles are found in Subsection 3.5.3.

3.3.2.2.4 Tornado Loading Combinations Refer to Tables 3.8-3 through 3.8-9 for the load factors and load combinations associated with tornado loading. In designing for the postulated design-basis tornado, the structure in consideration is placed in various locations of the pressure field to determine the maximum critical effects of shear, overturning moment, and torsional moment on the structure.

3.3.2.3 Effect of Failure of Structures or Components Not Designed for Tornado Loadings All non-safety-related structures which are connected to safety-related structures are designed to prevent collapse under the design tornado loading. The only exceptions are the fuel handling building train shed, the Essential Service Water Cooling Tower Security Booth Tower Walkway (applicable to Byron only) and Walkway Access Stair Tower (applicable to Byron only) and the equipment staging structures installed adjacent to the emergency hatches. The collapse of these structures under tornado loading does not affect the structural integrity of any safety-related structures.

All other non-safety-related structures are separated from safety-related structures by a distance exceeding the height of the non-safety-related structure. This ensures that the failure of non-safety-related structures will not affect safety-related structures. Missiles generated by the collapse of non-safety-3.3-4

REVISION 14 - DECEMBER 2012

related structures were evaluated to be less critical than those considered in Subsection 3.5.1.4. or were evaluated in Byron only Section 3.5.5.

3.3--54a

rj.

M FT.-jUfX-A-

,Q 3.3.3 References

1. ANSI A58.1-1,972,"Building Code Requirements for Minimum Design Load s'inlBuildings and eOther Structures," American National Standards Institute, Inc., New York, New York. 8l 58.1-1972.

., z4i

2. "Task Committee on Wind Forces, Committee on Loads and Stresses, Wind Forces on Structures, Final Report," Paper No.

3269, Transactions, ASCE, Vol. 26.rg 1961.

3. USNRC Regulatory Guide 1.76, "Design Basis Tornado for Nuclear Power Plant," April 1974.
4. J. D. Stevenson, "Tornado Design of Class I Structures for Nuclear Power Plants," Proceedings of Symposium on Structural Design of Nuclear Power Plant Facilities, University of Pittsburgh, December 1972.
5.

Design Anal vsis ARA-002116002116 "Tornado Missile TORMIS Analysis CGS,"

T -- T of [B ron Generating St

S

Revision 3.

3.3-5

the piping pressure element assemblies are less severe than those of Table 3.5-2b.

The missile characteristics of the reactor coolant pump temperature sensor, the instrumentation well of the pressurizer, and the pressurizer heaters are given in Table 3.5-2c.

A 10 degree expansion half angle water jet has been assumed.

3.5.1.3 Turbine Missiles The turbine-generators at the Byron/Braidwood Stations are manufactured by the Westinghouse Electric Corporation. Each unit consists of four double-flow turbine cylinders: one high pressure, and three low pressure. The low pressure stages employ 40-inch last row blades. The rated speed of the turbine-generator is 1800 rpm.

The current approach to evaluating turbine missile protection focuses on the probability of turbine failure resulting in the ejection of turbine disc (or internal structure) fragments through the turbine casing (P1). A risk assessment will be performed each refueling outage to ensure that the probability of a turbine missile, P1, remains at an acceptably low value. Based on this low probability, the turbine missile hazard is not considered a design-basis event for these stations. The details of the approach to ensure turbine missile protection are provided in Section 10.2.3.

For details on turbine overspeed protection, valve testing, and turbine characteristics, refer to Subsection 10.2.2.

3.5.1.4 Missiles Generated By Natural Phenomena Tornadoes are the only natural phenomenon occurring in the vicinity of the Byron/Braidwood Stations that can generate missiles. The characteristics of postulated design-basis tornado-generated missiles are given in Table -

3.5-3.

The impact velocities of these missiles resulting from the design-basis tornado (Subsection 3.3.2) are shown in Table 3.5-4. Missiles A.

B f C f D. and E are considered at all elevations, and missiles F and G are postulated at elevations up to 30 feet above grade level. These missiles are assumed to be capable of striking in all directions.

The characteristics of tornado-generated missiles considered in 0~6 S)

-S

I NO 13#11 "

Loa-

-Ims IM we W

-1, e i-

e. c e 15 3.5-11

REVISION 11 - DECEMBER 2006

3.5.2 Systems to be Protected All systems and equipment which may require protection are listed in Table 3.2-1.

Onsite storage locations for compressed gases are provided in Table 3.5-10.

Table 15.1-2 must be evaluated for protection against missiles postulated in Section 3.5.

The following safety-related components are located outdoors, away from the main building complex, installed above grade and have missile protection to the extent indicated:

Byron Station

a.

At the river screen house, the essential service water makeup pumps, and associated diesel-engine drives and fuel oil storage tanks are installed at elevation 702 feet 0 inch. The building does not protect the components from tornado missiles. Refer to Subsection 9.2.5.2 and Drawing M-20.

b.

The mechanical draft fans and their respective electric motor drives are located at the essential service water cooling towers (SXCTs) (refer to Drawings NCT-683-4H and -14H). The fans and motors are not fully protected from verrtlea! -e:e nearn trerrtlea.]

missiles and are evaluated in Section 3.5.5. A combination of TORMIS analvsis and t-Tornado -

-orotection piping to the SXCTs.

c.

The outside air intake openings for the SXCTBssent4 SeiFviee Wale Gee ling Teweic ESF Switchgear rooms are not protected from a tornado missile and are evaluated in Section 3.5.5.

d.

The onsite wells and pumps at Byron, although not safety-related, are each protected by missile-proof walls and roofs. The onsite wells supply makeup water to the essen44a! ser-v+*ee w~ate;~ eeel

towers SXCTs in the event that a tornado missile renders the essential service water makeup pumps inoperative.

Missile Protected check valves (OSX284A/B) are installed in the essential service water makeup lines to prevent back flow from the SXCT basins to the river screen house.

Braidwond There are no safety-related components located outdoors at Braidwood Station.

All safety-related electrical components which are located outdoors are listed in Subsection 8.3.1.4.4 (Class 1E Equipment in Remote Structures).

Safety-related electrical cables are adeQuatelv Protected against tornado-Generated missiles by the vauj-,c s 3.5-21

REVISION 15 - DECEMBER 2014

suppprtinq operation of the SXCTs and deep-well

s at Byron are evaluate

ri in Byron - oly E

o

- nj All Category I buried pipes on Byron/Braidwood sites and the Category II (Non-Safety Related) Well Water (WW) piping from the onsite wells and pumps to the SXCTsessential

wa#=er v

eling t.- -,Es at Byron have adequate soil cover for protection from tornado-generated missiles. These pipes are buried to depths greater than the 3.5-211ah REVISION 15 - DECEMBER 2014 1

required minimum depth of 4 feet 1 inch, determined using Young's method.

Safety-related HVAC system air intakes and exhausts are indicated on the plant arrangement Drawings M-5, M-6 f M-14 f M-15 and M-22-2.

Auxiliary Building and Containment Purge (VA,. VQ)_

T n i-A 1,,

s~ cz Intake louvers are shown as listed above. Protection is provided by missile walls.

P. w h;;

1 1.q i-The exhaust stacks are shown as listed above. Vertical stack connected to horizontal exhaust tunnel affords missile protection.

Diesel-Generator Room Intake (VD)

The diesel-generator room intake is shown as listed above. Protection is provided by missile walls.

Safety-related eleetrieal eables are aeleq;aately preteete I

aga+/-nst 4~ei-naele generra4~eEi fftiss44es by the aFeinfreiFe eeneicete duets aiFeand thefft.

Control Room Intake (VC)

The control room outside air intake is shown as listed above. Protection is provided by missile walls.

The Bvron control room turbine building makeu-o air intakes 3.5.3 Barrier Design Procedures Two types of structural response to missile impact have been investigated for the design-basis tornado-generated missiles in Section 3.5.1.4:

1

a.

local effect in the impacted area which includes estimation of the depth of penetration and, in the case of concrete barriers, the potential for secondary missiles by spalling or scabbing; and

b.

overall response of the barrier which includes the calculation of deflection due to missile impact.

The design-basis tornado-generated missile velocities presented in Table 3.5-4 are based on TVA Topical Report TVA-TR74-1.

Commonwealth Edison committed to design to these velocities during the PSAR review. The staff had accepted these velocities as indicated in Revision 0 of the Standard Review Plan 3.5.1.4.

Draft Rev. 1 of SRP 3.5.1.4 states: "At the operating license 3.5-22

REVISION 9 - DECEMBER 2002

stage, applicants who were not required at the construction 3.5-22a

permit stage to design to the missile spectrum of Rev. 0 of this SRP and the corresponding velocity set, should show the capability of the existing structures and components to withstand at least missiles C and F of the Rev. 0 to this SRP." It can be noted from Table 3.5-4 that the horizontal velocity of the missile F, utility pole - used in the Byron/Braidwood design is larger than the velocity of 211 fps (i.e., 0.4 times the total tornado velocity) specified in Revision 0 missile spectrum. The velocity for the steel rod is however lower than the Revision 0 spectrum velocity of 317 fps.

The walls and roofs of structures protecting the safety-related systems and components from design-basis tornado-generated missiles are of reinforced concrete with minimumthickness of 240=

and 14 inches respectively. The concrete used has a minimum cylinder strength of 3500 psi at 91 days.

The roof and wall thickness required to prevent back-face scabbing as a result of impact from the steel rod missile have been calculated using the modified National Defense Research council formula as 5.5 and 6.5 inches respectively. Since the minimum barrier thicknesses provided at Byron/Braidwood are much larger than the above values, it is concluded that the plant structures, systems and components are adequately protected against the Revision 0 spectrum of design-basis tornado-generated missiles.

Generally, all missiles (internal or external) are considered as impacting instantaneously with a very short rise time relative to the natural period of the impacting structure. Types of barriers designed to resist missile impact are:

a. Reinforced Concrete Barriers - The depth of penetration into a concrete barrier is calculated using the modified Petry equation (Reference 6).

Concrete barriers are designed such that the missile penetrates no more than two-thirds of the thickness of the barrier thus preventing spalling or scabbing (Reference 6). The overall deformation of the panel is investigated using methods presented in Reference

7. Reference 7 presents an equation of motion which enables one to calculate an impact force time-history consistent with the calculated penetration depth. To establish the capacity of the barrier to absorb energy, the deflection due to static loads are first calculated, then the deflection due to missile impact is determined by integrating the equation of motion or by using a simplified expression adopted from the equation of motion. This is compared with the maximum allowable deflection (or allowable ductility ratio),

in accordance with ACI-349 (Reference 10).

The design of concrete members under impactive loads from design-basis tornado missiles is in compliance with Appendix A to SRP Section 3.5.3. Those members which see 3.5-23

impactive and impulsive loads due to pipe breaks have been designed using a nonlinear analysis assuming hinge rotations not exceeding 0.07 radians.

The experimental data on which this method is based is in Reference 13 (a PCA Bulletin).

b. Steel Plate Barriers - The thickness of steel plate required to resist the impacting Jesj-_g_n-basis missile is calculated using the Stanford Formula (Reference 8). The overall structural response, including structural stability and deformation is investigated using concepts and methods presented in Reference 9.
c. Control Rod Drive Missile Shield - A missile shield structure is provided over the control rod drive mechanisms to block missiles which might be associated with a fracture of the pressure housing of any mechanism. This missile shield is a reinforced steel structure attached to the reactor vessel head and located above the CRDMs. Each CRDM housing is terminated with a small tapered pin which penetrated the missile shield through a slightly larger diameter hole to direct the ejected CRDM missile into the shield. This prevents any missile from missing or ricocheting from the shield to strike the containment liner or other CRDM housings.

The walls of the refueling cavity protect the CRDMs from missiles originating from the horizontal direction.

Missile shield penetrations are given in Table 3.5-1 using the Ballistic Research Laboratories (BRL) formula for steel. The steel missile shield has an effective thickness of approximately 3 inches.

For the case of housing plug and drive shaft impact, which is the design case, it is assumed that the plug partially perforates the missile shield. The drive shaft then hits the plug and further penetrates the steel missile shield. The resultant penetration into the shield is 0.773 inches. Therefore, the effective thickness of the steel missile shield is more than three times the combined penetration value for the design case.

The CRDM missile shield is also designed to withstand the dynamic impact loads due to the missile and the water jet.

It is to be noted that the location of the secondary shield wall inside the containment structure is such that no potential missile will strike the containment liner.

3.5-24

REVISION 4 - DECEMBER 1992

B/B-UFSAR 3.5.4 Analvsis of Missiles Generated by a Tornado Effects of tornado missiles have been assessed for safety-related components located outdoors. These components are the SXCTseseential se_ry+/-^^ water ^^^' i-g tewe-r-s (Byron only),, the emergency diesel generator exhaust stacks, the emer g ency diesel generator ventilation and combustion air intakes, the emergency diesel generator crankcase vents, the fuel deer, and the main steam safety and power operated relief valve sta-tailpipes (Braidwood only).

3.5.4.1 Essential Service Water Cooling Towers (Byron)

^~F eeterl fr^m te rn de m-~i ss J.

~~~Z~ZT. Q~~

RZ~1 L. e.J.

a n-s-an met e rn

e. fan di=ives, U.

SS Tom'

An and to

ldrrair -nt "+ lre ^v,^n~ nnn -

^r t

^rn ara^

mi

r^.

eeelinGf eapability

s in U1SAl^

eleseribed Ceetie

the.Lme t

}.w

, 'e^

ee^e

-9.2.5.3.1.1.2

anEi

Eiepend^nt iTFS R C^et i ^n l

d z bee

in

., g

ewer-merle TI-se fellewing inputs A:n the and assufftptiens weLce used

analysis.,

WIN

  • 11 M 111 M

=

WE M

-1 r

1

r

`

~

it `

~

` ~ ~ ~ ~ ~

O-

03100 ~9L I

ri*

~~ r 2

=

3.5-25-Ul REVISION 15 - DECEMBER 2014 1

3.5-25j2j REVISION 15 - DECEMBER 2014 1

B/B-UFSAR 1aezfftalrzirc

ri

Rum -temperature of -100 2 F, lfftpaet to--adyeEse

--- safety le st:Lclke en

}a-s s i ll e e e ii ld lg e t-e to t i al l

-~, affta g e --the

--a3-i- :intake -

vent-ilati---. st _ffi feE-Eli-lr siolT h

With-a les s ei ventilatien the switehgear feem tefftpeEature---eelilel eifeeeel the ne f, feefa Eiesi gTr-te

r~tife. Analysis e f the r-ee--

heat-idig event determined t

e fee

~-*~--t~3t.~~i-t~}pe-t-~-~e~f~.'r rre-be-i Q'vP--thE' - h e rm - _ e _-, r a n a l if zz e _- th e safety fiel--ar e l ~ a -r s 'e'ur q a t in the em fer at least 2 h s . This pvi des tiffie actions:

a.

Manual initiation of the deep well pump(s) is assumed to occur 1.5 hours into the event,

b.

Isolation of essential service water blowdown within two

hours,
c.

Isolation of the auxiliary feedwater telltale drains within two hours, and

d.

Isolation of the SXCT riser leakoff drains within two hours The analyses determined the SXCTs are capable of providinq 3.5-253) REVISION 15 - DECEMBER 2014

adequate heat removal and timely safe shutdown of both units. 3.5-25-L4-L REVISION 15 - DECEMBER 2014

3.5.4.2 Emergency Diesel Cenerator Exhaust Stacks The diesel generator exhausts are completely protected up to the point where they penetrate the tornado proof concrete enclosure on the auxiliary building roof. Above this point, they are exposed for about 35 feet as they travel vertically._= Analysis has es:~abllshed 4~hat the staeks ean be dafftaged te t=he eiEtent= tl:ia the flew area-19 iceelaeed te 50; ef the flew area withedt 4uelng thee Eiiesel pewer-eidtpiit. To prevent loss of diesel availability due to the exhaust stack damage, a rupture disc pressure relief device is installed on each diesel exhaust line. This relief device is located downstream of the silencer and inside the missile protection structure on the roof of the auxiliary building. Upon blockage of the stack, the rupture disc will open prior to backpressure increasing to the point that required diesel power is not available. The emergency diesel generators will therefore remain functional following any postulated tornado missile impact. 3-5-25a REVISION 15 - DECEMBER 2014

3.5.4.3 EmergeDfy_Diesel Generator Ventilation and Combustion A' ir Intakes and Crankcase Vents Ventilation and combustion air for the emergency diesels is inducted through tornado proof intakes in the auxiliary building roof. The emergency diesel engine crankcase vents are exposed to tornado missiles. Reference 14 demonstrates that the crankcase vent lines can be blocked without adversely affecting the ability of the associated diesel to perform its design function. 3.5.4.4 Fiael Handling Bidi!!~~Railread Freight 9e_er The railr-ead freight eleeiF is net elesigned te be ternade preef. in the event= the eleei- +/-s Fft+/-9s+/-ng er-epen, Fft+/-ssd:4:es we:alei p-etentially enteE the tiannel te the f:ael handling building. T& r-eaeh the fuel hanelling aEea, fftlssiles we:alel have te t=Eavel eveE 190 feet dewn the t:annel whieh J's 25 feet seluare. The twe fftest viiiner-able aEeas aEe the fuel peel heat eiEehange en the !ewer level and fuel steEage area en the uppeic level. Afteic negetlating the tiinnelf the fft4:ssile weuld have te Eftake a 90 degaFee tuEn and penet:eate a wall te elafftage elther-ef the heat eiEehangeEs (whleh aiFe Eedunelant) eE Eftake twe 90 EiegiFee t:aEns (idp and Eight) te iceaeh the fuel steinage aicea. Baseel en thi& assessffient, it is eenelideled that ter-neele fftissiles pese ne haz te the fuel handling building. 3.5.4.454-Main Steam Safety and Power Operated Relief Valve Tailpipes (Braidwood only} The Braidwood Unit 2 main steam safety and relief valve staeks tailpipes penetrate the valve room roof slightly over 25 feet above grade. The staeks-tailpipes-extend 7 feet above the roof. The exhaust of the power operated relief valve is in a recessed area between the valve room roof and the containment wall, and is, therefore, protected from horizontal missiles. The staeks tailpipes are 16 inch diameter pipe with 1/2 inch thick walls. All are located near the containment. Bending or breaking of the pipe would not seriously affect the function of the safety and relief valves. Because of the relatively short height of the pipes and the thickness of the walls, no significant denting or crimping of the pipes is expected. FeiF The Braidwood Unit 1 anel Byren Units 1 anel 2, themain steam safety valve 16 inch diameter 1/2 inch thick venom pipestailpipes extend approximately 1 foot above the MSSV roof and a maximum o 1.5 inches above a guard pipe. The guard pipe is a 20 inch diameter, 1/2 inch thick pipe. The combination of a short height above the roof and the installed guard pipe practically eliminates the possibility of a horizontal missile denting or crimping the MSSV vent plpeE _ The exhaust of the power operated relief valve is in a recessed area between the valve room upper roof and the containment wall, and is, therefore, protected from horizontal missiles. The Byron main steam safety and power operated relief valve 3.5-26 REVISION 16 - DECEMBER 2016

B/B-UFSAR tailpipes are evaluated in Byron only Section 3.5.5. 3.5.4.5 Fuel Handling Building Railroad Freight Door 3.5.4.6 Essential Service Water Discharge Extension Lines (Braidwood only) The Non-Safety Related portions of the Essential Service Water (SX) discharge extension lines extend approximately 3 feet above lake level and they are attached to the safety related portion of the SX discharge piping at the discharge structure via a flanged connection. Analysis has demonstrated that the flange connection will fail and separate before the SX extension pipe stress reaches the yield stress of the pipe material, i.e. the extension pipe section will remain in the elastic behavior zone without plastic deformation due to a force generated by a horizontal missile. Therefore, the SX discharge flow path is not adversely impacted by a Tornado generated horizontal missile striking the exposed SX discharge extension lines. 3.5-26a REVISION 15 - DECEMBER 2014

3.5.5.1 Scope 3.5.5.2 Computer Codes 3.5.5.2.1 TORMIS 3.5.5.2.2 TORRISK BYRON-UFSAR 3.5.5 Probabilistic Tornado Missile Risk Analysis TORRISK (TORnado RISK Analysis Methodology Computer Code) is a specialized version of TORMIS that produces tornado hazard curves distinct from the missile risk analysis features of TORMIS. TORRISK is a fast-running version of TORMIS and was spun-off in 1983 specifically for the purpose of tornado wind probability analysis for the different types of geometrical targets, like points, buildings, sites and transmission lines. TORRISK uses the same tornado input data as TORMIS and produces tornado wind hazard risks only. TORRISK produces a more accurate wind hazard curve than TORMIS since it is not encumbered with all of the TORMIS missile simulation variance reduction methods. 3.5-26b

BYRON-UFSAR 3.5.5.2.3 TORSCR 3.5.5.2.4 LS-DYNA 3.5.5.3 Analysis e arithmetic sum of dama fecting the individual u mponents and Unit plus ceptable threshold fregu P Section 2.2.3 and Refe e following limiting in_ alvsis (refer to Referen fissile risk analysis xe freauencies or a target qro s common e lower tha d in the 3.5-26c

BYRON-UFSAR 3.5-26d

3.5..&6 References

1. J. M. Vallance, A Study of the Probability of an Aircraft Using Waukegan Memorial Airport Hitting the Zion Station, Pickard, Lowe and Associates, Inc., Washington, D.C., 1972.
2. Clair Billington, FAA, Telephone conversations with H. H.

Hitzeman, Senior Engineering Analyst, Sargent & Lundy, August 5. 1977 and August 9, 1977.

3. John W. Ryan, FAA, Telephone conversation with H. H.

Hitzeman, Senior Engineering Analyst, Sargent & Lundy, September 7, 1977.

4. Annual Review of Aircraft Accident Data - U.S. General Aviation - Calendar Year 1970. National Transportation Safety Board, Washington, D.C., Report Number NTSB-ARG-74-1, April 18, 1974.
5. Annual Review of Aircraft Accident Data - U.S. General Aviation - Calendar Year 1969, National Transportation Safety Board, Washington, D.C., Report Number NTSB-ARG-71-1, April 28, 1971.
6. A. Amirikian, "Design of Protective Structures." Bureau of Yards and Docks, Publication No. NAVDOCKS P-51, Department of the Navy, Washington, D.C., August 1950.
7. J. M. Doyle, H. J. Klein, and H. Shah, "Design of Missile Restraint Concrete Panels," Second International Conference on Structural Mechanical in Reactor Technology, Berlin, Germany, September 1973.
8. W. B. Cottrell and A. W. Savolainen, "U.S. Reactor Containment Technology," ORNL-NSIC-5,, Vol. 1, Chapter 6, Oak Ridge National Laboratory, August 1965.
9. R. A. Williamson and R. R. Alvy, "Impact Effect of Fragments Striking Structural Elements." Holmes and Naver, Inc., Revised November 1973.
10. ACI 349, Code Requirements for Nuclear Safety Related Concrete Structures, 1976.
11. P. Gottlieb,, "Estimation of Nuclear Power Plant Aircraft Hazards," Probabilistic Analysis of Nuclear Reactor Safety, r-Proceedings of the American Nuclear Society Topical Meeting (May 8-10, 1978, Los Angeles, California), p. VIII.8. 1 to 8.
12. "A Manual for the Prediction of Blast and Fragment Loadings On Structures,," DOE/TIC-11268., U.S. Department of Energy.,

November 1980. 3.5-27

B/B-UFSAR

13. A. H. Motloch, "Rotational Capacity of Hinging Regions in Reinforced Concrete Beams," from Proceedings of the International Symposium on Flexural Mechanics of Reinforced Concrete, American Society of Civil Engineers, 1965.
14. Design Analysis 3101-0039-01, "Calculation of EDG (Emergency Diesel Generator) Crankcase Pressure Assuming the Crankcase Vent Line is Blocked."
15. Design Analysis ARA-002116, "Tornado Missile TORMIS Analysis of [Byron Generating Stationl BGS," Revision 3.
16. Electric Power Research Institute Report - EPRI NP-768, "Tornado Missile Risk Analysis," May 1978.
17. Electric Power Research Institute Report - EPRI NP-769, "Tornado Missile Risk Analysis - Appendices," May 1978.
18. Electric Power Research Institute Report - EPRI NP-2005 Volumes 1 and 2, "Tornado Missile Risk Evaluation Methodology,"

August 1981.

19. NRC Safety Evaluation Report - "Electric Power Researc Institute (EPRI) Topical Reports Concerning Tornado Missile
20. NRC Regulatory Issue Summary 2008-14, "Use of TORMIS Computer Code for Assessment of Tornado Missile Protection,"

dated June 16, 2008 (ML080230578).

21. Memorandum from Harold Denton, NRR Director to Vi ional Operation Generic Reauirements, "Position of Use of Probabilistic Risk nt in Tornado Licensing Actions," dated November 7, 1 3.5-28

REVISION 15 - DECEMBER 2014

TABLE 3.5-3 DESIGN-BASIS TORNADO-GENERATED MISSILES AND THEIR PROPERTIES HEAD ON WEIGHT LENGTH CONTACT AREA MISSILE (lb) CROSS SECTION (ft) (in2) A. Wood 200 4 in. x 12 in. 12 48.00 B. 3-inch Schedule 40 steel pipe 78 3.5 in. OD 10 9.62 C. Steel rod 8 1-in. diameter 3 0.79 D. 6-inch Schedule 40 steel pipe 285 6.625 in. OD 15 34.50 E. 12-inch Schedule 40 steel pipe 743 12.75 in. OD 15 127.70 F. Utility pole 1,490 13.5 in. diameter 35 143.10 G. Automobile 4,000 2,880.00 3.5-33

HORIZONTAL IMPACT VELOCITY MISSILE (fps) A. Wood plank (4 in. x 12 in. x 12 ft, weight 200 lb) 368 B. Steel pipe (3 in. diameter, Schedule 40, 10 ft long, weight 78 lb) 268 C. Steel rod (1 in. diameter x 3 ft long, weight 8 lb) 259 D. Steel pipe (6 in. diameter, Schedule 40, 15 ft long, weight 285 lb) 230 E Steel pipe (12 in. diameter, Schedule 40, 15 ft long, weight 743 lb) 205 F. Utility pole (13.5 in. diameter, 35 ft long, weight 1490 lb) 241 G. Automobile (frontal area 20 ft2, weight 4000 lb) 100 Vertical impact velocities are taken equal to 80% of the horizontal impact velocities. 3.5-34

BYRON-UFSAR TABLE 3.5-17 TARGETS EVALUATED IN TORMIS ANALYSIS TARGET NUMBER FAILURE NOTES OF MODE(S) TARGETS SXCT Riser Pipes SXCT Fan Motors and Power Feeds SXCT Fan Gear Box Oil Level Gauges SXCT Personnel Hatches SXCT Fan Inspection Hatches SXCT Fan Blades SXCT Anti-Vortex Boxes and Trash Screens SXCT Switchgear Room Ventilation Louvers 8 Perforation SXCT Cells A-H and Crimping 8 Missile Hit SXCT Cells A-H 8 Missile Hit SXCT Cells A-H 8 Perforation SXCT Cells A-H 8 Perforation SXCT Cells A-H 8 Missile Hit SXCT Cells A-H 2 Perforation North and South 4 Perforation Division 11 (Bus 131Z), 12 (Bus 1322), 21 (Bus 231Z) and 22 (Bus 2322) 2 Crimping Unit 1 and Unit 2 2 Crimping Unit 1 and Unit 2 8 Pipe Unit 1 (4) and Penetration Unit 2 (4) and Crimping Diesel Driven Auxiliary Feedwater Pump Exhaust Pipes Diesel Driven Auxiliary Feedwater Pump Exhaust Cover Plates Steam Generator Power Operated Relief Valve Tailpipes 3.5-48

BYRON-UFSAR TABLE 3.5-17 (cont'd) TARGET NUMBER FAILURE NOTES OF MODE(S) TARGETS Main Steam Safety 40 Pipe Unit 1 (20) and Valve Tailpipes Penetration Unit 2 (20) Deep Well Pump 2 Spall Pumps OA and OB Enclosures Embedded Conduits 4 Perforation Division 11 (Bus (Auxiliary Building 131Z), 12 (Bus 1322, South Wall) 21 (Bus 2312) and 22 (Bus 232Z) Cable Vaults - 6 Spall Division 11 (1G1), Division 11 (Bus 12 (1H2 and 1J2), 21 131Z), 12 (Bus 132Z), (2G1) and 22 (2H2 21 (Bus 231Z) and 22 and 2J2) (Bus 2322) Auxiliary Building L 2 Pipe OA and OB Main Line Openings Penetration Control Room Turbine Building Makeup Air Intakes Auxiliary Building L 4 Pipe Division 11, 12, 21 Line Openings Penetration and 22, Miscellaneous Electrical Equipment Room Exhaust' Non-ESF Switchgear 5 Perforation Division 11 and 21 Room Conduits SXCT Power and Control Cables (Evaluated in Segments) In a limited number of cases, the exhaust path may be impacted. Therefore, manual action is relied on to restore ventilation. These manual actions entail simple activities to open doors (to provide an exhaust path) and restart supply fans. 3.5-49}}