RA-12-020, ISFSI; Crystal River, Unit 3; Shearon Harris, Unit 1 and H. B. Robinson, Unit 2 and ISFSI - NRC Correspondence Distribution List Update

From kanterella
Jump to navigation Jump to search
ISFSI; Crystal River, Unit 3; Shearon Harris, Unit 1 and H. B. Robinson, Unit 2 and ISFSI - NRC Correspondence Distribution List Update
ML12128A006
Person / Time
Site: Harris, Brunswick, Crystal River, Robinson, 07200006, 07200060, 07000003  Duke Energy icon.png
Issue date: 04/16/2012
From: Alexander D
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation, Office of Nuclear Material Safety and Safeguards
References
RA-12-020
Download: ML12128A006 (6)


Text

Pgress Energy PO Box 1551 411 Fayetteville Street Mall Raleigh NC 27602 Serial: RA-12-020 10 CFR 50.4 April 16, 2012 ATTN: Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 / RENEWED LICENSE NOS. DPR-71 AND DPR-62 BRUNSWICK STEAM ELECTRIC PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / RENEWED LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / RENEWED LICENSE NO. DPR-23 INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-60 INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3/LICENSE NO.

SNM-2502 NRC CORRESPONDENCE DISTRIBUTION LIST UPDATE Ladies and Gentlemen:

Carolina Power & Light Company (CP&L), now doing business as Progress Energy Carolinas, Inc., and Florida Power Corporation (FPC), now doing business as Progress Energy Florida, Inc., is providing an update to the service and distribution lists for NRC correspondence addressed to the Brunswick Steam Electric Plant, Unit Nos. 1 and 2; Crystal River Unit 3 Nuclear Generating Plant; Shearon Harris Nuclear Power Plant, Unit No. 1; and H. B. Robinson Steam Electric Plant, Unit No. 2. This update is being requested due to recent organizational changes within Progress Energy. The enclosures to this letter provide the update.

If you have any questions, please call me at (919) 546-5357.

Sincerely, Donna Alexander Manager - Nuclear Regulatory Affairs TZ Enclosures fritY0 9

" L SC05

United States Nuclear Regulatory Commission RA-12-020 Page 2 cc: USNRC Region II USNRC Resident Inspector - BSEP, Unit Nos. 1 and 2 USNRC Resident Inspector - CR3 USNRC Resident Inspector - SHNPP, Unit No. I USNRC Resident Inspector - HBRSEP, Unit No. 2 F. Saba, NRR Project Manager - BSEP, Unit Nos. I and 2; CR3 A. Billoch Col6n, NRR Project Manager - SHNPP, Unit No. 1; HBRSEP, Unit No. 2

United States Nuclear Regulatory Commission RA-12-020 ENCLOSURE 1 Page 1 of 1 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 / RENEWED LICENSE NOS. DPR-71 AND DPR-62 INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 NRC CORRESPONDENCE DISTRIBUTION LIST UPDATE Remove Add Phyllis Mentel Annette Pope Manager - Support Services Manager - Support Services Brunswick Steam Electric Plant Brunswick Steam Electric Plant P. 0. Box 10429 P. 0. Box 10429 Southport, NC 28461-0429 Southport, NC 28461-0429 Electronic Mail Distribution (Note: Electronic mail address is annette.pope@pgnmail.com)

Annette Pope Lee Grzeck Supervisor - Licensing/Regulatory Programs Supervisor - Licensing/Regulatory Programs Brunswick Steam Electric Plant (acting)

P. 0. Box 10429 Brunswick Steam Electric Plant Southport, NC 28461-0429 P. 0. Box 10429 Southport, NC 28461-0429 Electronic Mail Distribution (Note: Electronic mail address is lee.grzeck@pgnmail.com)

United States Nuclear Regulatory Commission RA-12-020 ENCLOSURE 2 Page 1 of 1 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 NRC CORRESPONDENCE DISTRIBUTION LIST UPDATE Remove Add James W. Holt Terry D. Hobbs Plant General Manager Plant General Manager Crystal River Unit 3 Nuclear Generating Plant Crystal River Unit 3 Nuclear Generating Plant 15760 West Power Line Street 15760 West Power Line Street Crystal River, FL 34428-6708 Crystal River, FL 34428-6708 Electronic Mail Distribution (Note: Electronic mail address is terry.hobbs@pgnmail.com)

United States Nuclear Regulatory Commission RA-12-020 ENCLOSURE 3 Page 1 of 1 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. I DOCKET NO. 50-400 / RENEWED LICENSE NO. NPF-63 NRC CORRESPONDENCE DISTRIBUTION LIST UPDATE Remove Add Richard Keith Holbrook Manager - Support Services (vacant)

Manager - Support Services Shearon Harris Nuclear Power Plant Shearon Harris Nuclear Power Plant Progress Energy Progress Energy 5413 Shearon Harris Road 5413 Shearon Harris Road New Hill, NC 27562 New Hill, NC 27562

United States Nuclear Regulatory Commission RA-12-020 ENCLOSURE 4 Page 1 of 1 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / RENEWED LICENSE NO. DPR-23 INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-60 INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3/LICENSE NO. SNM-2502 NRC CORRESPONDENCE DISTRIBUTION LIST UPDATE Remove .4.

Add Christos Kamilaris Sharon Wheeler Manager - Support Services Manager - Support Services H. B. Robinson Steam Electric Plant, Unit 2 H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy Progress Energy 3581 West Entrance Rd. 3581 West Entrance Rd.

Hartsville, SC 29550 Hartsville, SC 29550 Electronic Mail Distribution (Note: Electronic mail address is sharon.wheeler(pgnmail.com)

Greg Kilpatrick Richard Keith Holbrook Manager - Operations Manager - Operations H. B. Robinson Steam Electric Plant, Unit 2 H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy Progress Energy 3581 West Entrance Rd. 3581 West Entrance Rd.

Hartsville, SC 29550 Hartsville, SC 29550 Electronic Mail Distribution (Note: Electronic mail address is richard.holbrook@pgnmail.com)