ML091870842

From kanterella
Jump to navigation Jump to search

Withdrawal of an Amendment Request (TAC Nos. MD7539 and MD7540)
ML091870842
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 07/07/2009
From: Gratton C
Plant Licensing Branch III
To: Pardee C
Exelon Nuclear
gratton c
References
TAC MD7539, TAC MD7540
Download: ML091870842 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 July 7, 2009 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. MD7539 AND MD7540)

Dear Mr. Pardee:

By letter dated December 21, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML073580004), you applied for an amendment to the Quad Cities Nuclear Power Station, Units 1 and 2, Renewed Facility Operating License Nos. DPR-29 and DPR-30. The proposed change would have modified the facility revised the technical specifications surveillance requirements to establish an acceptance criterion to verify that total battery connector resistances for the 125 and 250 volt direct current batteries are within pre-established limits that ensure the batteries can perform their design function. Subsequently, by letter dated June 25,2009 (ADAMS Accession No. ML091770381), you withdrew the amendment request.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

.Sincerely, (J~~

Christopher Gratton, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-254 and 50-265

Enclosure:

Notice of Withdrawal cc w/encl: Distribution via Listserv

7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION EXELON GENERATION COMPANY, LLC DOCKET NOS. 50-254 AND 50-265 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of Exelon Generation Company, LLC (the licensee), to withdraw its December 21,2007, application for proposed amendment to Renewed Facility Operating License Nos. DPR-29 and DPR-30 for the Quad Cities Nuclear Power Station, Units 1 and 2, located in Rock Island County, Illinois.

The proposed amendment would have revised the Technical Specifications Surveillance Requirements to establish an acceptance criterion to verify that total battery connector resistances for the 125 and 250 volt direct current batteries are within pre-established limits that ensure the batteries can perform their design function.

The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on February 26,2008 (73 FR 10298), and December 30, 2008 (73 FR 79932). However, by letter dated June 25, 2009, the licensee withdrew the proposed change.

For further details with respect to this action, see the application for amendment dated December 21,2007, and the licensee's letter dated June 25,2009, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records

- 2 will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr.resource@nrc.gov.

h Dated at Rockville, Maryland, this i day of July 2009.

FOR THE NUCLEAR REGULATORY COMMISSION Christopher Gratton, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

July 7,2009 Mr. Charles G. Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. MD7539 AND MD7540)

Dear Mr. Pardee:

By letter dated December 21, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML073580004), you applied for an amendment to the Quad Cities Nuclear Power Station, Units 1 and 2, Renewed Facility Operating License Nos. DPR-29 and DPR-30. The proposed change would have modified the facility revised the technical specifications surveillance requirements to establish an acceptance criterion to verify that total battery connector resistances for the 125 and 250 volt direct current batteries are within pre-established limits that ensure the batteries can perform their design function. Subsequently, by letter dated June 25, 2009 (ADAMS Accession No. ML091770381), you withdrew the amendment request.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Registerfor publication.

Sincerely, IRA!

Christopher Gratton, Senior Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-254 and 50-265

Enclosure:

Notice of Withdrawal cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC Branch Reading LPL3-2 RidsNrrDorlDpr Resource RidsNrrDorlLpl3-2 Resource RidsNrrLATHarris Resource RidsNrrPMQuad Cities Resource ADAMS Accession Nos.: LTR (NRR-106) ML091870842 FRN (ADM-012) ML091880147 OFFICE NRRlLPL3-2/PM NRRlLPL3-2/LA NRRlLPL3-2/BC NAME CGratton THarris SCampbell DATE 0717109 0717109 0717109 OFFICIAL AGENCY RECORD