RBG-47613, Supplemental Response to Regulatory Issue Summary 2015-05

From kanterella
Jump to navigation Jump to search
Supplemental Response to Regulatory Issue Summary 2015-05
ML15272A177
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/08/2015
From: Clark J
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG-47613, RIS-15-005
Download: ML15272A177 (2)


Text

River Bend Station

~5485 i Entergy Operations, U. S. Highway 61Inc.

  • " *!*1' Er* t*/*l~~lr~eISt. Francisville, LA 70775Fx2553184197 jclark@entergy.com Joseph A. Clark Manager, Regulatory Assurance RBG-47613 September 8, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

supplemental Response to Regulatory Issue Summary 2015-05 River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47 RBFI 0148

Dear Sir or Madam:

On April 20, 2015, NRC issued Regulatory Issue Summary 201 5-05, Preparationand Scheduling of OperatorLicensing Examinations, to request information related to future licensing examinations for operators. As pertaining to River Bend Station (RBS),

Entergy Operations, Inc. submitted the requested information-in a letter dated May 26, 2015. This letter supplements that previous response to account for recent changes in the. planning for future operator license examinations.

This document contains no commitments. If you have any questions, please contact Mr.

Sid Durbin at 225-378-3313.

JAC/dhw Attachment cc: U. S. Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd.

Arlington, Texas 76011-4511 NRC Sr. Resident Inspector River Bend Station

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 1013112017 (01-2015) *.s *u. Estimated burden per response to comply with this voluntary information collection request: 1

,f,* . .. o&hour. This information collection is used to plan budgets sod resources for operator a' '". sexminations. Send comments regarding burdes estimate to the FOIA, Privacy, and Information OPEATR ICNSNGCollections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC

"* *.*.*I Oficeof Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management ndBdeWashington, DC 20503. Ifsameans used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a psrson ia not required to respond to, the information collection.

FACILITY NRC REGION River Bend Station 4 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY 2018 CY2019 CY2020 ESTIMATED NUMBER OF LICENSEE-PREPARED111 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2017 CY 2018 CY 2019 CY 2020 NUMBER OF REACTOR 4 66 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS -INSTANT144 NUMBER OF SENIOR REACTOR122 OPERATORS - UPGRADE2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRI MARY DATE 08/21/2017 09/17/2018 10/05/2020 ALTERN ATE DATE 09/18/2017 10/15/2018 11/02/2020 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED ____ ___ ____ _______

NUMBER MAC JUE SPEBRDCME MAC JUEE ERDCBR MARCH _JUN SEPTEMBER DECEMBER MARCH_ JUNE__ ~SEPTEBRDCM R ESTIMATED NUMBER OF 5 10 CANDIDATES NRC FORM 530 (01-2015)