Category:Financial Assurance Document
MONTHYEARRA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage 3F0123-01, Proof of Financial Protection2023-01-26026 January 2023 Proof of Financial Protection 3F0322-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20212022-03-30030 March 2022 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2021 3F0122-02, Proof of Financial Protection2022-01-17017 January 2022 Proof of Financial Protection ML21328A1782021-11-24024 November 2021 Certificate of Liability Insurance from Marsh USA, Inc. for Catawba, McGuire, Oconee, Brunswick, Crystal River, Shearon Harris, H.B. Robinson and Lee Nuclear Site 3F0421-03, Proof of Financial Protection2021-04-0707 April 2021 Proof of Financial Protection RA-21-0046, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2021-03-18018 March 2021 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-21-0047, Onsite Property Insurance Coverage2021-03-18018 March 2021 Onsite Property Insurance Coverage 3F0320-03, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20192020-03-19019 March 2020 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2019 RA-19-0186, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2019-04-0101 April 2019 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-19-0159, Stations - Biennial Decommissioning Financial Assurance Reports2019-03-28028 March 2019 Stations - Biennial Decommissioning Financial Assurance Reports 3F0319-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20182019-03-27027 March 2019 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2018 RA-18-0003, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2018-02-27027 February 2018 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-18-0002, H. 8. Robinson, Unit 2, Crystal River, Unit 3, Submittal of Onsite Property Insurance Coverage2018-02-27027 February 2018 H. 8. Robinson, Unit 2, Crystal River, Unit 3, Submittal of Onsite Property Insurance Coverage RA-16-0010, Duke Energy - Submittal of Onsite Property Insurance Coverage2016-03-31031 March 2016 Duke Energy - Submittal of Onsite Property Insurance Coverage RA-16-0015, Duke - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2016-03-31031 March 2016 Duke - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML16053A0932016-02-0101 February 2016 Certificate of Liability Insurance RA-15-0044, Indemnity Agreements for Proof of Acceptance2016-01-0707 January 2016 Indemnity Agreements for Proof of Acceptance RA-15-0014, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2015-03-31031 March 2015 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-15-0010, Submits Required Biennial Decommissioning Financial Assurance Reports2015-03-30030 March 2015 Submits Required Biennial Decommissioning Financial Assurance Reports RA-13-006, H. B. Robinson, Unit 2, Brunswick, Units 1 and 2, Shearon Harris, Unit 1, and Crystal River, Unit 3, Submittal of Biennial Decommissioning Financial Assurance Reports2013-03-28028 March 2013 H. B. Robinson, Unit 2, Brunswick, Units 1 and 2, Shearon Harris, Unit 1, and Crystal River, Unit 3, Submittal of Biennial Decommissioning Financial Assurance Reports RA-13-006, Biennial Decommissioning Financial Assurance Report2013-03-28028 March 2013 Biennial Decommissioning Financial Assurance Report ML13091A0252013-03-28028 March 2013 H. B. Robinson, Unit 2, Brunswick, Units 1 and 2, Shearon Harris, Unit 1, and Crystal River, Unit 3, Submittal of Biennial Decommissioning Financial Assurance Reports RA-13-007, Brunswick, Units 1 & 2, Catawba, Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1, McGuire, Units 1 & 2, Oconee, Units 1, 2 & 3, and H. B. Robinson, Unit 2, Submittal of Onsite Property Damage Insurance Coverage2013-03-28028 March 2013 Brunswick, Units 1 & 2, Catawba, Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1, McGuire, Units 1 & 2, Oconee, Units 1, 2 & 3, and H. B. Robinson, Unit 2, Submittal of Onsite Property Damage Insurance Coverage ML13091A0242013-03-28028 March 2013 Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1, McGuire, Units 1 & 2, Oconee, Units 1, 2 & 3, and H. B. Robinson, Unit 2, Submittal of Onsite Property Damage Insurance Coverage ML13091A0222013-03-28028 March 2013 Submittal of Biennial Decommissioning Financial Assurance Reports RA-12-013, Decommissioning Funding Status Report2012-03-26026 March 2012 Decommissioning Funding Status Report RA-12-011, Onsite Property Insurance Coverage2012-03-12012 March 2012 Onsite Property Insurance Coverage ML12073A3462012-03-0909 March 2012 Duke Energy Carolinas, LLC - 2012 Nuclear Energy Liability Program - Change in Subscribing Companies and in Their Proportional Liability Endorsements ML1123512402011-11-14014 November 2011 2010 DFS Report Analysis for Brunswick Steam Electric Plant, Unit 1 ML1123512412011-11-14014 November 2011 2010 DFS Report Analysis for Brunswick Steam Electric Plant, Unit 2 ML1123512842011-11-14014 November 2011 2010 DFS Report Analysis for Crystal River Nuclear Plant, Unit 3 ML1123700142011-11-14014 November 2011 2010 DFS Report Analysis for Harris (Shearon) Nuclear Power Plant ML1123718292011-11-14014 November 2011 2010 DFS Report Analysis for Robinson (H.B.) Plant, Unit 2 ML1123512562011-11-14014 November 2011 2010 DFS Report Analysis for Catawba Nuclear Station, Unit 1 ML1123512592011-11-14014 November 2011 2010 DFS Report Analysis for Catawba Nuclear Station, Unit 2 ML1123717612011-11-14014 November 2011 2010 DFS Report Analysis for Oconee Nuclear Station, Unit 3 ML1123717572011-11-14014 November 2011 2010 DFS Report Analysis for Oconee Nuclear Station, Unit 2 ML1123701382011-11-14014 November 2011 2010 DFS Report Analysis for McGuire (William B.) Nuclear Station, Unit 1 ML1123701572011-11-14014 November 2011 2010 DFS Report Analysis for Oconee Nuclear Station, Unit 1 ML11255A1862011-09-0808 September 2011 2011 Nuclear Energy Liability Program - Revised Advance Premium and Standard Premium Endorsement RA-11-008, Progress Energy - Evidence of Guarantee of Payment of Deferred Premiums2011-04-14014 April 2011 Progress Energy - Evidence of Guarantee of Payment of Deferred Premiums ML1109503662011-03-31031 March 2011 Crystal River Unit 3, Shearon Unit 1, and H.B. Robinson Unit 2, Biennial Decommissioning Funding Status Report RA-11-004, Brunswick Unit 1 & 2, Crystal River Unit 3, Shearon Unit 1, and H.B. Robinson Unit 2, Biennial Decommissioning Funding Status Report2011-03-31031 March 2011 Brunswick Unit 1 & 2, Crystal River Unit 3, Shearon Unit 1, and H.B. Robinson Unit 2, Biennial Decommissioning Funding Status Report ML1108800652011-03-24024 March 2011 Nuclear Energy Liability Program - Changes in Subscribing Companies and in Their Proportionate Liability Endorsements ML1108800642011-03-24024 March 2011 Submittal of American Nuclear Insurers Aggregate Shutdown Credit Return Premium ML1102603962011-01-24024 January 2011 Submittal of 2011 Nuclear Energy Liability Endorsements RA-10-010, Submittal of Biennial Decommissioning Funding Status Report Correction2010-05-18018 May 2010 Submittal of Biennial Decommissioning Funding Status Report Correction RA-10-006, Onsite Property Insurance Coverage2010-03-25025 March 2010 Onsite Property Insurance Coverage 2023-03-30
[Table view] Category:Letter type:RA
MONTHYEARRA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2024-02-0505 February 2024 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-01-10010 January 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-24-0015, Submittal of 2023 Sea Turtle Annual Report2024-01-10010 January 2024 Submittal of 2023 Sea Turtle Annual Report RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval2024-01-0404 January 2024 Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval RA-24-0006, 10 CFR 50.54(q) Evaluation2024-01-0404 January 2024 10 CFR 50.54(q) Evaluation RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2023-12-14014 December 2023 Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report2023-11-16016 November 2023 End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency2023-11-16016 November 2023 Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)2023-11-14014 November 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0) RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific2023-11-0606 November 2023 Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan2023-09-29029 September 2023 Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)2023-09-28028 September 2023 Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report2023-09-25025 September 2023 Refuel 27 (C1 R27) Inservice Inspection (ISI) Report RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals2023-09-21021 September 2023 Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 1752023-09-14014 September 2023 Registration for Use of General License Spent Fuel Cask Number 175 RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks2023-08-28028 August 2023 Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 1742023-08-23023 August 2023 Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 12023-08-23023 August 2023 On-Shift Staffing Analysis (Ossa), Revision 1 RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2023-08-22022 August 2023 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2023-08-18018 August 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-022023-08-17017 August 2023 Reply to a Notice of Violation (NOV) 05000270/2023010-02 RA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .2023-08-17017 August 2023 License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)2023-07-20020 July 2023 Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) RA-23-0186, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)2023-07-18018 July 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3) RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 1722023-07-10010 July 2023 Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0045, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 262023-06-28028 June 2023 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 26 RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record2023-06-28028 June 2023 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications2023-06-19019 June 2023 License Amendment Application to Revise Control Room Cooling Technical Specifications RA-23-0145, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks2023-06-15015 June 2023 Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0139, Registration for Use of General License Spent Fuel Casks2023-06-0606 June 2023 Registration for Use of General License Spent Fuel Casks RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations 2024-02-05
[Table view] |