RBG-47631, Supplemental Response to Regulatory Issue Summary 2015-05

From kanterella
(Redirected from RBG-47631)
Jump to navigation Jump to search
Supplemental Response to Regulatory Issue Summary 2015-05
ML15356A780
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/18/2015
From: Clark J
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG-47631, RIS-2015-05
Download: ML15356A780 (2)


Text

Entergy Operations, Inc.

SEn tergy River Bend Station 5485 U. S. Highway 61 St. Francisville, LA 70775 Tel 225 381 4177 Fax 225381 4139 jclark@entergy.com Joseph A. Clark Manager, Regulator' Assurance RBG-47631I Novemb*er 18, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Supplemental Response to Regulatory Issue Summary 201 5-05 River Bend Station - Unit I Docket No. 50-458

  • License No. NPF-47 RBFI-15-0183

Dear Sir or Madam:

On April 20, 2015, NRC issued Regulatory Issue Summary 2015-05, Preparationand Scheduling of OperatorLicensing Examinations, to request information related to future licensing examinations for operators. As pertaining to River Bend Station (RBS),

Entergy Operations, Inc. submitted the requested information in a letter dated May 26, 2015 (which was revised* in asupplemental letter submitted on~ September 8, 2015).

This letter supplements those previous responses to account for recent changes in the planning for future operator license examinations.

This document contains no commitments. If you have any questions, please contact Mr.

Sid Durbin at 225-378-3313.

JAC/dhw Attachment cc: . U. S. Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd.

Arlington, Texas 76011-4511 NRC Sr. Resident Inspector River Bend Station bAcc~

NIRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 10131/2017 (01-2015) cn~j,,~az Estimated burden per response to comply with this voluntary information collection request: 1

  • -*. *o.*,hour. This information collection is used to plan budgets and resources for operator

"* 2. examinationa. Send comments regarding burden estimate to the FOIA, Privacy, and Information

  • . I I- O IC N I GCollections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC EXAM INATION DATA 20555-000, or by intemet e-mal to lnfocotlecs.Resourc,@nrc.gov, and to the Desk Offier,

'**** Ofic of nfomaton ad RgultoryAffirs NEO-1002,(3150-0131), Office of Management and Budget, Washington, DC 20503. Ifa means used to impose an information collection does sot display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

r:ACILITY NRC REGION River Bend Station 4 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY 2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 2 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 40/ 6 OPERATORS NUMBER OF SENIOR REACTOR 36 /4 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 20 /2 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS- LIMITED PROPOSED DATES PRIMARY DATE 09/12/16 03/26/18 & 09/17/18 ALTERNATE DATE 10/10/16 04/23/18 & 10/15/18 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED _____________ ____ ___________

NUBR MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER*

ESTIMATED NUMBER OF 6 10 CANDIDATES NRC FORM 536 (01-2015),

Entergy Operations, Inc.

SEn tergy River Bend Station 5485 U. S. Highway 61 St. Francisville, LA 70775 Tel 225 381 4177 Fax 225381 4139 jclark@entergy.com Joseph A. Clark Manager, Regulator' Assurance RBG-47631I Novemb*er 18, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Supplemental Response to Regulatory Issue Summary 201 5-05 River Bend Station - Unit I Docket No. 50-458

  • License No. NPF-47 RBFI-15-0183

Dear Sir or Madam:

On April 20, 2015, NRC issued Regulatory Issue Summary 2015-05, Preparationand Scheduling of OperatorLicensing Examinations, to request information related to future licensing examinations for operators. As pertaining to River Bend Station (RBS),

Entergy Operations, Inc. submitted the requested information in a letter dated May 26, 2015 (which was revised* in asupplemental letter submitted on~ September 8, 2015).

This letter supplements those previous responses to account for recent changes in the planning for future operator license examinations.

This document contains no commitments. If you have any questions, please contact Mr.

Sid Durbin at 225-378-3313.

JAC/dhw Attachment cc: . U. S. Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd.

Arlington, Texas 76011-4511 NRC Sr. Resident Inspector River Bend Station bAcc~

NIRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 10131/2017 (01-2015) cn~j,,~az Estimated burden per response to comply with this voluntary information collection request: 1

  • -*. *o.*,hour. This information collection is used to plan budgets and resources for operator

"* 2. examinationa. Send comments regarding burden estimate to the FOIA, Privacy, and Information

  • . I I- O IC N I GCollections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC EXAM INATION DATA 20555-000, or by intemet e-mal to lnfocotlecs.Resourc,@nrc.gov, and to the Desk Offier,

'**** Ofic of nfomaton ad RgultoryAffirs NEO-1002,(3150-0131), Office of Management and Budget, Washington, DC 20503. Ifa means used to impose an information collection does sot display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

r:ACILITY NRC REGION River Bend Station 4 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY 2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 2 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 40/ 6 OPERATORS NUMBER OF SENIOR REACTOR 36 /4 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 20 /2 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS- LIMITED PROPOSED DATES PRIMARY DATE 09/12/16 03/26/18 & 09/17/18 ALTERNATE DATE 10/10/16 04/23/18 & 10/15/18 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED _____________ ____ ___________

NUBR MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER*

ESTIMATED NUMBER OF 6 10 CANDIDATES NRC FORM 536 (01-2015),