RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-13

From kanterella
Jump to navigation Jump to search
Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 2, Figure 2.5-13
ML16166A077
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/25/2016
From:
South Carolina Electric & Gas Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16166A068 List: ... further results
References
RC-16-0083
Download: ML16166A077 (1)


Text

N KEY: ROCK TYPE FORMATION CBGN CHARLOTTE BEU GNE I 55.....3RANOFELS-(: IATED OR GNEI SSIC ROCK, GF DF GRAN I Tl C TEXTURE AND COMPOS IT JON)ME T AMQRPH t c MG l.t'Gf.4 A.TlTE (MIXTURE OF 6NE I 55'C AND OTHER ROCKS)58 SLATE BELT METAMORPH I CS (SCHI ST05E)IGNEOUS GO GRANDa I OR 1 iE-AOAMELL I TE CDN1ACT PROBABLE CONTACT----TRACE OF INFERRED FAUL TSTRIKE AND DIP OF FOLIATION-+-VERT I CAL R.d DIABASE OIK£STRIK=: AND DIP OF COMPOSITIONAL BANOlfl:G-t-VERTJ CAL A OI5PLACE'lENT

!'"f;ATURts

_-+_INFERRED SYNCLlIIE"OTE, GEOLOGY EAST or LONG.81 0 15'ANO SOUTH or A LINE ORAWN BEntEEN 00.4.BY D.T.SECOR AND H.D.WAGENER", AND"GEOLOGY OF SOUTHERN n.O-THIRDS or THE WIf\NSBORO

'5-MINUTE QUADRANGLE.

SOUTH CAROLINA" 1970.BY H.D.*WAGENER MS-17 OIVISION or GEOLOGY, COLl18IA, s.c.RErERENCE, THE BASE roR THIS ,lAP WAS PREPARED rROM ENLARGEO PORTIONS OF*'THE rOLLOWING SvUTH CAROLINA STATE HIGf.,n DEPARTMENT GENERAL HIGH'JAY MAPS, LEXINGTON COUNTY 1958, REViSED 1970, NEWBERRY COUNTY'961, REVISED 19iO, rAIRrlELO

'962, REViSED 1970, ANO CCUNTY 1963;REVISEO 1969.STATUTE MILES 1 0 1 bJ ,I""" SOUTH CAROLINA ELECTRIC&GAS CO.VIRGIL C.SUMMER NUCLEAR STATION Areal Geologic Map Figure 2.5-1]