Advisement of Leadership Changes for Exelon Generation Company, Llc., NRC, Submission of Standard Practice Procedure Plans and Foreign Ownership Control or Influence Package, Dated July 2, 2014
ML15223A643
Person / Time
Site: Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Ginna, Clinton, Quad Cities
Issue date: 08/11/2015
From: Simpson P
Exelon Generation Co
To:
Document Control Desk, Division of Security Operations
Shared Package
ML15223A641 List:
References
RS-15-229
Download: ML15223A643 (3)


Text

4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office The Attachment contains personally identifiable information. Withhold from public disclosure under 10 CFR 2.390. When separated from the Attachment, this cover letter is decontrolled.

RS-15-229 10 CFR 95.17 August 11, 2015 ATTN: Document Control Desk Director, Division of Security Operations Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 NRC Docket Nos. 50-220 and 50-410 The Attachment contains personally identifiable information. Withhold from public disclosure under 10 CFR 2.390. When separated from the Attachment, this cover letter is decontrolled.

The Attachment contains personally identifiable information. Withhold from public disclosure under 10 CFR 2.390. When separated from the Attachment, this cover letter is decontrolled.

August 11, 2015 U.S. Nuclear Regulatory Commission Page 2 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket Nos. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Advisement of Leadership Changes for Exelon Generation Company, LLC

Reference:

Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S. NRC, "Submission of Standard Practice Procedure Plans and Foreign Ownership Control or Influence Package," dated July 2, 2014 In the Reference, Exelon Generation Company, LLC (EGC) submitted an updated Foreign Ownership, Control, or Influence (FOCI) package to the NRC for review for the nuclear power plants listed above. In accordance with 10 CFR 95.17, "Processing facility clearance," EGC is notifying the NRC of a change that affects information included in the Reference. Specifically, recent organizational changes that affect the Owners, Officers, Directors, and Executive Personnel (OODEP) list for EGC became effective. The Attachment supplements the referenced submission, and provides an updated OODEP list for Exelon Corporation and EGC.

Portions of the Attachment contain Personally Identifiable Information that, if made public, would constitute a clearly unwarranted invasion of personal privacy. Accordingly, it is respectfully requested that the information in the Attachment be withheld from public disclosure in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding,"

paragraph (a)(6). Because EGC seeks to withhold this Attachment in its entirety, a nonproprietary version of the Attachment has not been prepared.

The Attachment contains personally identifiable information. Withhold from public disclosure under 10 CFR 2.390. When separated from the Attachment, this cover letter is decontrolled.

The Attachment contains personally identifiable information. Withhold from public disclosure under 10 CFR 2.390. When separated from the Attachment, this cover letter is decontrolled.

August 11, 2015 U.S. Nuclear Regulatory Commission Page 3 There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact me at (630) 657-2823.

R Patrick R. Simpson Manager - Licensing R