Category:Environmental Monitoring Report
MONTHYEARPNP 2024-017, 2023 Annual Non-Radiological Environmental Operating Report2024-04-23023 April 2024 2023 Annual Non-Radiological Environmental Operating Report PNP 2024-008, Annual Radioactive Effluent Release Report2024-04-23023 April 2024 Annual Radioactive Effluent Release Report PNP 2024-009, Annual Radiological Environmental Operating Report2024-04-23023 April 2024 Annual Radiological Environmental Operating Report PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2022-004, 2021 Radiological Environmental Operating Report2022-05-12012 May 2022 2021 Radiological Environmental Operating Report PNP 2022-003, and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2022-007, 2021 Annual Non-Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Non-Radiological Environmental Operating Report PNP 2021-016, 2020 Radiological Environmental Operating Report2021-05-12012 May 2021 2020 Radiological Environmental Operating Report PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report2021-04-27027 April 2021 2020 Annual Non-Radiological Environmental Operating Report ML21111A1792021-04-21021 April 2021 2020 Annual Radioactive Effluent Release Report PNP 2020-017, 2019 Annual Non-Radiological Environmental Operating Report2020-04-15015 April 2020 2019 Annual Non-Radiological Environmental Operating Report PNP 2020-012, 2019 Radiological Environmental Operating Report2020-04-15015 April 2020 2019 Radiological Environmental Operating Report PNP 2019-016, & Big Rock Point - 2018 Annual Radioactive Effluent Release and Waste Disposal Report2019-04-24024 April 2019 & Big Rock Point - 2018 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2019-019, Annual Non-Radiological Environmental Operating Report2019-03-26026 March 2019 Annual Non-Radiological Environmental Operating Report PNP 2018-058, Independent Spent Fuel Storage Installation Radioactive Effluent Release2018-12-10010 December 2018 Independent Spent Fuel Storage Installation Radioactive Effluent Release ML18187A0302018-07-23023 July 2018 Cooling Tower Retrofit Is Feasible and Cost-Effective PNP 2017-029, Transmittal of 2016 Radiological Environmental Operating Report2017-05-10010 May 2017 Transmittal of 2016 Radiological Environmental Operating Report PNP 2017-027, Submittal of 2016 Annual Non-Radiological Environmental Operating Report2017-04-28028 April 2017 Submittal of 2016 Annual Non-Radiological Environmental Operating Report PNP 2017-009, Transmittal of 2016 Annual Radioactive Effluent Release and Waste Disposal Report2017-04-28028 April 2017 Transmittal of 2016 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2016-063, Mitigating Strategies Assessment for Flooding Submittal2016-12-19019 December 2016 Mitigating Strategies Assessment for Flooding Submittal ML16139A0492016-05-12012 May 2016 2015 Radiological Environmental Operating Report. Part 1 of 4 ML16139A0532016-05-12012 May 2016 2015 Radiological Environmental Operating Report. Part 4 of 4 PNP 2016-032, 2015 Radiological Environmental Operating Report. Part 2 of 42016-05-12012 May 2016 2015 Radiological Environmental Operating Report. Part 2 of 4 ML16139A0522016-05-12012 May 2016 2015 Radiological Environmental Operating Report. Part 3 of 4 PNP 2016-031, Transmittal of 2015 Annual Non-Radiological Environmental Operating Report2016-04-28028 April 2016 Transmittal of 2015 Annual Non-Radiological Environmental Operating Report PNP 2016-024, Transmittal of 2015 Annual Radioactive Effluent Release and Waste Disposal Report2016-04-25025 April 2016 Transmittal of 2015 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2015-028, 2014 Radiological Environmental Operating Report2015-05-14014 May 2015 2014 Radiological Environmental Operating Report PNP 2015-027, Submittal of 2014 Annual Non-Radiological Environmental Operating Report2015-04-27027 April 2015 Submittal of 2014 Annual Non-Radiological Environmental Operating Report PNP 2015-029, Annual Radioactive Effluent Release and Waste Disposal Report2015-04-27027 April 2015 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2014-040, 2013 Radiological Environmental Operating Report2014-05-15015 May 2014 2013 Radiological Environmental Operating Report PNP 2014-044, & Big Rock Point - 2013 Annual Radioactive Effluent Release and Waste Disposal Report2014-04-30030 April 2014 & Big Rock Point - 2013 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2014-037, 2013 Personnel Exposure and Monitoring Report2014-04-10010 April 2014 2013 Personnel Exposure and Monitoring Report PNP 2013-043, Radiological Environmental Operating Report, January 1, 2012 Through December 31, 20122013-05-0606 May 2013 Radiological Environmental Operating Report, January 1, 2012 Through December 31, 2012 PNP 2013-042, Submittal of 2012 Annual Non-Radiological Environmental Operating Report2013-04-23023 April 2013 Submittal of 2012 Annual Non-Radiological Environmental Operating Report PNP 2013-038, 2012 Annual Radioactive Effluent Release and Waste Disposal Report2013-04-23023 April 2013 2012 Annual Radioactive Effluent Release and Waste Disposal Report ML12179A3022012-05-14014 May 2012 Radiological Environmental Operating Report for 2011 PNP 2012-047, 2011 Radiological Environmental Operating Report, Letter Through Attachment 32012-05-14014 May 2012 2011 Radiological Environmental Operating Report, Letter Through Attachment 3 ML12215A3362012-05-14014 May 2012 2011 Radiological Environmental Operating Report, Attachment 4 Through End PNP 2012-032, & Big Rock Point, Submittal of 2011 Annual Radioactive Effluent Release and Waste Disposal Report2012-04-26026 April 2012 & Big Rock Point, Submittal of 2011 Annual Radioactive Effluent Release and Waste Disposal Report ML12121A0082012-04-26026 April 2012 Submittal of 2011 Annual Non-radiological Environmental Operating Report PNP 2011-038, 2010 Annual Radioactive Effluent Release and Waste Disposal Report2011-05-0202 May 2011 2010 Annual Radioactive Effluent Release and Waste Disposal Report PNP 2011-036, Submittal of 2010 Annual Non-Radiological Environmental Operating Report2011-04-26026 April 2011 Submittal of 2010 Annual Non-Radiological Environmental Operating Report ML1015303032010-05-14014 May 2010 Submittal of 2009 Radiological Environmental Operating Report ML1011900842010-04-28028 April 2010 Submittal of 2009 Annual Non-radiological Environmental Operating Report ML0913406782009-05-14014 May 2009 Submittal of 2008 Radiological Environmental Operating Report ML1011600472009-04-29029 April 2009 2008 Annual Radioactive Effluent Release and Waste Disposal Report (Attached) ML0912006752009-04-29029 April 2009 Palisade - Submittal of 2008 Personnel Exposure and Monitoring Report ML0813002532008-04-29029 April 2008 2007 Annual Radioactive Effluent Release and Waste Disposal Report 2024-04-23
[Table view] Category:Letter type:PNP
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2024-003, License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-24024 May 2024 License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-025, Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 02024-05-23023 May 2024 Supplement to Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments, Proposed Power Operations Quality Assurance Program Manual, Revision 0 PNP 2024-023, Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis2024-05-0909 May 2024 Pre-Submittal Meeting Presentation - License Amendment Request to Approve the Biasi Critical Heat Flux (CHF) Correlation for Use with the Palisades Main Steam Line Break (MSLB) Analysis PNP 2024-005, License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-05-0101 May 2024 License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-008, Annual Radioactive Effluent Release Report2024-04-23023 April 2024 Annual Radioactive Effluent Release Report PNP 2024-009, Annual Radiological Environmental Operating Report2024-04-23023 April 2024 Annual Radiological Environmental Operating Report PNP 2024-017, 2023 Annual Non-Radiological Environmental Operating Report2024-04-23023 April 2024 2023 Annual Non-Radiological Environmental Operating Report PNP 2024-016, Notice of Intent to Pursue Subsequent License Renewal2024-04-18018 April 2024 Notice of Intent to Pursue Subsequent License Renewal PNP 2024-006, Notification of Changes in Accordance with 10 CFR 50.82(a)(7)2024-04-0909 April 2024 Notification of Changes in Accordance with 10 CFR 50.82(a)(7) PNP 2024-001, License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-02-0909 February 2024 License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments PNP 2023-033, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-021, Ventilated Storage Cask Inspection Summary Report2023-08-16016 August 2023 Ventilated Storage Cask Inspection Summary Report PNP 2023-023, Special Report – High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report – High Range Noble Gas Monitor Inoperable PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance PNP 2022-031, License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements2022-09-14014 September 2022 License Amendment Request, Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2022-025, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 182022-09-12012 September 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 18 PNP 2022-032, 2022 Evacuation Time Estimate Report2022-09-0707 September 2022 2022 Evacuation Time Estimate Report PNP 2022-023, Report of Changes to Palisades Nuclear Plant Security Plan, Revision 172022-08-15015 August 2022 Report of Changes to Palisades Nuclear Plant Security Plan, Revision 17 PNP 2022-014, Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 342022-07-13013 July 2022 Report of Changes to Palisades Nuclear Plant Site Emergency Plan, Revision 34 PNP 2022-016, License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-07-12012 July 2022 License Amendment Request: Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-017, Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E2022-07-11011 July 2022 Request for Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47(b); 10 CFR 50.47(c)(2); and 10 CFR Part 50, Appendix E PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals PNP 2022-010, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2022-06-13013 June 2022 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel PNP 2022-011, Termination of the Emergency Response Data System (Eros) Link2022-06-13013 June 2022 Termination of the Emergency Response Data System (Eros) Link 2024-08-02
[Table view] |
Text
-
~ Entergy Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager PNP 2020-017 April 15, 2020 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
2019 Annual Non-Radiological Environmental Operating Report Palisades Nuclear Plant Docket 50-255 Renewed Facility Operating License No. DPR-20
Dear Sir or Madam:
Entergy Nuclear Operations, Inc (ENO) is providing the Palisades Nuclear Plant (PNP)
Annual Non-Radiological Environmental Operating Report for 2019. This report was prepared in accordance with the PNP Renewed Facility Operating License, Appendix B, section 5.4.1. The attached report describes the implementation of the Environmental Protection Plan from January 1, 2019, through December 31, 2019.
This letter contains no new commitments and no revisions to existing commitments.
Respectfully, JAH/bed
Attachment:
- 1. 2019 Annual Non-Radiological Environmental Operating Report
- 2. Herbicide and Pesticide Treatments cc: Administrator, Region 111, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
ATTACHMENT 1 2019 ANNUAL NON-RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT
1.0 BACKGROUND
Appendix B of the Renewed Facility Operating License for the Palisades Nuclear Plant (PNP) requires the submittal of an annual environmental operating report to the Nuclear Regulatory Commission (NRC), describing the implementation of the Environmental Protection Plan (EPP) during the previous year. The reporting period is January 1, 2019, through December 31, 2019.
The PNP operated for 8,605.45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> and produced a net total of 6,864,356 MWHe during 2019. This represents 97 .1 % of the net demonstrated capacity of the design electric rating of 805 MWe.
2.0 ENVIRONMENTAL IMPACT EVALUATIONS During 2019, there were four projects that underwent the Environmental Review process IAW EN-EV-115. The Engineering Changes are as follows:
Engineering Change, EC-81490 was performed to shift the fuel supply for M-8, Plant Heating Boiler, and M-61, Evaporator Heating Boiler, to T-926, Feedwater Purity Fuel Oil Tank, instead of T-1 0A, Fuel Oil Storage Tank. The modification consisted of isolating and abandoning fuel oil supply from T-10A, isolating and abandoning T-28, Plant Heating Boiler Fuel Oil Day Tank, and T-39, Evaporator Heating Boiler M-61 Day Tank, and associated components.
Additionally, P-947A/P-947B was upgraded to supply the required additional fuel oil and the fuel loop was tied-in to supply M-8 and M-61. The spill plan was updated to encompass the modification. The EC and work were completed in 2019.
Engineering Change, EC-81493 was performed to replace M-61, Evaporator Heating Boiler, fuel oil burner. The fuel oil burner for M-61 was aging, was slightly oversized for the required heating loads, and a higher turn down ratio was desired. The new burner is more efficient than the existing burner and while the Ml DEQ was notified of the upgrades, no permit or permit to install this new burner were necessary. The EC and the work were completed in 2019.
Engineering Change, EC-81644 was performed to replace M-61, Evaporator Heating Boiler stack. There were no significant changes from existing stack height and diameter during stack replacement. The review of the summary of design evaluation details relative to change in exhaust flow exiting the new stack (an increase in flow of 0.5% over existing) was insignificant.
The EC and work were completed in 2019.
Engineering change, EC 55441 was performed to install piping to cross connect T-2, Condensate Receiver Tank and T-939, Make-up Demineralized Water Storage Tank.
All land disturbances were in the protected area and were previously disturbed areas. The Spill Prevention, Control and Countermeasure (SPCC) Plan and Pollution Incident Prevention Plan (PIPP) was updated to reflect the changes. There was no impact to environmental conditions.
The work was started in 2016 with work completion in 2019.
Page 1 of 2
There were no additional changes, tests, or experiments that involved un-reviewed environmental questions or EPP changes.
3.0 ADDITIONAL ACTIVITIES AUTHORIZED UNDER NPDES In-accordance with the department of Environment, Great Lakes and Energy (EGLE) requirements a National Pollutant Discharge Elimination System (NPDES) permit application renewal was applied for and verified as being received by the State of Michigan prior to required due dates. Palisades' new NPDES permit has not been received from the State of Michigan at this time; however, by submitting by the required due date, in accordance with the process, Palisades is still covered under the old NPDES permit. No changes at this time are expected to the permit. No additional activities were authorized under the NPDES permit.
The Air Operating Permit renewal application package was submitted and received by the State prior to the required due date in accordance with Article II, Chapter 1, Part 55 (Air Pollution Control) of P.A.451 of 1994 and the federal Clean Air Act of 1990. Palisades has received the new approval Air Operating Permit.
4.0 UNUSUAL ENVIRONMENTAL EVENTS No unusual environmental events occurred during 2019.
5.0 ENVIRONMENTAL MONITORING TruGreen and the Buildings and Grounds work group treated areas of the property for vegetation management during 2019. Rose Pest Solutions treated areas of the property for tick and pest control. Herbicides were not applied to the transmission line exit corridor in 2019.
The application of herbicides and pesticides is documented in Attachment 2.
6.0 NON-ROUTINE REPORTS During 2019, no non-routine reports were generated.
Page 2 of 2
ATTACHMENT 2 HERBICIDE & PESTICIDE TREATMENTS Company: TruGreen 9077 Portage Industrial Portage, Michigan 49024-9935 Date & Treatment Amounts:
April 11, 2019 (495 pounds applied)
May 23, 2019 (1.86 gallons applied)
July 16, 2019 (495 pounds applied)
July 16, 2019 (0.5 gallons applied0 August19,2019 (495 pounds applied)
August 19, 2019 (1.54 gallons applied)
September 19, 2019 (413 pounds applied)
September 19, 2019 (0.02 Gallons applied)
October 18, 2019 (495 pounds applied)
October 18, 2019 (0.10 gallons applied)
November 21, 2019 (495 pounds applied)
- Liquid volumes are the active chemicals used and do not include the dilution water.
Commercial Names of Products in Solution: Dimension, Tru Power 3, Payload, Oust XP, Escalade 2, Razor Pro, Barricade, tripower Chemical Name of Products:
Tru power 3- Triisopropanolamine Salt of 2, 4-Dichlorophenoxyacetic Acid, Dimethylamine Salt of (+)-R-2-(2-Methyl-4-Chlorophenoxy) propionic acid, Dicamba Acid Razor: -Glyphosate, N(phosphonomethly) glycine, in the form of its isoprophlamine salt, Ethoxylated Tallowamines Tripower: Dimethyliamine salt of 2- methyl 4-chloicophenoxy acid, Dimethalyne salt of
(+)-R-2-(2-methl-4-chlorophynoxy)proprionic acid, Dimethylamine salt of Dicamba (3,6-Dichloro-o-anisic acid)
Payload- Flumioxazin (2-[7-fluoro-3,4-dihydro-3-oxo-4-(2-propynyl)-2H-1,4-benzoxazin-6-yl]-4,5,6, 7-tetrahydro-1 H-isoindole-1,3(2H)-dione)
Barricade- - Attapulgite Clay, Crystalline Silica, Quartz, Propylene Glycol, Prodiamine Oust XP- Sulfometuron methyl {Methyl2-(((((4,6-dimethyl-2-pyrimidinyl ) amino J-carbony IJamino J-sulfonyl)benzoate}
Page 1 of 5
Concentration of Active Ingredient in Field Use Mix:
One solution was mixed together that contained the following:
53 oz. of active ingredients per 11 gallons of solution per acre applied Diluting Substance: Water for wet applications No dilutions for dry applications Rate of Application: Liquid (Tru power 3, Tripower, Barricade, Razor Pro, Payload, Oust XP): 25 gallons per 1000 ft2 liquid application Dry: 3 lbs. per 1000 ft2 applied (fertilizer)
Total Amount Used: 4.0 Gallons total volume used for liquid treatment***
2888 Pounds total volume used for dry treatment
- Liquid volumes are the active chemicals used and do not include the dilution water.
Method of Application: Hand sprayer for liquids Broadcast spreader for dry application Frequency of Application: Throughout the year as needed Location: Along and near roadways, fence lines, walkways, parking lots, Containment areas, substations, cooling towers, protected area, and microwave zones Purpose of Treatment: Fertilize, and control of weed species, crabgrass, nuisance vegetation, broad leaf vegetation Page 2 of 5
Company: Entergy - Palisades Building and Grounds 27780 Blue Star Memorial Highway Covert, Michigan 49043 Date of Treatment: July 23, 2019 (1.5 gallons applied)
September 20, 2019 (2.5 gallons applied)
Commercial Names of Products in Solution: Roundup Ready-To-Use Extended Control Weed & Grass Killer Plus Weed Preventer II Chemical Names of Products:
Roundup Ready-To-Use Extended Control Weed & Grass Killer Plus Weed Preventer II - Nonanoic and related fatty acids; {Pelargonic and related fatty acids}
lsopropylamine salt of N-(phosphonomethyl)glycine; {lsopropylamine salt of glyphosate}
Ammonium salt of 2-[4,5-dihydro-4-methyl-4-(1-methyl)-5-oxo-1 H-imidazol-2-yl] methyl-3-pyridinecarboxylic acid; {Ammonium salt of imazapic}
Concentration of Active Ingredient in Field Use Mix:
One solution was mixed together that contained the following:
1 gallon of (Roundup Ready-To-Use Extended Control Weed & Grass Killer Plus Weed Preventer II) applied to 235 square feet Diluting Substance: No dilution is performed as product is purchased in ready to use concentrations Rate of Application: 1 gallon per 235 square feet liquid application (Roundup Ready-To-Use Extended Control Weed & Grass Killer Plus Weed Preventer II)
Total Amount Used: 4 Gallons total volume used for liquid treatment Method of Application: Hand sprayer for liquids Frequency of Application: Throughout the year spot treatments between TruGreen applications as needed Location: Along and near roadways, fence lines, walkways, parking lots, Containment areas, substations, cooling towers, protected area, and microwave zones Purpose of Treatment: Fertilizer, control of weed species, crabgrass, nuisance vegetation, nuisance broadleaf vegetation Page 3 of 5
Company: Rose Pest Solutions 2714 South 11th St. Ste B Niles, Michigan 49120-4420 Date of Treatment: Jan 14, 2019 (80 grams applied)
Jan 28,2019 (30 pounds applied)
Feb 11,2019 (40 pounds applied)
Feb 25, 2019 (240 grams applied)
Mar 4, 2019 (30 pounds applied)
Mar 11, 2019 (460 grams applied)
Mar 25, 2019 (220 grams applied)
Mar 25, 2019 (30 pounds applied)
April 8, 2019 (20 pounds applied)
April 8, 2019 (20 gram applied)
April 22, 2019 (240 grams applied)
May 13, 2019 (360 grams applied)
May 28, 2019 (10 pounds applied)
May 28, 2019 (460 grams applied)
June 10, 2019 (30 pounds applied)
June 10, 2019 (420 grams applied)
June 24; 2019 (110 grams applied)
June 24, 2019 (30 pounds applied)
July 8, 2019 (30 pounds applied)
July 8, 2019 (320 grams applied)
July 22, 2019 (400 grams applied)
July 22, 2019 (30 pounds applied)
Aug 12, 2019 (30 pounds applied)
Aug 12, 2019 (180 Grams applied)
Aug 26, 2019 (540 Grams applied)
Sept. 09, 2019 (120 grams applied)
Sept12,2019 (80 grams applied)
Sept. 23, 2019 (80 grams applied)
Oct. 14, 2019 (160 grams applied)
Oct. 28, 2019 (340 grams applied)
Nov. 11,2019 (120 grams applied)
Nov.25,2019 (220 grams applied)
Dec.09,2019 (400 grams applied)
Dec. 11,2019 (140 grams applied)
Dec.26,2019 (180 grams applied)
Commercial Names of Products in Solution: Final All-Weather Blox, Maxforce FC Select Roach Killer Bait Gel and OvoControl P Page 4 of 5
Chemical Names of Products:
Final AW Blox - Brodifacoum [3-[3-(4'-Bromo-[1, 1'-biphenyl]-4-yl)-1,2,3,4-tetrahydro-1-naphthalenyl]-4-hydroxy-2H-1-benzopyran-2-one]
Ovo Control P - Nicarbazine [4,4'-Dinitrocarbanilide and 2-Hydroxy-4,6-dimethylpyrimidine]
Maxforce FC Select Roach Killer Bait Gel - Fipronil: 5-amino-1-[2,6-dichloro (trifluoromethyl)phenyl] (trifluoromethylsulfinyl)-1 H-pyrazole-3-carbonitrile Concentration of Active Ingredient in Field Use Mix:
Diluting Substance: No dilutions for dry applications Total Amount Used (active ingredient amounts):
5890 Grams total volume used for dry treatment 310 pounds total volume for OvoControl Method of Application: Bait Station Installation for dry application Frequency of Application: Throughout the year as needed Location: Along and near roadways, fence lines, walkways, and the protected area Purpose of Treatment: Tick, Mice and Roach control; and Ovo Control P for reducing the pigeon egg hatch on site Page 5 of 5