RBG-47756, Response to Regulatory Issue Summary 2017-03

From kanterella
Jump to navigation Jump to search
Response to Regulatory Issue Summary 2017-03
ML17135A288
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/09/2017
From: Schenk T
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG-47756, RIS-2017-03
Download: ML17135A288 (2)


Text

'-=--'Enter~

Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Tel 225-381-4177 Timothy A. Schenk~

Manager - Regulatory Assurance RBG-47756 May 9, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Response to Regulatory Issue Summary 2017-03 River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47 RBF1-17-0055

Dear Sir or Madam:

On April 5, 2017, NRC issued Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations, to request information related to future licensing examinations for operators. As pertaining to River Bend Station, Entergy Operations, Inc. herein submits the requested information on the attached NRC Form 536.

This document contains no commitments. If you have any questions, please contact Mr. Sid Durbin at 225-378-3313.

Sincer~ly, ~/ //

TAS/dhw v~

Attachment cc: U. S. Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd.

Arlington, Texas 76011-4511 NRC Sr. Resident Inspector River Bend Station

~

.)

  • f NRC FORM 536., U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150*0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply wilh Jhis voluntary infonnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This r.,'-t>P. REolt~'f>.

..~ information collection is used to plan budgets and resources for operator examinations. Send 0

~ ~na OPERATOR LICENSING comments regarding burden estimate to Jhe FOIA, Privacy, and Information Collections Branch (T-5

~ ' c F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-000t, or by e-mail to

~ J EXAMINATION DATA lnlocollects.Resource@nrc.gov, and to Iha Desk Officer, Office of Information and Regulatory Affairs,

<t;_..')

...... .,. . +.# NEOB-10202, (3150-0131), Office of Management and Budgel Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, Jhe NRC may not conduct or sponsor, and a person is not required to respond to, Jhe lnfonnation collection.

FACILITY NRC REGION River Bend Station IV

/

A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 19 CY 20 CY 21 CY 22 PROPOSED NUMBER ESTIMATED NUMBER OF I LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 19 CY 20 CY 21 CY 22 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 6 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1 I/18/2019 12/06/2021 ALTERNATE DATE 12/09/2019 12/13/2.021

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY

- 18 SEPTEMBER MARCH CY

- 20 SEPTEMBER ESTIMATED NUMBER OF IO 0 IO 0 CANDIDATES NRC FORM 536 (05-2016)