|
---|
Category:Letter type:RA
MONTHYEARRA-24-0217, End of Cycle 25 (H1 R25) Inservice Inspection Program Owners Activity Report2024-09-0909 September 2024 End of Cycle 25 (H1 R25) Inservice Inspection Program Owners Activity Report RA-24-0180, Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, 10 CFR 54.37 Update, Technical Requirements Manuals, Technical Specification Bases, 10 CFR 50.59 and 10 CFR 72.48 Evaluation Summaries, and Commitment Change2024-08-29029 August 2024 Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, 10 CFR 54.37 Update, Technical Requirements Manuals, Technical Specification Bases, 10 CFR 50.59 and 10 CFR 72.48 Evaluation Summaries, and Commitment Change RA-24-0165, Response to Request for Additional Information (RAI) Regarding Proposed Alternative for the Fifth Ten-Year Inservice Inspection Interval Limited Examinations2024-07-26026 July 2024 Response to Request for Additional Information (RAI) Regarding Proposed Alternative for the Fifth Ten-Year Inservice Inspection Interval Limited Examinations RA-24-0178, Independent Spent Fuel Storage Installation (ISFSI) Docket No. 72-06 - Registration for Use of General License Spent Fuel Casks2024-07-10010 July 2024 Independent Spent Fuel Storage Installation (ISFSI) Docket No. 72-06 - Registration for Use of General License Spent Fuel Casks RA-24-0172, Supplement to a Request for Additional Information Response Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2024-07-0808 July 2024 Supplement to a Request for Additional Information Response Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-24-0173, Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld2024-06-28028 June 2024 Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld RA-24-0166, Revision to Emergency Plan Implementing Procedure2024-06-27027 June 2024 Revision to Emergency Plan Implementing Procedure RA-24-0164, Inservicee Inspection Program Owners Activity Report Refueling Outage 252024-06-19019 June 2024 Inservicee Inspection Program Owners Activity Report Refueling Outage 25 RA-24-0163, Registration for Use of General License Spent Fuel Casks2024-06-19019 June 2024 Registration for Use of General License Spent Fuel Casks RA-24-0154, Supplemental Information Supporting the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations2024-06-0707 June 2024 Supplemental Information Supporting the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations RA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable RA-24-0110, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical.2024-05-0909 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical. RA-24-0030, Duke Energy - Annual Radioactive Effluent Release Report - 20232024-04-29029 April 2024 Duke Energy - Annual Radioactive Effluent Release Report - 2023 RA-24-0083, Annual Report of Changes Pursuant to 10 CFR 50.462024-04-25025 April 2024 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-24-0031, Annual Radiological Environmental Operating Report - 20232024-04-23023 April 2024 Annual Radiological Environmental Operating Report - 2023 RA-24-0094, Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Traini2024-04-17017 April 2024 Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Training RA-24-0117, Cycle 26 Core Operating Limits Report, Revision O2024-04-16016 April 2024 Cycle 26 Core Operating Limits Report, Revision O RA-24-0099, Reactor and Senior Reactor Operator Initial Examination Outlines2024-04-10010 April 2024 Reactor and Senior Reactor Operator Initial Examination Outlines RA-24-0106, Annual Environmental (Non-Radiological) Operating Report2024-04-0909 April 2024 Annual Environmental (Non-Radiological) Operating Report RA-24-0097, Response to Request for Supplemental Information Supporting the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations2024-04-0303 April 2024 Response to Request for Supplemental Information Supporting the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations RA-24-0085, Onsite Property Insurance Coverage2024-04-0101 April 2024 Onsite Property Insurance Coverage RA-24-0086, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-04-0101 April 2024 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-24-0080, Duke Energy Progress, LLC - Request for Review of Master Curve Methodology to Determine the Fracture Toughness-based Reference Temperature Topical Reports2024-03-28028 March 2024 Duke Energy Progress, LLC - Request for Review of Master Curve Methodology to Determine the Fracture Toughness-based Reference Temperature Topical Reports RA-23-0244, Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2024-03-20020 March 2024 Application for Technical Specification Improvement to Extend a Completion Time of Technical Specification 3/4.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RA-24-0062, 10 CFR 50 .54(q) Evaluation2024-03-0404 March 2024 10 CFR 50 .54(q) Evaluation RA-24-0058, Cycle 25 Core Operating Limits Report (COLR)2024-03-0101 March 2024 Cycle 25 Core Operating Limits Report (COLR) RA-24-0033, Response to Request for Additional Information Regarding the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals2024-02-24024 February 2024 Response to Request for Additional Information Regarding the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals RA-23-0300, Fifth Ten-Year Inservice Inspection Interval Limited Examinations2024-02-15015 February 2024 Fifth Ten-Year Inservice Inspection Interval Limited Examinations RA-23-0008, Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations2024-02-0606 February 2024 Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) Using Risk-Informed Process for Evaluations RA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2024-02-0505 February 2024 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RA-24-0015, Submittal of 2023 Sea Turtle Annual Report2024-01-10010 January 2024 Submittal of 2023 Sea Turtle Annual Report RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-24-0006, 10 CFR 50.54(q) Evaluation2024-01-0404 January 2024 10 CFR 50.54(q) Evaluation RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0297, Transmittal of the Duke Energy Corporation Topical Report (Duke QAPD-001-A), Amendments 48, 49 and 502023-11-15015 November 2023 Transmittal of the Duke Energy Corporation Topical Report (Duke QAPD-001-A), Amendments 48, 49 and 50 RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific2023-11-0606 November 2023 Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals2023-09-21021 September 2023 Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2023-08-22022 August 2023 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2023-08-18018 August 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .2023-08-17017 August 2023 License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)2023-07-20020 July 2023 Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) 2024-09-09
[Table view] |
Text
M. ChristopherNolan SENERGY, DU ESAFEGUARDS INFORMATION When separated, this page is decontrolled.
526 South NC Charlotte, Church 28202Street Mailing Address:
Mail Code EC2ZF/P.O. Box 1006 Charlotte, NC 28201-1006 704-382-7426 10 CFR 50.4 10 CFR 50.54(p) 10 CER 72.44(e) 10 CFR 72.186(b)
December 22, 2015 RA-1 5-005 5 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT'S 1 AND 2 DOCKET NOS. 50-325, 50-324 / LICENSE NOS. DPR-71, DPR-62 BRUNSWICK INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 DOCKET NO. 50-261 I LICENSE NO. DPR-23 H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3 I LICENSE NO. SNM-2502 H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-60 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 I LICENSE NO. NPF-63
SUBJECT:
TRANSMITTAL OF DUKE ENERGY PROGRESS PHYSICAL SECURITY PLAN, REVISION 7 In accordance with 10 CFR 50.4(b)(4)(iii), 10 CFR 50.54(p)(2) and 10 CFR 72.44(e), Duke Energy Progress provides notification that the Duke Energy Progress- Brunswick, Robinson and HarrisNuclear Plants PhysicalSecurity Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, has been revised. The effective date of implementation for Revision 7 is November 2, 2015.
An evaluation of the plan revision in accordance with 10 CFR 50.54(p)(2) and 10 CFR 72.44(e) has determined that the changes incorporated do not decrease the overall level of physical SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-1 5-0055 Page 2 protection programs and security organization performance objectives and requirements as described in paragraphs (b) through (q) of 10 CER 73.55 and 10 CFR 72.212(b)(9).
This letter includes two enclosures which contain Safeguards Information as defined in 10 CFR 73.2 and must be protected from unauthorized disclosure in accordance with 10 CFR 73.21. Enclosure 1 contains a summary description of the Physical Security Plan revision changes. Enclosure 2 contains a copy of the Duke Energy Progress- Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program.
There are no new regulatory commitments made in this submittal. Should there be any questions regarding this submittal, please contact Art Zaremba at (980) 373-2062.
Sincerely, M. Christopher Nolan, Director Nuclear Regulatory Affairs
Enclosures:
- 1. Summary Description of Changes [SAFEGUARDS INFORMATION]
- 2. Copy of Duke Energy Progress- Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program (composite) [SAFEGUARDS INFORMATION]
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission IRA- 15-0055 Page 3 xc: (wi enclosures) [SAFEGUARDS INFORMATION]
U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 PeachtreeCenter Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 xc: (w/o enclosures)
M.C. Barillas, Project Manager (SHNPP & HBRSEP, Unit 2)
U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 A.L. Hon, Project Manager (BSEP)
U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 MP. Catts NRC Senior Resident Inspector Brunswick Steam Electric Plant, Unit Nos. I and 2 J.A. Hickey NRC Senior Resident Inspector H.B. Robinson Steam Electric Plant, Unit No. 2 J.D. Austin NRC Senior Resident Inspector Shearon Harris Nuclear Power Plant, Unit 1 SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-1 5-0055 Page 4 bxc: (wlo enclosures)
E.T. O'Neil T.W. King M.C. Nolan A.H. Zaremba T.J. Wadsworth J.L, Vaughan ELL File: (Corporate)
C.M. lsgett R. Hightower C. Caudell (For RNP Licensing/Nuclear Records)
A.K. Brittain L. Grzeck W.R. Murray (For BNP Licensing/Nuclear Records)
L. Faulk J. Caves C. Magner (For HNP Licensing/Nuclear Records)
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
M. ChristopherNolan SENERGY, DU ESAFEGUARDS INFORMATION When separated, this page is decontrolled.
526 South NC Charlotte, Church 28202Street Mailing Address:
Mail Code EC2ZF/P.O. Box 1006 Charlotte, NC 28201-1006 704-382-7426 10 CFR 50.4 10 CFR 50.54(p) 10 CER 72.44(e) 10 CFR 72.186(b)
December 22, 2015 RA-1 5-005 5 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT'S 1 AND 2 DOCKET NOS. 50-325, 50-324 / LICENSE NOS. DPR-71, DPR-62 BRUNSWICK INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 DOCKET NO. 50-261 I LICENSE NO. DPR-23 H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3 I LICENSE NO. SNM-2502 H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-60 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 I LICENSE NO. NPF-63
SUBJECT:
TRANSMITTAL OF DUKE ENERGY PROGRESS PHYSICAL SECURITY PLAN, REVISION 7 In accordance with 10 CFR 50.4(b)(4)(iii), 10 CFR 50.54(p)(2) and 10 CFR 72.44(e), Duke Energy Progress provides notification that the Duke Energy Progress- Brunswick, Robinson and HarrisNuclear Plants PhysicalSecurity Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, has been revised. The effective date of implementation for Revision 7 is November 2, 2015.
An evaluation of the plan revision in accordance with 10 CFR 50.54(p)(2) and 10 CFR 72.44(e) has determined that the changes incorporated do not decrease the overall level of physical SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-1 5-0055 Page 2 protection programs and security organization performance objectives and requirements as described in paragraphs (b) through (q) of 10 CER 73.55 and 10 CFR 72.212(b)(9).
This letter includes two enclosures which contain Safeguards Information as defined in 10 CFR 73.2 and must be protected from unauthorized disclosure in accordance with 10 CFR 73.21. Enclosure 1 contains a summary description of the Physical Security Plan revision changes. Enclosure 2 contains a copy of the Duke Energy Progress- Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program.
There are no new regulatory commitments made in this submittal. Should there be any questions regarding this submittal, please contact Art Zaremba at (980) 373-2062.
Sincerely, M. Christopher Nolan, Director Nuclear Regulatory Affairs
Enclosures:
- 1. Summary Description of Changes [SAFEGUARDS INFORMATION]
- 2. Copy of Duke Energy Progress- Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program (composite) [SAFEGUARDS INFORMATION]
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission IRA- 15-0055 Page 3 xc: (wi enclosures) [SAFEGUARDS INFORMATION]
U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 PeachtreeCenter Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 xc: (w/o enclosures)
M.C. Barillas, Project Manager (SHNPP & HBRSEP, Unit 2)
U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 A.L. Hon, Project Manager (BSEP)
U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 MP. Catts NRC Senior Resident Inspector Brunswick Steam Electric Plant, Unit Nos. I and 2 J.A. Hickey NRC Senior Resident Inspector H.B. Robinson Steam Electric Plant, Unit No. 2 J.D. Austin NRC Senior Resident Inspector Shearon Harris Nuclear Power Plant, Unit 1 SAFEGUARDS INFORMATION When separated, this page is decontrolled.
SAFEGUARDS INFORMATION When separated, this page is decontrolled.
U.S. Nuclear Regulatory Commission RA-1 5-0055 Page 4 bxc: (wlo enclosures)
E.T. O'Neil T.W. King M.C. Nolan A.H. Zaremba T.J. Wadsworth J.L, Vaughan ELL File: (Corporate)
C.M. lsgett R. Hightower C. Caudell (For RNP Licensing/Nuclear Records)
A.K. Brittain L. Grzeck W.R. Murray (For BNP Licensing/Nuclear Records)
L. Faulk J. Caves C. Magner (For HNP Licensing/Nuclear Records)
SAFEGUARDS INFORMATION When separated, this page is decontrolled.